MST 326 Lecture 7 Project planning John Summerscales School of Engineering University of Plymouth.

Slides:



Advertisements
Similar presentations
CP Chapter 4 Schedule Planning.
Advertisements

F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
Scheduling the Project
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
MEM 612 Project Management Chapter 5 Scheduling the Project.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
Manjari Akella Pranava Nagpal B-Tech(CSE) 4 th Year.
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Chapter 10 Project Scheduling: PERT/CPM
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Importance of Project Schedules
BA 333 Operations Management
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
Prepared by: Michael Palazzo
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
HIT241 - TIME MANAGEMENT Introduction
Software Project Management Task Sequencing Activity Sequencing Concepts PERT charts Critical Path Analysis.
Dr. Godfried Williams1 Project Management – Topic 6 Lecture Content Planning Tools/Techniques Optimization Techniques Resource Planning & Allocation Linear.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Project Management Project Planning Estimating Scheduling.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
Project Planning Techniques U08784Software Project Management Rosemary Phillimore.
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Applied Software Project Management PROJECT SCHEDULES Applied Software Project Management 2:16:07 AM 1.
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
MEM 612 Project Management Chapter 5 Scheduling the Project.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Project Management SAI’s Class. Project Management Task Cadets will create a project management plan and their project. a. Define the stages of project.
PROJECT MANAGEMENT TOOLS AND TECHNIQUES SEMINAR December 2003.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
IE 366 Chapter 6, Section 10 Project Planning and Scheduling.
Managing the Information Systems Project Cont’d
Chapter 16 – Project Management
Project Management – PTM721S
PROJECT MANAGEMENT TOOLS AND TECHNIQUES
PROJECT MANAGEMENT.
Business System Development
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
PERT & GANTT CHARTS An Introduction.
REQUIREMENTS Project management tools
Project Management.
Project Planning & Scheduling
Project Management and scheduling
Project Time Management
SE Tasks for a Concept Development Project
Software Project Management
PERT - The Program Evaluation and Review Technique
Project Management: A Managerial Approach
Chapter 16 – Project Management
I love the sound they make as they fly by.
Project Management CPM/PERT Professor Ahmadi.
PROJECT MANAGEMENT TOOLS AND TECHNIQUES
REQUIREMENTS Project management tools
Presentation transcript:

MST 326 Lecture 7 Project planning John Summerscales School of Engineering University of Plymouth

Golden rule: “A golden rule in terms of estimating the time required is to assume people are only productive four out of five days” C Sheldon and M Yoxon, Environmental Management Systems – third edition, Earthscan, London and Sterling VA, 2006.

Lecture outline l Gantt charts l Project Evaluation Review Technique (PERT) l Critical Path Analysis/Method (CPA/CPM) l Technology Road Maps (TRM)

What is a project ? a group of people brought together to achieve a defined objective in a defined period of time and with defined resources

Measuring success? l deliverables: what will be achieved l deadlines: when will it happen l milestones: end of each significant stage l are there quantitative parameters ?

Success or failure ? deadline achieved or if not then why? budgets met or reasons for variances acceptability of the finished item match to specification/customer expectations consequences culture change or new strategic alliances

Project management l develops innovative, creative and committed managers l provides a vehicle for measurement of resource effectiveness and for optimisation l permits strategic accountability

Henry Laurence Gantt graphical representation of the duration of tasks plotted vs time e.g. student timetable load chart shows workload relative to capacity one row per person vs hours in the day progress chart shows succession of tasks from start to finish

Gantt chart: progress chart

Gantt chart: CFD of RIFT research

MS Project... formats Calendar Gantt chart Network diagram Task usage Resource graph Resource sheet Resource usage Report

Program Evaluation Review Technique (PERT) l graphic representation of schedule for project –developed by USN for Polaris missile programme l shows –sequence of tasks –which tasks can be performed simultaneously –permits determination of the critical path for the individual tasks to be completed on time in order for the project to meet its completion deadline

Critical Path Analysis/Method l developed by the private sector at the time that PERT was started –has become synonymous with PERT –referred to as any of CPM, PERT or PERT/CPM l critical path is the set of individual tasks (each dependent on the preceding one) which taken together require the longest time to complete (i.e. minimum time) l can be much more difficult to interpret than a Gantt chart.

Node in a PERT chart

Network diagram for printer Figure 10.1 from Curtis book

Activity on node structure Figure 10.2 from Curtis book

Printer project activity on node activity times Figure 10.3 from Curtis book

Printer project activity on node earliest start times Figure 10.4 from Curtis book

Printer project activity on node latest finish times Figure 10.5 from Curtis book

Float for manufacture of the prototype Figure 10.6 from Curtis book

Bar chart for printer project Figure 10.7 from Curtis book

Projects and resource loading Figure 10.8 from Curtis book

Resource levelling Figure 10.9 from Curtis book

Basic CPM diagram Figure 3-18 from Hicks book

CPM Diagram with timings Figure 3-20 from Hicks book

Tabular analysis Table 3-8 from Hicks book

Time-scaled CPM network Figure 3-21 from Hicks book

A beta distribution in PERT Figure 3-22 from Hicks book

Beta distribution calculation A = most optimistic time M = most likely time B = most pessimistic time X = mean = (A + 4M +B)/6 S 2 = variance = [(B - A)/6] 2 Times A and B expected to occur only 1% of the time

Density function for project completion time Figure 3-23 from Hicks book

References l Tony Curtis, Business and Marketing for Engineers and Scientists, McGraw-Hill, Maidenhead, ISBN l Philip E Hicks, Industrial Engineering and Management - a new perspective, McGraw-Hill, ISBN l Richard Pettinger, Introduction to Management, Macmillan, Basingstoke, ISBN

Technology Road Maps (TRM) l the most basic form can be considered as a time-based chart consisting of a number of layers –commercial, –technological, –legislative, and –environmental perspective

Technology Road Maps (TRM) l Developing a Technology Road Map requires three steps: –Market requirements forecast, –Product implications forecast, and –Technology implications forecast.