BAR CHART Develop by Henry Gantt. Definitions Activity

Slides:



Advertisements
Similar presentations
Gantt Chart.
Advertisements

Project Management Techniques and tools Move mouse over arrow to enter presentation End Show.
Work Breakdown Structures
Project Management Information Systems and Management.
CIVL202 Construction Engineering I Tutorial 8 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Chapter 10: Project Schedule Planning
Planning & Scheduling Systems: From Design to Fabrication.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Spring 2008, King Saud University Bar Chart Dr. Khalid Al-Gahtani 1 What is Activity An activity or task is a given kind and amount of work which: –Consumes.
L ECTURE 5 – G ANTT C HART GANTT Charts Constructing GANTT Charts Staffing and Re-scheduling Project Management Software Software Project Management Maria.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
ASSIGNMENT 1 Model Answers. Question 1 Q1) Consider building a garden shed project, which involves designing the shed, figuring out what materials are.
Software project management Module 1 -Introduction to process management Teaching unit 1 – Introduction Ernesto Damiani Free University of Bozen-Bolzano.
CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.
CS 501: Software Engineering Fall 2000 Lecture 4 Management I: Project Management.
Review Questions Speculate as to the advantages and disadvantages of appointing project mangers from the ranks of senior systems analyst. The advantage.
CEM 510 Construction Planning & Scheduling Dr Almohawis
Winter 05 Project Schedule A Gantt Chart is a means of presenting the master schedule of activities for your project –Named for Henry L. Gantt ( ),
BAR CHART Develop by Henry Gantt. Definitions Activity
Prof. Awad Hanna Estimating Activity Duration Time Interval  Time Interval is selected according to the nature of the activity (seconds - minutes…) 
BAR CHART Paweł Bilski Piotr Mazur Paulina Wawryca.
The Gantt Chart in Project Management. What is a Gantt Chart?  A type of chart that shows the Work Breakdown Structure (WBS) in terms of the start and.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Planning Tools and Techniques BUS 206 Erlan Bakiev, Ph. D. Zirve University Spring 2012.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, All Rights Reserved Business Plug-In B15 Project Management.
Managing the Design Process Project must  Accomplish the goals - scope  Be done within resources - spending  Be done on time - scheduling.
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
BUSINESS PLUG-IN B15 Project Management.
This material is approved for public release. Distribution is limited by the Software Engineering Institute to attendees. Sponsored by the U.S. Department.
Planning Tools and Techniques Module
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Gantt Chart Heba Iqbal. What is a Gantt chart? Developed by Henry Gantt Were considered revolutionary when first introduced Type of bar chart Illustrates.
Module 7 Session 7.3 Visual 1 Module 7 Planning and Scheduling with the Critical Path Method Session 7.3 The computer and project management.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
Latifa AlAbdulkarim King Saud University October,2009.
12/2/2015 2:45 AM 1 PROJECT TIME PLANNING Process and Bar Chart Technique.
Gantt chart A graphical representation of the duration of tasks against the progression of time. Used for effective time management Lays out the order.
Business Management. 2 “Copyright and Terms of Service Copyright © Texas Education Agency. The materials found on this website are copyrighted © and trademarked.
Project Management.
1 EASTERN MEDITERRANEAN UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING CIVL 493 Construction Management Assoc. Prof. Dr. Ibrahim YITMEN.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 10 Projects.
Prof Awad S. Hanna Project : Student Residence  New Project  Desired Capacity = 750,000 sq. ft  Expected Completion = End of 1998  Location = St. Louis,
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Program and Quality.
Linear Scheduling Method Definition A simple diagram to show location and time at which a certain crew will be working on a given operation. Characteristics.
Prof. Awad Hanna Project Control  Major objectives for a good control plan. 1.Should accurately represent the work. 2.Permit deviations to be detected,
Management, Eleventh Edition by Stephen P. Robbins & Mary Coulter ©2012 Pearson Education, Inc. publishing as Prentice Hall 9A-1.
Estimating and Scheduling CEE 492
WEEK 3 Project Planning.
Survey Training Pack Session 17 – Budgeting and timelines for survey design and implementation.
Fundamentals of Project Management and Schedule Development.
Prof. Shrikant M. Harle.  Scheduling is a process which tries to organize activities in logical sequence.  While it is not possible to know with certainty.
Project and Project Formulation and Management
WHAT IS A GANTT CHART.
Gantt Chart Presentation Name Course Name
PERT & GANTT CHARTS An Introduction.
Fall 06 ECE 361 Project Schedule
Gantt Charts.
ENGINEERING MANAGEMENT (GE 404)
PLANNING RESOURCES 1. Materials Need to determine 2. Equipment
What Will You Learn 1. How To Plan Projects
ENGINEERING MANAGEMENT (GE 404)
2. 2 Assessing the Environment Environmental scanning - the screening of large amounts of information to anticipate and interpret changes in the environment.
Gantt Chart.
ETI 4448 Applied Project Management
CEM 510 Construction Planning & Scheduling Dr Almohawis
Project Planning By Phaik San Liew.
Resource Planning, Cost Estimation and Budgeting
Project Timeline using Microsoft Project
Fault Tree Analysis Summary Process Steps
Presentation transcript:

BAR CHART Develop by Henry Gantt. Definitions Activity A graphical description of the project consisting of well-defined collection of tasks. Activity An activity is a task or closely related group of tasks whose performance contributes to the completion of the overall project. “Excavate Foundation”. Prof. Awad Hanna

BAR CHARTS ORGANIZATION Item Activity M10 Mobilization Bars (Month or Year) Prof. Awad Hanna

CONSTRUCTION THE BAR CHART When constructing a bar chart, the following questions must be answered: 1. What time units should be used? 2. Should work days or calendar days be used? 3. What about non continuous work? Additional information may be added to the basic bar chart such as activity value, cost and resource requirements. Prof. Awad Hanna

TYPE OF BAR CHART Type I Linear time-scaled for planning, Linear progress-scaled for reporting Assume the progress of the activity as a direct-linear function of the elapsed time. For this example Five months were originally scheduled for this activity. Reporting date at 3rd month, 60% of the elapsed time. Activity behind by 10% “May or may not be true”. Prof. Awad Hanna

Type I Bar Charts Jan Feb Mar Apr May (a) Type I Plan Bar Jan Feb Mar Reporting date (b) Type I Reporting: Version 1 Jan Feb Mar Apr May Reporting date (c) Type I Reporting: Version 2 Prof. Awad Hanna

TYPE OF BAR CHART (cont.) Type II Time scaled for planning - Time scaled for reporting. Planned cumulative progress % are written at the end of each time interval. No linearity the reporting bar gives no implication about the actual progress. Prof. Awad Hanna

Type II Bar Charts Jan Feb Mar Apr May (a) Type II Plan Bar Jan Feb Scheduled program 10 30 50 80 100 Original schedule (a) Type II Plan Bar Jan Feb Mar Apr May 10 30 50 80 100 Actual Time Work 8 28 55 Actual Progress Reporting date (b) Type II Reporting: Case 1 Jan Feb Mar Apr May Jun Jul 10 30 50 80 100 8 28 55 75 90 96 Reporting date (b) Type II Reporting: Case 2 Prof. Awad Hanna

BAR CHART ADVANTAGES AND DISADVANTAGES Easy to prepare Easily understood by all parties It shows the total plan in impact form. Good communication tool Disadvantages Do not show interrelationships between activities Managing projects becomes difficult without those relationships between activities It is difficult to judge the impact of an unexpected event on the rest of the construction process Prof. Awad Hanna