September 4, 2012 Michael Moore Program Executive Astrophysics Division Science Mission Directorate Princeton Astrophysics Community Meeting.

Slides:



Advertisements
Similar presentations
Office of Technical Services Tracking & Reviewing Research Space Usage Tony Woods Deputy Director, OTS.
Advertisements

West Contra Costa USD Potential 2005 Measure J Bonding Capacity Waiver Presentation to the Facilities Subcommittee December 10, 2013.
LISA in the light of eLISA, April 2013PhysPAG APS, Denver LISA in the light of eLISA Neil Cornish for GWSAG APS Meeting Denver
Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
1 Astronomy and Astrophysics Advisory Committee Astrophysics Division FY2008 Budget February 8, 2007 Rick Howard Astrophysics Division Director (acting)
Ad hoc Biomedical Committee Report NIH/NASA MOU Exploration Technology Development Program (ETDP) Milestones 2009 Human Research Program Status For Section.
EARTH SCIENCE INITIATIVE to respond to the NRC Decadal Survey, Earth Science and Applications from Space: National Imperatives for the Next Decade and.
1 Briefing to the CAA on the Terrestrial Planet Finder (TPF): Finding and Characterizing Earth-like Planets Zlatan Tsvetanov, NASA Program Scientist Charles.
NASA Living with a Star Program Targeted Research & Technology Steering Committee NASA HQ & LWS TR&T Update September 16, 2008 Doug Rowland On Detail to.
Strategic Planning Framework Programs & Projects ArchitectureRoadmaps Agency Goals & Objectives National Policy and Direction.
1 NASA Agency Overview NASA’s Vision and Fundamental Physics in Space Paul Hertz Chief Scientist, Science Mission Directorate NASA International Workshop.
Fundamental Physics and the Decadal Survey Quantum to Cosmos 3 Airlie, VA 7 July 2008 Michael Salamon NASA HQ/Astrophysics Div.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
Providing Access for US Astronomers to the Next Generation of Large Ground Based OIR Telescopes 1.Scientific Potential 2.Current Design Efforts 3.Complementarity.
Introduction of Space Technology. The James Webb Space Telescope The James Webb Space Telescope was previously known as the Next Generation Space Telescope.
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
MRC VIEWABLE IMPRESSION RECONCILIATION PROCESS: PHASE 3 RESULTS AND MOVING FORWARD Presented to IAB 3MS Educational Forum July 8, 2015.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
Mars Program Update James L. Green Acting Director, Mars Exploration Program NASA Headquarters May 13, 2014 NOTE ADDED BY JPL WEBMASTER: This content has.
Strategic Objectives 2011 January 14, Growth of Aligned Programs ObjectiveAccountabilityProcessOutput/ Outcome Status Report Enhance and expand.
Workshop Purpose Paul Hertz April 25, The Importance of Astronomy Science Centers NASA Astronomy Science Centers provide functions for the community:
JWST Integrated Modeling Environment James Webb Space Telescope.
1 Astronomy & Physics Division ASTRONOMY & PHYSICS DIVISION STATUS & PLANNING PHILIPPE CRANE Origins Theme Scientist Baltimore, Md. February 26, 2004.
MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September JWST Status.
Program Status Physics of the Cosmos Program (PCOS) Cosmic Origins Program (COR) M. Ahmed Briefing to the PhysPAG January 8, 2012 AAS Meeting, Austin Texas.
1 LSST dark energy science collaboration meeting Penn June 11-13, 2012 LSST dark energy science collaboration meeting Penn June 2012 Governance Document.
AAAC Meeting February, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort at a.
Optimized IT Gae Lyn DeLand, IT Director In. March 15, 2007 IT Governance General Description: “This Bill consolidates information technology services.
Activities of and Prospective Issues before the Committee on Astronomy and Astrophysics Report by David Spergel, CAA Co-Chair Disclaimer: These slides.
A Roadmap forNationalOIRFacilities AAAC May 2005 OIR Long Range Planning Committee Document for submission to NSF AST and CAA May 2005.
Cutting the space shuttle budget: an end to an era Chelsea Pence.
Harvey Tananbaum Director Chandra X-ray Center Harvard-Smithsonian Center for Astrophysics 13th HEAD Meeting April 8, 2013 Building International Space.
Spitzer Space Telescope Lisa Storrie-Lombardi Spitzer Science Center, Manager & Asst. Director for Community Affairs Implementing Portals of the Universe:
Sharing Research Data Globally Alan Blatecky National Science Foundation Board on Research Data and Information.
Potentially Hazardous Asteroids: Characterization, Atmospheric Entry and Risk Assessment 9 July 2015 Ames Research Center Moffett Field, California IAWN.
NASA Earth Science Technology Update Presented to Doppler Wind Lidar Working Group April 28, 2015 George J. Komar Associate Director/Program Manager Earth.
American Community Survey ACS Content Review Webinar State Data Centers and Census Information Centers James Treat, ACSO Division Chief December 4, 2013.
Modern Universe Space Telescope Visions 2003 Proposal Dennis Ebbets Ball Aerospace UV Optical Space Telescope Workshop STScI February 26, 2004.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
SOFIA 2 nd Generation Instrument Plans & Technology Development Paul Hertz SOFIA Program Scientist & SMD Chief Scientist SOFIA Science Steering Committee.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
Physics of the Cosmos Program Analysis Group John Nousek Penn State University International Workshop on Astronomical X–Ray Optics Prague, Czech Republic.
6/6/08NASA/USRA Management review- SETI TLR - 1 A New SOFIA Science Vision Charter, Progress, and Plans Tom Roellig.
Telescopes Key Words Optical Telescopes: make use of electromagnetic radiation in the range of visible light Refraction Telescopes: use lenses Reflecting.
1 Rita Sambruna Lia LaPiana NASA HQ NASA HQ The Science Definition Team for the astrophysics-focused use(s) of the Telescope Assets.
NASA Update NDIA PMSC Quarterly Meeting February 4, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis Team)
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
ANN HORNSCHEMEIER Chief Scientist, Physics of the Cosmos Program NASA Goddard Space Flight Center.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
1 Douglas Hudgins Exoplanet Exploration Program Scientist Presentation to ExoPAG#8, Denver Colorado October 5, 2013.
NRO Telescopes David Spergel. History meter telescopes meter mirror “Residual space hardware” from Future Imagery Architecture, failed program.
LISA News from ESA O. Jennrich LISA Project Scientist.
Future of Astronomy Astronomy 315 Professor Lee Carkner Lecture 25.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
Approved For Public Release © The Aerospace Corporation 2009 June 17, 2009 Initial Summary of Human Rated Delta IV Heavy Study Briefing to the Review of.
Senior Review of NSF Facilities NOAO Users Committee October 4, 2005.
Dr. Jon Morse Astrophysics Division Director Science Mission Directorate NASA Headquarters February 11, 2008 Astronomy and Astrophysics Advisory Committee.
PCOS/PhysPAG Town Hall AAS-HEAD, Monterey Richard Griffiths PCOS Program Scientist April 9, 2013 NASA HQ Perspective.
Strategic Planning Deanna Herwald Vice President-Quality Management Systems.
NASA Opportunities through the Physics of the Cosmos Program John Nousek Penn State University International Workshop on Astronomical X–Ray Optics Prague,
GSMT SWG Meeting November, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort.
G O D D A R D S P A C E F L I G H T C E N T E R 1 Status of LISA Jordan Camp LISA Deputy Project Scientist NASA / Goddard Space Flight Center Jan. 19,
Preparing for the Future: NASA's Planning for the Decadal Survey
Bureau of International Cooperation Chinese Academy of Sciences (CAS)
02/04/17 1.
Upcoming Facilities of IIA
Systems Engineering Management
Systems Engineering for Mission-Driven Modeling
Visions and Voyages: The Planetary Decadal Survey
Presentation transcript:

September 4, 2012 Michael Moore Program Executive Astrophysics Division Science Mission Directorate Princeton Astrophysics Community Meeting

2 Timeline January: Identification of hardware availability by the NRO 20 January: Initial establishment of task to study use of the system Summer study presentations to senior staff 19 August: 3-party MOU signed 29 August: DD1149 signed 30 August: NASA SMD (Morse/Moore) visit to ITT/Exelis Rochester for informal “handoff” 11 November: Property assigned to JPL subcontract November: Desensitization of hardware initiated February: Desensitization Security Review 1 March: Desensitization complete 1 March: Units 1 & 2 mirror coatings inspection report complete 11 May: Preliminary technical data was provided to prospective NASA science users 4 June : Hertz “New Developments in Astrophysics” presentation to the Committee on Astronomy and Astrophysics; A. Dressler presents on “Implications of New Developments for the Decadal Survey” 12 June: At the Anchorage AAS, Grunsfeld challenged American astronomers to consider exciting applications for this hardware 17 July: CAA Chair D. Spergel announced a community workshop at Princeton scheduled for September 4-6 on the scientific uses of the telescopes (not a NASA activity!) 27 July: NASA Advisory Council elects to forward a recommendation to the NASA Administrator that a study be conducted on potential uses of the telescope assets 30 July: Moore “2.4m Telescopes” presentation to the NAC subcommittee on Astrophysics 13 August, the NASA SIP meeting gives guidance to the Agency

