NTS to LDZ Meters – Audits & Validations Created by Alison Chamberlain on behalf of Transporters, for meeting 6 th August, 2010, 31 Homer Road Solihull.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Fire Risk Assessments – Are You Competent?. Fire safety legislation requires that, for most premises except private dwellings, a fire risk assessment.
Auditing, Assurance and Governance in Local Government
Module 13 Oversight Assessment of Auditor Authentication Bodies
Prepared and presented by Paul French AJA Registrars Operations Director AJA are a multi-accredited International Certification Body based in Portishead.
 Contracts  Subcontracting  Suppliers  Complaints  Corrective and preventive actions (CAPA)  Internal audits  Management reviews Management requirements.
FACILITIES MANAGEMENT Duty Holders process, FM and University James Stapleton FM Health, Safety and Risk Manager.
Japan Audit & Supervisory Board Members Association (JASBA) Explanatory Memorandum on the Audit & Supervisory Board Members (The companies with Audit &
SESSION 2 Key points Module 4 covers consultation requirements under the WHS Act and relies on participants having completed Modules 1 – 3 of this course.
Contractor Safety Management
Orifice Plate Meter Error Stuart Gibbons, Extraordinary Offtake Arrangements Workstream Meeting: 16 October 2009.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
ASPEC Internal Auditor Training Version
ISO 9000 Certification ISO 9001 and ISO
Quality Representative Training Version
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
CPA is a UKAS company The Assessment Process 2014 Seminars.
UKAS Key facts National Accreditation Body in the UK Self-funding private company limited by guarantee (Non-profit distributing) 180 full time staff.
S3: Module D Physikalisch-Technische Bundesanstalt Session 3: Conformity Assessment Module D Peter Ulbig, Harry Stolz Belgrade, 31 October.
Introduction to ISO New and modified requirements.
Introduction to Software Quality Assurance (SQA)
Offtake Metering Errors Stephen Skipp Asset Manager (Transmission and Storage)
| Folie | Folie 2 ISO approach to GHG-inventory QA/QC UNFCCC Workshop on National Systems April 2005, Bonn Doris.
Railway Transport Equipment (RTE) Certification Railway Transport Equipment Certification Procedure Application for railway transport equipment certification.
© Engineering Council (UK) 2002 Regulation and Accreditation in the UK Jim Birch Head of International Recognition.
Japan Audit & Supervisory Board Members Association (JASBA) Explanatory Memorandum on the Audit & Supervisory Board Members (The companies without Audit.
Local Assessment of Code of Conduct Complaints. 2 Background  On 08 May 2008 – the local assessment of Code of Conduct complaints was implemented due.
SANAS ACCREDITATION DEES DHANRAJ BEE Lead Assessor.
July 2013 What you need to know about procuring suppliers Deborah Ramshaw and Lois Shield.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Gas Performance Assurance Framework 11 th January 2013 Confidential.
1 Saxony-Anhalt EU Twinning RO 04/IB/EN/09 State Environmental Protection Agency Wolfgang GarcheBukarest National Reference Laboratory for Air.
Company Confidential Registration Management Committee RMC Auditor Workshop Charleston, SC July Supplemental Oversight AS9104/2A & Special.
1 A decade of revisions at UNCITRAL Special Course 6 – James Castello Lecture 3 Arbitration Academy PA R I S SUMMER COURSES
Click on Next to continue Next Introductio n Inputs Tools and Techniques Outputs The process of managing procurement relationships, monitoring contract.
Local Assessment of Code of Conduct Complaints. Background  On 08 May 2008 – the local assessment of Code of Conduct complaints was implemented due to.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Project management Topic 3 Quality.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
1 Modification Proposal 0199: Clarification around the application of the UNC Dispute Resolution Process Alison Chamberlain National Grid Distribution.
Development of Agreement Concerning the Adoption of Uniform Conditions for Periodical Technical Inspections of Wheeled Vehicles and the Reciprocal Recognition.
Internal/External Audit Corporate Governance part 5.
ENGINEER Engineer Duties: Carry out the duties assigned in the contract.Carry out the duties assigned in the contract. Engineer's staff shall include qualified.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Internal Audit Section. Authorized in Section , Florida Statutes Section , Florida Statutes (F.S.), authorizes the Inspector General to review.
Gas Performance Assurance Framework 11 th January 2013.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
A2 Agreement Trial ICT November Key Points from Moderation  Majority of centres applied the assessment criteria successfully  Tasks selected and.
Improving Compliance with ISAs Presenters: Al Johnson & Pat Hayle.
Every employer must ensure, as far as is reasonable practicable, the health, safety and welfare of all his employees More specifically, employers must.
GROUP CERTIFICATION: THE INTERNAL CONTROL SYSTEM Istituto per la Certificazione Etica ed Ambientale.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Developing a Local Authority Policy for Safety Audit Jo Horton - Road Safety Engineer Kent County Council
TOWARDS AN ACCREDITED BLENDED MASTER IN EUROPEAN SOCIAL SECURITY: FEASIBILITY STUDY MAPPING THE SIMILARITIES AND DIFFERENCES Draft findings gathered via.
Auditing & Investigations II
ISO/IEC
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
TERMS OF REFERENCE - FINANCE COMMITTEE
Quality Management Systems – Requirements
General Data Protection Regulation
Operationalizing Export Certification and Regionalization Programmes
LDZ Offtake Meter Orifice Plate Error
How to conduct Effective Stage-1 Audit
The Road to ISO Certification Quality Auditing Services Ltd Tel: +44 (0)
Joint Office UNC Elections
Joint Office UNC Elections
Joint Office UNC Elections
Aerodrome Certification Workshop
Presentation transcript:

NTS to LDZ Meters – Audits & Validations Created by Alison Chamberlain on behalf of Transporters, for meeting 6 th August, 2010, 31 Homer Road Solihull

2 Appointment of Auditors  External independent auditors appointed under normal procurement tendering processes employing primarily technical considerations with financial considerations considered to be of secondary importance.  Interested parties tendered against document GMR00022 this is a jointly developed and common DN document and Transmission’s Measurement Assurance Group and Ofgem have/had no objection to this approach and in fact wanted a common approach to be developed.  The auditors are UKAS accredited (and independently audited themselves). The United Kingdom Accreditation Service is the sole national accreditation body recognised by government to assess, against internationally agreed standards, organisations that provide certification, testing, inspection and calibration services. Accreditation by UKAS demonstrates the competence, impartiality and performance capability of these evaluators.

3 The Audit  Choice of sites – selection criteria applied and many factors are taken into account. (includes such considerations as complex risk factors applied to each relevant contributor for each meter, volume throughput, number of days since last audit, previous audit findings, metering technology type, balance across networks) – balanced against the normal validation cycle.  Presented to and agreed with Ofgem. As an example 10-12% of National Grid Distribution offtakes are chosen each year. (constraints – budget, site technician and central specialist technical support from Network Integrity required).  Practical considerations – co-ordinating dates for E&I, DCS (resource management) local site expertise, the audit company, pressure management, Network Integrity etc.

4 Audit Findings  National Grid Transmission get to view the output  Performance is viewed in relation to uncertainty and against the specific supplemental agreement.  Findings are categorised 1= most serious, 3= least serious & comments.  Report provided to Ofgem who seek an action plan and a liaison meeting is held (with Ofgem and the auditors present).  The action plan will, detail such actions as:  Work to be done on site  Competence  Research  Anything relevant  No action required and why.

5 Validations OAD Section D3  "validation" means validation that Measurement Equipment is reading within the Permitted Range and without systematic bias; and "validate" and "validated" shall be construed accordingly.  the "Validation Procedures" are the procedures established by the Parties for validation of Measurement Equipment, comprising (as applicable) the documents known as T/PR/ME/2 parts 1, 2 and 3 and T/PR/GQ/3.  The upstream Party shall be entitled, but shall not be obliged, at its own cost to attend and witness any validation carried out by the downstream Party in accordance with this paragraph 3.  NGT are exercising their right to witness validations and they issue a report detailing any findings. Issues are picked up and dealt with appropriately.  Every Offtake will be validated within a 12 month period and once started the validation should be completed within one month.

6 3.3 Exceptional Validation  The upstream Party shall be entitled to request that a validation of Measurement Equipment (or any component thereof) be carried out at any time, by notice to the downstream Party specifying the Offtake and the Measurement Equipment or component thereof to be validated and the upstream Party's reason/s for requesting such validation.

7 Ofgem  SGS has a contract with Ofgem to be the “Gas Examiners”.  A guidance document and capture spreadsheet which is used by the Gas Examiners to undertake pertinent metering checks during their normal Gas Examiner duties has been jointly developed in conjunction with Advantica (now GL) and SGS.  The completed spreadsheet is provided to the Network Technician at the time of visit. The spreadsheet contents are also uploaded to the SGS website by the Gas Examiner. The website automatically notifies the Responsible Engineer of any issues and a suitable response has to be made which is reviewed and accepted as appropriate by the lead SGS Gas Examiner.

8 Other parties  Distribution Control Centre/s - monitor real time critical alarms – all alerts are actioned for every site for every day. This can include a request to investigate system condition remotely and/or technician call out to resolve. (Information can also flow between National and area control).  Network Integrity/Equivalent dept - monitor detailed alarms and errors post Gas Day when data becomes available. This is a more detailed analysis. Each issue is investigated and documented. Anything requiring further investigation is dealt with.  Joint Office – now lodge all Significant/Meter Error Reports.

9 Information To facilitate continual improvements the responsible managers within each DN get copies of:-  The audit reports,  Transmission’s witnessing reports  The SGS ‘meter check’ spreadsheets data via the SGS website  Meter Error Reports (access via the Joint Office Website). NGT’s information (‘meter issues’ which includes a synopsis of the MERs).  NGTs validation acceptance report (spreadsheet)  Validation M.I. extracted from system (spreadsheet)