CHAPTER 3 PROJECT MANAGEMENT.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Facilitated by Joanne Fraser RiverSystems
Chapter 3 Managing the Information Systems Project
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
© 2008 by Prentice Hall 3-1 ITCS311 Systems Analysis and Design Dr. Taher Homeed Feb 2010 Department of Computer Science College of IT University of Bahrain.
Systems Analysis and Design 9th Edition
Prof. Mohammad Moizuddin
Systems Analysis and Design 8 th Edition Chapter 3 Managing Systems Projects.
Project What is a project A temporary endeavor undertaken to create a unique product, service or result.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Feasibility and Cost/Benefit Analysis. Cost considerations u Cost classifications –Tangible / Intangible –Direct / Indirect –Fixed / Variable –Developmental.
Systems Analysis and Design 8th Edition
Jump to first page Dr. Henry Deng Assistant Professor MIS Department UNLV IS 488 Information Technology Project Management.
Modern Systems Analysis and Design Third Edition
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Systems Analysis & Design Sixth Edition Systems Analysis & Design Sixth Edition Toolkit Part 4.
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
The Systems Analysis Toolkit Project Management Tools.
Planning. SDLC Planning Analysis Design Implementation.
Project Management and Scheduling
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
Toolkit 4.
To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout.
Chapter 3 : Managing the Information Systems Project.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Feasibility and Cost/Benefit Analysis. Cost considerations u Cost classifications –Tangible / Intangible –Direct / Indirect –Fixed / Variable –Developmental.
Systems Analysis and Design 10th Edition
PowerPoint Presentation for Dennis, Wixom, & Tegarden Systems Analysis and Design with UML, 3rd Edition Copyright © 2009 John Wiley & Sons, Inc. All rights.
Project Management Chapter 3. Objectives Become familiar with estimation. Be able to create a project workplan. Understand why project teams use timeboxing.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Appendix A Project Management: Process, Techniques, and Tools.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Lecture 3 Scheduling CSCI – 3350 Software Engineering II Fall 2014 Bill Pine.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
Jump to first page Dr. Henry Deng Assistant Professor MIS Department UNLV IS 488 Information Technology Project Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
CS211 Slide 10-1 ADCS 21 Feasibility and Cost Analysis Tools Project Management Tools Alternative System Development Methodologies (Chapter 10) Tools for.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
Chapter 3 Managing the Information Systems Project
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Managing the Information Systems Project 3.1.
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Department of Industrial Engineering Sharif University of Technology Session #7.
Project Time Management
Project Management Why do projects fail? Technical Reasons
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
WEEK 3 Project Planning.
The Project Management Process Groups
PROJECT MANAGEMENT TOOLS AND TECHNIQUES SEMINAR December 2003.
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Managing Systems Projects
Modern Systems Analysis and Design Third Edition
Importance of Project Schedules
Modern Systems Analysis and Design Third Edition
Presentation transcript:

CHAPTER 3 PROJECT MANAGEMENT

Chapter Objectives Explain project planning, scheduling, monitoring and reporting Describe work breakdown structures, task patterns and critical path analysis Explain techniques for estimating task completion times and costs Describe various scheduling tools, including Gantt charts and PERT/CPM charts Analyze task dependencies, durations, start dates, and end dates Identify examples of project management software and explain how these programs can assist you in project planning, estimating, scheduling, monitoring, and reporting Discuss the importance of project risk management Understand why projects sometimes fail

Overview Of Project Management Project Management includes planning, scheduling, monitoring, and controlling and reporting an information system development A successful project must be completed on time, within budget, and deliver a quality product that satisfies users and meets requirements Project manager or project leader-usually a senior system analyst or an IT department manager (if large project) Analyst, programmer/analyst-manage small project Project coordinator-handles administrative responsibilities for the team and negotiates with users who might have conflicting requirements or want changes that would require additional time or expense.

If one factor changes, adjustment must be made to keep things in balance Budget Time Quality Project Success

Project managers typically perform four main tasks: Project planning-identifying all project tasks and estimating the completion time and cost of each Project scheduling-involves the creation of a specific timetable, usually in the form of charts. Selecting and assigning staff to specific tasks Project monitoring and controlling-guiding, supervising and coordinating the project team’s workload Project reporting-regular progress reports to management, users and the project team itself.

Project Activities and Planning Steps 3 key steps in project planning: Step 1: create a work breakdown structure Breaking a project down into a series of smaller tasks. Should understand 2 chart types: Gantt chart PERT/CPM chart

Gantt Charts

PERT/CPM Charts The Program Evaluation Review Technique (PERT) Critical Path Method (CPM) The distinctions between the two methods have disappeared over time, and today the technique is called either PERT, CPM, or PERT/CPM PERT/CPM is called a bottom-up technique because it analyzes a large, complex project as a series of individual task. Once you know the tasks, their duration, and the order in which they must be performed, you can calculate the time that it will take to complete the project PERT chart are more useful for scheduling, monitoring and controlling the actual work.

Identifying tasks in a work breakdown structure A work breakdown structure must clearly identify each task and include an estimated duration Task or activity : any work that has a beginning and end and requires the use of company resources ( people, time, money) Event or milestone: recognizable reference point that you can use to monitor progress. E.g.: Task and events that might be involved in the creation, distribution and tabulation of questionnaire.

