SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.

Slides:



Advertisements
Similar presentations
Solving Challenges Others Cannot Statutory Frameworks for Public Private Partnerships HMFA Lone Star Chapter 2009 Winter Institute Dallas, TX Christopher.
Advertisements

Construction Engineering 221
Roles & Responsibilities in Construction Management
Delivering Successful Facility Projects It Starts and Ends with You!
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Marcy Mealy Procurement Specialist CDBG Program
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE November 12, 2008.
Unit 4: Utilizing Financial Documents
MANAGING PRODUCTION SYSTEMS. Managing Production Systems –A project should be worked  Within schedule  Within budget  And safely –Management has to.
Construction process Types of contracts Halmstad University Construction management Piotr Mazur Paulina Wawryca Paweł Bilski.
ESTIMATING By Laith Jacob.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
Review of Plans & Estimating Introduction Architect’s Responsibilities Types of Estimates Factors Affecting Cost Film Project:
Construction Engineering 221 Drawings and Specifications.
Chapter 1 Professional, Architectural Careers, Office Practice, and Opportunities.
Expectations What your Construction Professional, Architect, Construction Manager/Contractor expects from you? What you can expect from your Construction.
1 Construction Planning and Management: Tanya Vartivarian Director of School Services IFF June 2010.
Planning & Delivery Systems Construction Engineering 380 Engineering Law.
Energy Saving Improvement Programs aka: ESIP; ESCO; P.L. 2009, c. 4 Gordon Ball, Senior Procurement Specialist Division of Local Government Services Introducing…
Construction Contract Documents
Chapter 4 The Construction Process. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Author name here for Edited books chapter 6 Facility Construction 6 chapter.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
 Journeyman  Management  Specialization  Teaching  Owning a business.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
Construction Contracts and Project Delivery Methods
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
Specification & Quantities Estimating
Chapter 43 Construction Supervision Procedures. 2 Links for Chapter 43 Contracts Completion Notices Bids Inspections Loans Appraisals Change Orders Building.
Chapter 2 Introduction to Construction Procedures
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Solving Challenges Others Cannot Statutory Frameworks for Public Private Partnerships NCPPP/AGC Conference Phoenix, AZ Christopher D. Lloyd January 27,
Agency Construction Management :CM NOT AT-RISK
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Entrepreneurship Business Plan Utilizing Financial Documents.
Process of Planning, Designing and Financing a Hospital
Chapter 5 Owning a Home The Right Place The Right Price Buying Process and Terms Feeling at Home.
You passed the Bond or secured some funds What do we do now? 2014.
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
© 2011 Orbach Huff & Suarez 1 Lease Leaseback Project Delivery Method Kimble Cook Orbach, Huff & Suarez.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering HW #6 review Test-2 & Review Prof. Ralph V. Locurcio, PE.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
Chapter 7 Funding & The Bid Process. Funding Source of funding that supports and allows a project to become a reality versus just an idea.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
Chapter 8 Construction. Groundbreaking Before the construction begins, a ceremony is often held to recognize the official start of the project. This step,
FIDIC Tendering Procedures
Construction Planning
BOT LAW (R.A. No. 6957, as amended by R.A. No. 7718)
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE
Award Management Services
CONTRACT DOCUMENTS & CONSTRUCTION
Financing Land Development Projects
Project Development and Managing your Build Agenda
The Cost Approach.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Architecture during Construction ‘observation administration’
MULTISPORTS CENTRE PRESENTATION
Construction Management Services April 16, 2018
Presentation transcript:

SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing Recreation Facilities” Small Group Work Summary/Assignments

Chapter 7 Funding & The Bid Process Funding is a critical part of the design project Generate support & interest Project Costs 1. Hard Costs “Fixed”, part of the facility, permanent & relate to construction. (material cost + labor) Cost per square foot common. GSF and ASF. What are they? What is tear space?? Construction Mgmt: Have expertise to guide construction to ensure it goes according to plan, safely “FFE” Furniture, fixtures, and equipment 2. Soft Costs; “Start-up costs” Contingencies (unexpected costs % of construction cost) Architect fees, engineering, consultants, permits, permits, permits!!