3 Administrator Guidance from SIP Meeting

4 What Is the Hardware Being Considered? Structural Support Elements And lots of little elements and the design and test data. Fore Optics Assembly 2 (and an extra Primary) Outer Barrel Assembly 2

5 What Fraction of a Mission is This Hardware? A typical Astrophysics imaging telescope system has 5 parts of roughly equal cost: 1.Telescope – usually the Primary and secondary mirror with the metering truss and focal plane structure (where the instruments live). This is what we have for “free”; cost avoidance of approx. $250M 2.Spacecraft – includes the pointing and control, data systems, thermal control, communications and other utility elements. 3.Instruments – These can be one or more, depending on the design and teaming, but on HST they have run about $200M each. 4.Launch vehicle – This can be pretty hard to guess but a small EELV should be assumed 5.Operations - Ground control, science center and scientific research funding.

6 Current Status  The hardware, support equipment, documentation and records are in Rochester at the ITT-Exelis facility. While the elements have been declassified, there are still issues relating to ITAR and other sensitivities that limit our ability to share detailed information widely. Test and analyses information essential to the most efficient use of these assets will remain classified and require access capability for any eventual Project.  Following their July meeting, the NASA Advisory Council will be recommending NASA study the use of the telescope assets including how they could be utilized by any of the four SMD science disciplines.

7 Early Study Activity Indications  A preliminary NASA multi-center study was accomplished within the confines of the security classification to ensure the assets had substantial value to future science. This effort focused on the science identified in the Astrophysics Decadal Survey and provided a necessary “sanity check” about the performance and potential costs related to one design solution.  A quick, cursory examination by external scientists was accomplished using a very limited set of optical performance data to identify some potential science capacities. Their impressions were reported to the NRC Committee on Astronomy & Astrophysics.

8 NRC Astrophysics Decadal Survey Recommendations for Space Missions NameTarget Launch Year Wide Field Infrared Space Telescope (WFIRST) 2020 Design Reference Mission completed; candidate for mission after JWST Explorer Program AugmentationOngoing Currently included within Astrophysics PPBE14 in-guide budget request. Laser Interferometry Space Antenna (LISA) ~2025 Mission non-selected by ESA. Must consider alternative mission to achieve science. International X-ray Observatory (IXO) (late-)2020s Mission non-selected by ESA. Must consider alternative mission to achieve science. New Worlds Technology Development Program For a mission in the 2020s Funding for technology development included within Astrophysics PPBE14 in-guide budget request. Inflation Probe Technology Development Program For a mission in the 2020s Funding for technology development included within Astrophysics PPBE14 in-guide budget request. US instrument for int’l Space Infrared telescope for Cosmology and Astrophysics (SPICA) 2018 in Survey; likely 2020s No funding included within Astrophysics PPBE14 in-guide budget request; possibility for mission of opportunity selection through future AO. Definition of 4-m Hubble replacement Late-2020’s+ Funding for technology development included within Astrophysics PPBE14 in-guide budget request. 1 Medium Small RED = Where Astrophysics sees Potential Applicability for the Telescope Assets

9 Notional Schedule & Milestones Wide ranging Study

10 Closing Thoughts Initial looks at a typical development project with a couple of “generic” instruments seems to run near $1.75B. At this cost level, we are sure not to get a start till the JWST costs begin to roll off in 2017 (if then). That assumes that Astrophysics gets the use of those funds if they become available. Since the telescope assets come to us as-is and free, it seems inappropriate to use first quality new hardware to develop a science driven system that costs as much as a new (if somewhat smaller) mission capability. Another intellectual approach might be to see what can be done with heritage hardware and spares from other missions and focus on what can be done for science at the lowest price. Maybe even with some reduced reliability. If the community can’t innovate through this period, the opportunity to have another mission of any scale before the mid 2020’s will be very limited, with all the negative impacts we can easily predict.

11 Back-up

12 Using the ICM? “Frankenscope” Kodos to R. Capps Launch on a Falcon 9H GEO positioning for low cost comms University Operations

13 There are Leftover Spacecraft Around! NRL’s Interim Control Module (ICM) was Modified for the ISS and is still in storage