Workshop Purpose Paul Hertz April 25, 2012. 2 The Importance of Astronomy Science Centers NASA Astronomy Science Centers provide functions for the community:

Slides:



Advertisements
Similar presentations
GIS Executive Council and Advisory Committee Update November 2010.
Advertisements

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION 1 NASA Earth Science Data Systems (ESDS) Software Reuse Working Group CEOS WIGSS-22 Annapolis, MD September.
UCSC History. UCSC: A brief history 60s University Placement Committee A lot of field trips/interaction with employers.
Integrated Ocean Observing System (IOOS) Data Management and Communication (DMAC) Standards Process Julie Bosch NOAA National Coastal Data Development.
STEM Education Reorganization April 3, STEM Reorganization: Background  The President has placed a very high priority on using government resources.
Kepler Martin Still (NASA Ames) 25 April Portals to the Universe: Lessons Learned Meeting - Apr 25, STScI - Martin Still mission duration3.5.
May 17, Capabilities Description of a Rapid Prototyping Capability for Earth-Sun System Sciences RPC Project Team Mississippi State University.
National Science Foundation: Transforming Undergraduate Education in Science, Technology, Engineering, and Mathematics (TUES)
Senior Review Evaluations (1 of 5) Proposals due: 6 March 2015 Panel evaluations: Week of 22 April 2015 Performance factors to be evaluated will include.
Corporation For National Research Initiatives NSF SMETE Library Building the SMETE Library: Getting Started William Y. Arms.
Overview of the National Science Foundation (NSF) and the Major Research Instrumentation (MRI) Program Office of Integrative Activities National Science.
WGClimate Work Plan for John Bates, Chair WGClimate 4th Working Group on Climate Meeting.
April 2, 2013 Longitudinal Data system Governance: Status Report Alan Phillips Deputy Director, Fiscal Affairs, Budgeting and IT Illinois Board of Higher.
IT Governance Steering Committee December 2, 2010.
US NITRD LSN-MAGIC Coordinating Team – Organization and Goals Richard Carlson NGNS Program Manager, Research Division, Office of Advanced Scientific Computing.
Field Project Planning, Operations and Data Services Jim Moore, EOL Field Project Services (FPS) Mike Daniels, EOL Computing, Data and Software (CDS) Facility.
Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center 25 April 2012 Implementing Portals of the Universe, April
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
CXC Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center Recommended Best Practices Roger Brissenden and Belinda Wilkes 25 April 2012.
Reorganization at NCAR Presentation to the UCAR Board of Trustees February 25, 2004.
© L.A.C.E. Research Group, 2003 University of Cadiz Eudoxos Project Teaching Science with a Robotic Telescope EVALUATION OF THE EUDOXOS PROJECT The evaluation.
Conferences - Hosting/co-hosting science conferences - Exhibit and present project output and services at community conferences Training Workshops - Data.
Watertown Public Schools School Committee June 24, 2013 Jean M. Fitzgerald, Ed.D. Superintendent Report on Goals.
AAAC Meeting February, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort at a.
SSSC 02/18/2010 P. Marcum Science Utilization Policies SOFIA SCIENCE UTILIZATION POLICIES Pamela M. Marcum SOFIA Project Scientist SSSC Feb 19, 2010.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
IXYZ Frank Marshall NASA/GSFC 25 April 2012 April 25, 20121Implementing Portals of the Universe.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Citizens Redistricting Commission Civic Engagement Proposal February 11, 2011 Center for Collaborative Policy, California State University, Sacramento.
ACCESS for VALIDITY ACCESS for INNOVATION. Starting January 2011 for NEW proposals Not voluntary – “integral part” of proposal and FastLane Required for.
Planning for Arctic GIS and Geographic Information Infrastructure Sponsored by the Arctic Research Support and Logistics Program 30 October 2003 Seattle,
Spitzer Space Telescope Lisa Storrie-Lombardi Spitzer Science Center, Manager & Asst. Director for Community Affairs Implementing Portals of the Universe:
BPR PHASE IV IMPLEMENTATION NOAA Business Process Re-Engineering Current Status: June 21, 2006 NESDIS Cooperative Institute Directors and Administrators.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
1. Housekeeping Items June 8 th and 9 th put on calendar for 2 nd round of Iowa Core ***Shenandoah participants*** Module 6 training on March 24 th will.
SOFIA 2 nd Generation Instrument Plans & Technology Development Paul Hertz SOFIA Program Scientist & SMD Chief Scientist SOFIA Science Steering Committee.
U.S. Department of Agriculture eGovernment Program eGovernment Working Group Meeting February 11, 2004.
Chandra Education & Public Outreach CXC 1.What Are the Goals of Your Mission's E/PO? Chandra E/PO Goals Increase public engagement with the Space Science.
Physics of the Cosmos Program Analysis Group John Nousek Penn State University International Workshop on Astronomical X–Ray Optics Prague, Czech Republic.
E/PO Activities in the HEASARC 1 James Lochner HEASARC E/PO Lead.
HEASARC and Related Data Center Activities Nicholas White HEASARC Director.
Advanced Technologies in Education Virtual Observatory 1 Virtual Observatory: D-Space Project Athens, 14 November 2004 Elena Tavlaki Head of Research Programs.
1 Rita Sambruna Lia LaPiana NASA HQ NASA HQ The Science Definition Team for the astrophysics-focused use(s) of the Telescope Assets.
The State Climatologist Program and a National Climate Services Initiative Mark A. Shafer Oklahoma Climatological Survey University of Oklahoma.
Eurostat/UNSD Conference on International Outreach and Coordination in National Accounts for Sustainable Development and Growth 6-8 May, Luxembourg These.
1 Geospatial Line of Business Update FGDC Coordination Group April 14, 2009.
Science Data in the Science Mission Directorate (SMD) Jeffrey J.E. Hayes Program Executive for MO & DA, Heliophysics Division August 17, 2011.
1 Douglas Hudgins Exoplanet Exploration Program Scientist Presentation to ExoPAG#8, Denver Colorado October 5, 2013.
The HEASARC Coordinate data, software, and media standards with other astrophysics sites. Established December 1990 The HEASARC Charter: Maintain and disseminate.
Breakout Session Assignments and Goals. Summary of Objectives and Charge to Breakout Groups Desired outcome: a comprehensive vision for NACP Data Management.
UNC Deans Council The North Carolina K-12 Digital Learning Transition Glenn Kleiman Friday Institute for Educational Innovation NC State University College.
ADASS the Planning and Scheduling Perspective Roadmap: - How planning and scheduling fits in at ADASS - ADASS planning and scheduling posters and presentations.
Code 210 All Hands Meeting NOVEMBER 18, Agenda  Procurement Updates  Status of Initiatives  Thank You Program Awards  FPDS Overview.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Course, Curriculum, and Laboratory Improvement (CCLI) Transforming Undergraduate Education in Science, Technology, Engineering and Mathematics PROGRAM.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
BIO AC November 18, 2004 Broadening the Participation of Underrepresented Groups in Science.
Friday Institute Leadership Team Glenn Kleiman, Executive Director Jeni Corn, Director of Evaluation Programs Phil Emer, Director of Technology Planning.
Consortium for Educational Research and Evaluation– North Carolina Building LEA and Regional Professional Development Capacity First Annual Evaluation.
GSMT SWG Meeting November, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort.
University of Wyoming Financial Reporting Initiative Update April 2016.
IPDA Architecture Project International Planetary Data Alliance IPDA Architecture Project Report.
CEOS Working Group on Information System and Services (WGISS) Data Access Infrastructure and Interoperability Standards Andrew Mitchell - NASA Goddard.
ESDIS Standards Office Yonsook Enloe, CTSI 3/2/ FGDC Meeting1.
Educational Portals Examples and Practices
Strategies for NIS Development
NSDL: A New Tool for Teaching and Learning.
Observatory Science Operations
Observatory Science Operations
Visions and Voyages: The Planetary Decadal Survey
Presentation transcript:

Workshop Purpose Paul Hertz April 25, 2012

2 The Importance of Astronomy Science Centers NASA Astronomy Science Centers provide functions for the community: proposal ingestion & data return (the basic GOF functions), archival data curation and access (the basic SARC functions), and repository of mission expertise We’re here to compare best practices of a range of such centers. The archive functions are particularly important because The interaction of the science community with major NASA astrophysics missions is through a science center Observers submit proposals through a science center Observers receive their data in archive-ready condition through a science center Non-observers (archive users) receive their data through a science center Some missions such as surveys (e.g. Fermi) do not even have observers in the sense that pointed observatories do (e.g. Hubble) The fraction of astrophysics research that makes use of archival data is growing A significant fraction of the NASA astrophysics community received funding for analysis of mission data (ADAP is 20% of NASA’s astrophysics grants programs) The pace of new missions being launched is slowing making archival data even more important

3 Portals to the Universe 1.Conduct a comparative review of current astronomy science centers in terms of the kinds of roles and services that they provide; their size (e.g., budget, staff), the extent to which they utilize centralized or distributed approaches to their architecture, the roles and status of their staff, the nature of their host or governing institution governance structure, how they were established by NASA (e.g., sole source versus competition). 2.Identify best practices and lessons learned from experience to date with NASA astronomy science centers. 3.Assess the questions of whether there are optimum sizes or approaches for science centers, whether there are rational break points in levels of service for centers, and what may be significant advantages or disadvantages for different scales of service. NRC Study (2007)

4 NRC Findings and Recommendations Finding: The CXC, STScI, HEASARC, and IPAC have sufficient scientific and programmatic expertise to manage NASA’s current science center responsibilities after the active phases of all current and planned space-based astronomy missions have been completed. -Recommendation 1. NASA should establish a large new center only when the following criteria are met: (1) the existing centers lack the capacity to support a major new scientific initiative and (2) there is an imminent need to develop a new infrastructure to support a broad base of users. -NASA Response 1: NASA concurs with this recommendation. New missions assigned to existing Centers, e.g. Fermi to GSFC/HEASARC, JWST to STScI/MAST. New Center created (SOFIA SMO) to support a broad base of users in a different area of astronomy exploration – airborne astronomy. New Center created (NExScI) to support a broad base of users in a different area of astronomy exploration – exoplanets.

5 NRC Findings and Recommendations Finding: The ability of CXC, STScI, HEASARC, and IPAC to provide the appropriate level of support to the scientific community depends critically on the extent to which they can attract, retain, and effectively deploy individuals with the mix of research and engineering skills necessary to maintain continuity of service. Finding: Embedding GOFs in existing science centers, such as the HEASARC, provides for efficient user support, especially when the scope of a space mission does not require establishing a separate center. Recommendation 2. NASA should adopt a set of best practices as guiding principles to ensure the effectiveness of existing flagship and archival NASA astronomy science centers and to select the operational functions of any future centers. -NASA Response 2: This workshop will help define current best practices. Best practices suggested in the Portals Report follow.

6 Examples of Portals Report Best Practices Mission Operations -Have close interactions among scientists, engineers and programmers. -Have research scientists who actively participate in mission ops & policy decisions. Science Operations -Support robust, accessible, well-documented software. -Use common, rather than instrument-specific, software across missions when possible. -Maintain adequate online supporting materials and a help desk with adequate staffing and rapid turnaround. Data and Archiving -Provide rapid (<24 hr) response to requests for data that have been calibrated and archived. -Support common analysis software and protocols that can be used by all the science centers. Education and Public Outreach -Involve staff scientists and investigators in EPO activities. -Coordinate EPO efforts of smaller missions with EPO systems of large NASA astronomy science centers.