Chapter 7 Operational costs need to be considered in the design stage; i.e. sustainability “Plan well, save later” CONSTRUCTION OPTIONS (Be aware of funding and time frame to completion) 1. Conventional; Most common; design is put out to bid, lowest, most qualified is awarded the contract. Common in the public sector. 2. Design-Build; One company does both the design and construction. Cost savings, mostly used by the private sector. 3. Fast-Track; Construction begins before design is complete. Potential savings. 4. Turnkey; Contractor does it all, design through construction

Chapter 7 BIDDING THE PROJECT Private sector organizations need not go through the bid process, but may do since bidding causes competition Public sector organizations are required by law to bid projects. Ensures a fair & equal process Lump sum = General contractor provides quote. Includes all work. Separate bid pricing = several contractors bid on different phases; i.e. structural, electrical, HVAC Alternates; Bid separately from initial bid. Can be added if funds available Bonds; Percentage of project cost, all bidders provide. Returned to selected bidder once work complete

Chapter 7 Bid process example: Public announcement ↓ Bid submission deadline ↓ Formal bid opening ↓ Review of bids ↓ Award

Chapter 7 Contract Arrangements “You need more than a handshake!” 1. Value Engineering; Comparison of specifications & costs. Negotiate to solve problems 2. Insurance; Worker’s compensation, property, casualty loss 3. Financing; Pay for the work/materials 4. Cost control; Incentives 5. Signing; Once signed, price locked in

Chapter 7 Complete FUNDING OPTIONS (Usually a combination) 1. Mandatory Fees; i.e. Memberships 2. Tax Levy; Public sector. Taxes. 3. User fees; Charge for service 4. Bond Issue; Public sector. Tax exempt bonds (principle + interest) sold to general public 5. Revenue Bond; Public sector. Revenue raised repays the loan. 6. Donations/Contributions 7. In-Kind Donations; Labor/materials donated 8. Grants; Public sector. 9. Sponsorships; EXAMPLES????

Chapter 8 “Constructing Recreation Facilities” Green Stadium Celebration time!! Break that ground, build that facility. “Turn paper into brick” CONSTRUCTION DOCUMENTS Architect completes adjustments. Critical to have in good order. 1. Final Blueprints; Details the project. Contractors must follow to ensure safety & to avoid mistakes. 2. SpecBook: More detail. Codes, standards. 3. Shop drawings: Interpret blueprints & spec book. Focus on specialized designs 4. Change Orders: Problems should be expected. Written design order to make approved change. 5. Project Schedule: All aspects listed, estimated completion. 6.

Chapter 8 CONSTRUCTION MANAGEMENT Oversee entire project. Expertise & experience Formal written agreement w/owner Progress Meetings Coordination: Avoid conflicts, keep it on schedule Project Schedule QUALITY CONTROL; Inspect work of all contractors. Ensure design becomes reality Legal Requirements; Ensure codes are followed Inspections; Will arrange. Outside agencies, examine electrical, structural, plumbing Changes; CM, architect review, owner for approval Site safety/security: Critical. EXAMPLES???? Visits: Hard hats, sign-in, supervise sports/ sports/

Chapter 8 Complete FINAL STAGES “Before the doors open” Training; Technical equipment, HVAC, security, av Maintenance Manuals; “A dull read, but necessary” Finishing Stage; Painting, lights, floor coverings, furniture, equipment “Keymaster”; New & old. EXAMPLES???? Signage; Safety, direction Punch List; List at the end of project detailing what needs to be completed. “Walk about” Furniture/Equipment; Very detailed. Owner pays portion. Acceptance/Occupancy; Move in prior to completed punch list acceptable. “Certificate of Occupancy” “RIBBON CUTTING”