Learning with Purpose CAP Steering Committee Energy Project ID Two Important Initiatives 4/28/2014.

Slides:



Advertisements
Similar presentations
Bond Construction Update Citizens Oversight Committee Long Beach Community College District July 21, 2008 BUILDING TOMORROW TODAY 1.
Advertisements

Re-commission 5 Buildings Goal 2012 Lighting Upgrades VFDs Historic Weather Extremes Boiler Efficiency Free Cooling AHU Schedules.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
Building Energy Efficiency By Doug Horn. Agenda Introduction Why Focus on Buildings? ecoEnergy Retrofit Homes Program Energy Efficiency Measures Renewable.
ENERGY PERFORMANCE CONTRACTING PROGRAM For Equipment, Design, &Installation of “Energy and Water Upgrades” at University of Massachusetts Lowell Lowell,
NJ SmartStart Buildings New Jersey Higher Education Partnership for Sustainability (HEPS) January 20, 2012 Presenter: BPU President Robert Hanna.
THE COLLEGE AT BROCKPORT Facilities and Planning Capital Update College Senate November 26, 2007.
UTPA Energy Conservation Initiatives Oscar Villarreal Director, Facilities Management David Ortega Assistant Director, Energy Manager.
Water Auditing 1 Cari DeWolf, Consultant. Mindsets… Budgets… Oversight… 2 Photo by Cari DeWolf, El Dorado Irrigation District.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Peter Duby, Pepperdine University Gabriel Ayala, Enovative Group Inc.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
ENERGY CONSERVATION & MODERNIZATION FOR GLENDALE COMMUNITY COLLEGE
Building Commissioning
The Office of Sustainability UM Facilities Services 32 Campus Dr MS 9288 Missoula MT, University of Montana Climate Action Plan Planning to reduce.
City of Dallas 2030 District Initiative April 24, 2015.
Energy Management Through Measurement: Advanced Metering Stephen Durfee, LEED AP O+M, CEM Campus Energy Manager Bucknell University Lewisburg, PA
Sustainability and the University of Hawaii Integrating Research, Education and the Realities of Campus Operations Stephen Meder University of Hawaii Center.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
Eastern Illinois University Energy Conservation and Sustainability Program December 11, 2007 Lt. Governor Pat Quinn Sustainable Government Symposium IDNR,
2 Approved by the Board of Regents in 2006 to support rising energy prices due to double digit increases in utility rates and in lieu of an increase in.
GETTING HELP FOR LARGE ENERGY EFFICIENCY IMPROVEMENTS AT A SMALL COLLEGE Anne Duncan, Environmental Sustainability Coordinator Terry Rowe, Sales Team Leader.
CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) November 2013.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
You can achieve 100% Energy Saving WHEN YOU TURN OFF THE LIGHTS.
Woodland District 50: Operations and Facilities Report Energy Update 2012 Summer Work Five-Year Facility Plan Service Maintenance Agreement Night Time.
1 Progress Toward Sustainability at Williams College.
STAFFORD COUNTY PUBLIC SCHOOLS ENERGY MANAGEMENT PROGRAM 2009 UPDATE Bob Randall CEM,,BEP, CBCP Energy Manager Energy Manager.
UAF research leads to inventions Invention Disclosures by Year.
Preserving Assisted Properties: Energy Retrofits Preserving Assisted Properties: Energy Retrofits December 3 and 4, 2012.
Saavedra Gehlhausen Architects Title: text size 36 pt. Text size 28 pt. Karl J. Jacobs Center for Science and Math.
Big Ten Sustainability Conference November 14-15, 2010 Funding Strategies: Energy Savings Projects and Seed Grants Funding Strategies.
TowerWise.ca Energy savings in Multi-suite residential buildings: Case Studies.
ENERGY ASSESSMENTS, RETRO-COMMISSIONING AND TECHNICAL SUPPORT Eileen Westervelt | PE | CEM SEDAC, Program Director, Retro-Commissioning.
Developing a Comprehensive Energy Plan for Your Facility.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Facilities Maintenance Status Report John Ozurovich, Director Facilities – Saddleback College John Edwards, Director Facilities – Irvine Valley College.
Paradise Valley Community College CLC Update Jacalyn A Askin, Vice President of Administrative Services May 8, 2009.
Name of Building(s) or Project Speaker(s) Organization(s)
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Energy Conservation Initiatives Joan Kowal Energy Manager, UMCP May 1, 2008.
Energy and the Environment The Role of CERT at NC A&T Dr. H. Singh, Professor and Director Robert Powell, Asst. Professor and Asst. Director Center for.
Leading by Example Philip Gates, CEM, CMVP, EIT Energy Manager 1.
Spring 2011 Convocation. Education Building Construction $19,013,000 Health and Safety Railings $470,000 A/C Upgrades – BE, LA, M&S $6,600,000 Theatre.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Nicholas J. Hennessy, Ph.D Sustainability Coordinator Bowling Green State University Energy Conservation Measures: It Takes a Community.
How Facilities Can Help Commitment by facilities director Facilities energy committee Energy officer position Include conservation commitment in: Strategic.
Successful Bond Programs (Community Engagement) Cathy Allen, Chief Operations Officer Facilities Support Services September 22,
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
Kendal at Oberlin Energy Conservation & Sustainability Initiatives.
01/15/16Prop 39 Update - Maintenance & Operations - Sustainability Initiatives Unit1 CALIFORNIA CLEAN ENERGY JOBS ACT LAUSD PROPOSITION 39 ENERGY EFFICIENCY.
Overview for Local Energy Committees February 10, 2016.
Campus Energy Use Intelligent Infrastructure for Energy Efficiency May 25, 2007 Peter Cooper Dept of Facilities, Manager of Sustainable Engineering and.
1 Potomac Electric Power Company Case 9155 & Delmarva Power & Light Case 9156 EmPOWER MARYLAND DRAFT NON-RESIDENTIAL ENERGY EFFICIENCY AND.
Sustainability Summit – April 12, 2016 Beau Engman 825 North Jefferson, Suite 300 Milwaukee, WI 53202
Energy Conservation Building Upgrades Alma School District.
District of Columbia Housing Authority Office of Capital Programs and Development Construction Services Administration, LLC Going Green: Intelligent Investments.
MSAD # 52 Energy Savings Performance Contract May 4, 2016 Upgrading our School Facilities and Reducing Energy and Maintenance Costs Utilizing Performance.
Town of Woodbridge Beecher Road School Infrastructure & Energy Upgrade Presentation to Board of Education December 17 th, 2012 AKF John B. Rice, PE, LEED.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
DRAFT Status Report: Five-Year Energy Plan Town of Athol January 2013.
Albert Sherman Center Achieving Predicted Energy Use March 15 th, 2016 Presented By: Fran Boucher, CEM – National Grid Suzanne Wood – UMass Medical School.
Cuba-Rushford CSD Capital Project
EDENTON-CHOWAN SCHOOLS
Deferred Maintenance Deferred Maintenance
UMCP Learning Objectives
The New York Power Authority
Director of Water Engineering
EDENTON-CHOWAN SCHOOLS
Presentation transcript:

Learning with Purpose CAP Steering Committee Energy Project ID Two Important Initiatives 4/28/2014

Learning with Purpose AEP Internal Energy Projects Sustainability Website Energy Project ID Most Important Initiatives

Learning with Purpose  Finances $26M for 130 energy conservation projects paid for by energy cost avoidance  Reduces campus energy approximately 24%  DCAMM program and oversight  Simple payback of less than 14 years  DCAMM Deferred Capital Maintenance Funds Contribution of $5M  Reduces Deferred Maintenance by $10M to $12M  Improves academic learning environment  Construction Management throughout  Commissioning with third party review  Audit & Facility Condition Assessment completed Mar 2013  Schematic Design package completed December 2013  Procurement of CM-Design-Build scheduled April 2014  Design-Build Contractor on site Summer Early 2016 AEP Highlights

Learning with Purpose Accelerated Energy Program (AEP) UMass Lowell 8/15/13

Learning with Purpose ETIC Improve Flr 1-2 Lab Efficiency Study ETIC Energy Efficiency– Cleanroom Study ETIC Study RODI water re-use Survey & Repair Steam Traps – Phase 4 Weed Retro-commissioning Study Campus Water Meters – sewer abatement O’Leary variable flow and use of chiller as heat pump to heat heating hot water. Enernoc Demand Response to reduce grid power loads Enernoc UC & Riverview Costello Upgrade Campus Door Weatherstripping LED Parking Lot Lighting - South Univ. Suites Wireless Controls Pilot Project Wannalancit Simplify Nat Gas metering – reduce cost of gas LED Lighting Replacement Classroom 325, 327, 329 North Fields Lighting Control ICC Energy Control Upgrades LEED Magauvran & Dining Conversion LEED Management Building Bourgeois-Leitch Upgrade LEED ETIC new Labs 3 & 4 LEED Univ. Crossing Internal Energy Projects – FY 14