Steps in WBS Listing the task Highlighting the individual task Adding bullet to with column for task number, description,duration and predecessor tasks. Estimating Task Duration Person-day: represents the work that one person can complete in one day Some tasks can be divided evenly so it is possible to use different combinations of time and people, up to a point In most systems analysis tasks, however, time and people are not interchangeable

Displaying the WBS –Gantt Chart B=best-case estimate P=probable -case estimate W=pessimistic/worst –case estimate Formula (B+4P+W) 6 Example: a project manager estimate that a file conversion task could be completed in as few as 20 days or could take as many as 34 days,but most likely will require 24 days. Calculate the expected task duration. Answer: (20+(4*24)+34)=25 Factors affecting Duration: Project size Human resources Experience with similar projects Constraints Displaying the WBS –Gantt Chart

Step 2:Identifying Tasks Pattern Task pattern: task in a work breakdown structure that arranged in a logical sequence Main type of Task Patterns Dependent Tasks-when task must be completed one after another Multiple successor tasks-when several tasks can start at the same time Concurrent task Predecessor task Successor task Multiple Predecessor Tasks-a task requires two or more prior tasks to be completed before it can start

PERT/CPM Charts PERT/CPM Tasks Task box Task ID Task name Task Duration Start Day/Date Finish Day/Date

Dependent task & multiple successor tasks: 1 2 Dependent task & multiple successor tasks: 1 2 3 4 5 6

Dependent task, multiple successor and multiple predecessor task tasks: 5 7 3 1 2 6 8 4

Complex Task Patterns When various task patterns combine, you must study the facts carefully in order to understand the logical sequence A project schedule will not be accurate unless the underlying task pattern is logically correct

Step 3: Calculate the Critical Path Critical path is a series of task if delayed, would affect the completion date of the overall project If any task along the critical path falls behind schedule, the entire project is delayed A critical path includes all tasks that are vital to the project schedule If necessary, a project manager can reassign resources to keep the project on schedule Slack time –amount of time that the task could be late without pushing back the completion date of the entire project.

A PERT/CPM Example with Five Tasks

Project Monitoring and Control The project manager must keep track of tasks and progress of team members, compare actual progress with the project plan, verify the completion of project milestones, and set standards and ensure that they are followed Monitoring and Control Techniques Structured walkthrough-review the work of other systems analyst, programmers review the work of other programmers as a form of peer review Called design reviews, code reviews, or testing reviews

Maintaining a Schedule Maintaining a project schedule can be a challenging task The better the original plan, the easier it will be to control the project If enough milestones and frequent checkpoints exist, problems will be detected rapidly Project managers often spend most of their time tracking the tasks along the critical path

Project Reporting Project status meeting Project managers schedule regular meetings to update he team and discuss project status, issues problems and opportunities. The session give team members an opportunity to share information, discuss common problems and explain new techniques. Also give the project manager an opportunity to seek input and conduct brainstorming sessions

Project Reporting Project Status Reports A project manager must report regularly to his or her immediate supervisor, upper management, and users Should explain what you are doing to handle and monitor the problem Most managers recognize that problems do occur on most projects; it is better to alert management sooner rather than later

Project Status Meetings Members of the team regularly report their progress to the project manager ,who in turn reports to management and users. Project Status Meetings

Project Management Example PERT /CPM Steps to create PERT/CPM chart: Step1:create the work breakdown structure Identify tasks, determine task dependencies, enter task name,ID and task duration Step 2: enter start and finish times

Transforming a Task List into a PERT/CPM Chart

Transforming a Task List into a PERT/CPM Chart

Software driven example: A Sample Project Using Microsoft Project and Open Workbench

A Sample Project Using Microsoft Project and Open Workbench

Risk Management Every IT project involves risks that systems analysts and project managers must address A risk is an event that could affect the project negatively. Risk management is the process of identifying, analyzing, anticipating and monitoring risks to minimize their impact on the project

MS Excel XY chart type can be used to display a risk matrix that shows risk probability and potential impact

Project Risk Management Steps in Risk Management Develop a risks management plan Identify the risk Analyze the risk Qualitative risk analysis Quantitative risk Create a risk response plan Monitor risks

Risk Management Software Tools Most project management software programs, such as Microsoft Project, contain various tools that a project manager can use The IT team can make a recommendation regarding the risks Depending on the nature and magnitude of the risk, the final decision might be made by management Project Management Software Examples Microsoft Office Project Open Workbench Open-source software

Managing for Success When a project develops problems, the reasons typically involve business, budget or schedule issues Business Issues The major objective of every system is to provide a solution to a business problem or opportunity A system that falls short of business needs also produces problems for users and reduces employee morale and productivity

Budget Issues Cost overruns typically result from one or more of the following: Unrealistic estimates Failure to develop an accurate TCO forecast Poor monitoring of progress and inadequate reaction to early signs of problems Schedule delays due to unanticipated factors Human resource factors

Schedule Issues Problems with timetables and project milestones can indicate a failure to recognize task dependencies, confusion between effort and progress, poor monitoring and control methods, personality conflicts among team members, or turnover of project personnel

The Bottom Line Successful Project Management When problems occur, the project manager’s ability to handle the situation becomes the critical factor Sometimes, when a project experiences delays or cost overruns, the system still can be delivered on time and within budget if several less critical requirements are trimmed

Successful Project Management If a project is in trouble because of a lack of resources or organizational support, management might be willing to give the project more commitment and higher priority A typical response is to push back the completion date Option only if the original target date is flexible and the extension will not create excessive costs or other problems

Chapter Summary Project management is the process of planning, scheduling, monitoring and controlling, and reporting upon the development of an information system Begins with identifying and planning all specific tasks or activities Can use graphical tools such as Gantt charts and PERT/CPM charts to assist in the scheduling process Project managers are responsible for risk management Every successful information system must support business requirements, stay within budget, and be available on time Sound project management involves the same skills as any type of management

Review question What is project management and what are its main objectives? What are the key steps in project planning? Define the following terms: best case estimate, probable case estimate, and worst case estimate What is critical path, and why is it important to project managers? What are some project reporting and communication techniques? What is risk management and why is it important? State the steps in risk management.