Cody JohnstonProject Manager Kathleen AndrewsAssistant Manager Logan HaynerGraphic Designer Peter Kennedy McMinnResearcher.

Slides:



Advertisements
Similar presentations
Use of Maps for Identifying Regulated Wetlands in Vermont Comments by Ralph Tiner U.S. Fish & Wildlife Service.
Advertisements

DPC High-resolution multi-disciplinary monitoring of active fault test-site areas in Italy S5S5S5S5 Roma 24/03/ 2010 S5 Project High-resolution.
Graduate Application Project Design Concept Walkthrough
Proposal to Create and Implement a Geodatabase for Freeman Center, Texas State University San Marcos, TX.
Critical Book Review Due Dates March 3 rd -1 pg summary due (what you have read to this date, not the whole book)- 25pts March 10 th –Project proposal.
SHELTER IN PLACE DRILL TRAINING Preparation for April 2008 Drill.
Progress Report : Design and Creation of a Geodatabase on the Colorado River Refuge Owned by Pines and Prairies Land Trust Arma-Geo Products Geography.
Non-Class Events in Classroom Project 1 Classroom Scheduling & Utilization Project: Capturing Non-Class Events in Held in Classrooms March 25, 2009.
ODOS The Office of the Dean of Students. Projects Interactive Campus Map Global Positioning System - Device for the Visually Impaired Adjustable Table.
Project Name Steering Committee Meeting Project Manager: Project Manager Name Program Manager: Program Manager Name Project Sponsor: Project Sponsor Name.
Location Analysis for Outdoor Recycling Bin Placement Prepared for:
L. Guilliams, C. Pennington, G. Shreve Sidewalk Inventory City of Seguin, Texas Wellness and Lifetime Knowledge WALK.
Craig McCabe Jeff Archer
Allison Brewer Mary Biggs
Rachel Cavin, Manager James Dodds, Assistant Manager Taylor Dorn, GIS Analyst Kyler McNew, GIS Analyst Cartographic Modeling of Sidewalk Location Selection.
Cody JohnstonProject Manager Kathleen AndrewsAssistant Manager Logan HaynerGraphic Designer Peter Kennedy McMinnResearcher.
Proposal for Geodatabase on 5 Mile Dam Soccer Complex Daniel Cohen – Project Manager Samuel Boesch – Assistant Manager Mathew Riggan – GIS Consultant.
Wimberley Market Days Progress Report Site Addressing and Management Analysis.
FINAL NETWORK ANALYSIS OF ADA ACCESSIBLE ROUTES ON THE TEXAS STATE UNIVERSITY CAMPUS Cody JohnstonProject Manager Kathleen AndrewsAssistant Manager Logan.
New Hanover County 2017 Revaluation Update Roger Kelley Tax Administrator Tax Administration September 14, 2015.
3rd WG meeting, Brussels Proposed Plan for Governance of the Washington Group Prepared by: Jennifer Madans, Barbara Altman, Beth Rasch (USA); Renée Langlois.
1 Local Readiness Team Lead Kick-Off Meeting May 16, 2007.
Sunflower Project Data Conversion Workshop May 5, 2009.
T.E.E.G.S Transportation, Emergency, and Environmental GIS Services Matt Smith Project Manager Lauren Bender GIS Analyst Amanda Magera GIS Analyst Aaron.
Evacuation Safety Planners * Progress Report. Introduction: Objectives for this project were arrived upon through correspondence with the City of San.
ECE791 Senior Design Experience Project Requirements and Timeline.
Core Strategy Dublin City Development Plan
E-Education Institute Lidar Technology and Applications Proposal for an elective course to be offered by the Dutton e-Education Institute MGIS Capstone.
Panel P1J: Navigation Data October 2002 CCSDS P1J Status Report Fall Meeting, Houston, Texas Dates: Oct 1-4, 2002 Felipe Flores-Amaya NASA/GSFC/Code 453/Code.
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Assessment of Hill Country Land Use: Records at the County Level Loma Environmental Strategies.
Collection GPS Deployment NTEU Briefing October 14, 2009.
Spatial Analysis of Digital Traces on a University Campus Kal Watts ( )
A Demographic Profile of Texas Counties in the Hill Country Alliance Prepared by: Texan Demographics Consulting Group.
Campus Storm Water Proposal A Storm Water Solutions Project.
Iowa Department of Education Statewide Data Conference August 10, 2015 Infinite Campus Updates for SRI
2012 Statewide Ortho Imagery Project. Partners USGS NGA DOT DESPP.
ONBASE: HOW TO UPLOAD DOCUMENTATION EFFICIENTLY April 2, 2015.
2012 TELPAS Online Testing & Data Collection. Disclaimer  These slides have been prepared by the Student Assessment Division of the Texas Education Agency.
DeWitt County Emergency Response Handbook 1 of 9 Project Manager: Robert Gannon Assistant Project Manager: Matt Ahrens GIS Analyst: George Caracostis.
Seite 1 WP1 Organisation and Management Management Group Meeting, Halle 18 March 2014.
Introduction to Web Authoring Bill Hart-Davidson AIM: billhd30 Session 21
On Campus Internship Work Plan Creation
Human Resources BPI Updates
Progress Report Project Manager-Clancy Taylor
Teacher Student Data Link (TSDL) November 2017
Sales Process March 2017.
Payroll Processing pay period end for HR Professionals
BSc Computing Dissertation
Key Dates-Odd Days April 26th-Lottery April 28th-Draft & Work Day
TGaf Waikoloa Closing Report
St. John the Baptist School System Special Education Chairperson’s Meeting September 8, 2016.
July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [ July.
IEEE TGaf Waikoloa Closing Report
TGaf Indian Wells Closing Report
Up-dating of the EUPAN Handbook
TGaf San Antonio Closing Report
BSc Computing Dissertation
TGaf Waikoloa Closing Report
<month year> DCN k January 2011
Review plan of the nature reporting – update 6
Building a Strategic Plan
Green Infrastructure: Working method
TGaf Nanjing Closing Report
Welcome to the February Meeting
TGaf San Antonio Closing Report
May 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15 May.
Three Bridges Estates HOA Meeting
July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [ July.
Presentation transcript:

Cody JohnstonProject Manager Kathleen AndrewsAssistant Manager Logan HaynerGraphic Designer Peter Kennedy McMinnResearcher

GeoTex is currently finalizing the process of determining ADA approved slopes for ramp and non-ramp areas across Texas State’s campus. GeoTex has remained on schedule, and will begin the routing process next week.

All essential buildings on Texas State’s campus will have ADA approved routes leading to them GeoTex strives to create easy-to-read maps to assist all persons with disabilities in navigating the campus

TASK 1: Determine/map accessible non-ramp areas TASK 2: Gather ramp data, determine, and add accessible ramp areas to non-ramp map. TASK 3: Routing process

Blanco hall to the JC Kellam building

Task 1: Route map slope data Acquired all necessary data Created map of existing routes Converted LiDAR data and created high resolution slope map Task 2: GPS data collection Acquired GPS device from Department of Geography Task 3: Verify analysis and design final map Scheduled tasks to be completed

Red = Steep slope Green = Flat areas Blue = Existing routes Lavender = Buildings

Task 1: Route map slope data Designing final deliverable slope map. Task 2: GPS data collection Collecting point data of all curb-cut and wheelchair ramp locations. Collecting building interior accessibility data (automatic doors, elevators, ramps, etc.) Task 3: Design final deliverable route map and verify analysis Work has been scheduled.

Task 2: GPS data collection Import GPS data into ArcMap and determine slope between each curb-cut and wheelchair ramp point collected in the field. Task 3: Design final route map and verify analysis Develop routes that comply with ADA standards. Design final deliverable route map. Upload all deliverables to project website.

 Unable to obtain a GPS device with a high enough resolution and level of accuracy to obtain precise measurements of shallow slope areas in the field.  Original DEM data had a resolution of 10 meters. This resolution is too low for any meaningful slope analysis on campus. ◦ Resolved: The group acquired and formatted LiDAR data which now has a resolution of 6 inches.

Task:March 24 th -30 th March 31 st - April 6 th April 7 th -13 th April 14 th -20 th April 21 st -27 th April 28 th - May 4 th Progress Update March 26 th Identification of Accessibility Gaps Finish by: April 2 nd Formulation of Final Routes Finish by: April 7 th Creation of Final Maps/Deliverables Begin by: April 7 th Finish by: April 23 rd Final Presentation Preparation Begin by: April 13 th Finish by: April 27 th Final Presentation May 2 nd  The following timeline is updated from the original proposal to provide a more accurate picture of what still needs to be accomplished and the target dates for completion.

GeoTex will create a map of all handicap accessible routes around central campus. All routes will comply with the current Americans with Disabilities Act guidelines. Map will be made available online.