7 NRC Findings and Recommendations Recommendation 3. NASA should ensure that NASA astronomy science centers cooperate among themselves and with other agencies to develop strategies and plans for: developing common protocols and formats for proposal entry; developing a universal infrastructure for data formats and metadata, archiving, and retrieval and analysis tools; and providing curriculum materials and professional development programs for K-12 teachers. -NASA Response 3: Many missions use derivatives of APT, SPOT, or RPS for proposal entry. NASA is now collaborating with the NSF on the Virtual Astronomical Observatory. All NASA archives are participating. All NASA archives now have funded E/PO programs.

8 Workshop Charter In 2007, the National Research Council completed a thorough comparative review of NASA astronomy centers, assessing the roles and services that they provide to the community. The conclusions from that review are summarized in the NRC publication “Portals to the Universe”. These include recommendations that NASA should adopt a set of best practices as guiding principles to ensure the effectiveness of existing astronomy science centers, and that NASA should ensure that science centers should cooperate among themselves and with other agencies to develop strategies and plans. The purpose of this workshop is to provide a forum to understand the current processes used by various astrophysics science centers and identify the current best practices candidates in a report to the Astrophysics Division. The participants in this workshop will include representatives from the Chandra X-ray Center, the Spitzer Science Center, the Infrared Processing and Analysis Center, the NASA Exoplanet Science Institute, Space Telescope Science Institute, Goddard Space Flight Center (SWIFT mission), NASA-Ames (Kepler), and the SOFIA Science Center. Each center will be asked to report on their process for each of the following areas and what they consider works well or not and why.

9 Workshop Charter (cont) Proposal process Schedules and coordination with other observatories (ground and space) Submission tools and proposal format Evaluation processes Grant administration and budget processes Community interaction User committee Newsletters and Technical Reports User support Documentation needs prior to proposal submission User query support/helpdesk Direct support during observations Post-observation support for data reduction and analysis User committee Operational processes Observation planning and scheduling Instrument calibration Archival support Data Storage Long-term data curation In additional, each participant will be asked to identify issues they may have with Astrophysics science policy issues and suggestions for improvements. In particular, Duplication policies Data Access restrictions Complaint processes

10 Workshop Charter (cont) The workshop will be held at the Space Telescope Science Institute, Baltimore, in Spring It will last 1 day. It is anticipated that 2-4 representatives from each science center will attend the workshop in person, and the meeting will be webcast in a manner to allow interactive participation by scientists at remote locations. Remote attendees will be asked to register in advance of the workshop. The meeting format will comprise a series of minute presentations by a representative from each science center, followed by a 30 minutes period for further discussion. A final session will be scheduled for developing the final products of the workshop: 1. A document giving feedback on NASA policies that are constraining operation and may require modification. 3 topics were mentioned: proprietary time; processes for awarding DD time (which probably falls under the proposal process discussion); and guaranteed time for science centers. 2. A best practices document, to be used as a guide for establishing future science operation centers. The NRC Portal report gives high level guidance; this document will focus more on implementation. Contrasts between large and small missions should be drawn, where appropriate. There may also be differences stemming from operational modes: surveys vs GO-dominated missions; collaborative missions with other agencies vs NASA-only missions; multi-user vs PI-led missions. At the end of the workshop, an oral outbrief will be presented to the Astrophysics Division and a written presentation provided to the Astrophysics Division within one month after the workshop. The presentations, report to the Astrophysics Division, and the webcast will be archived at STScI and made available to the broader community, with links established at the appropriate NASA SMD web pages.

11 Mission Timeline visible light (HST)mid-infrared (SOFIA) ORION 11 Last updated: February 7, 2012 * * RXTE decommissioned on January 5, GALEX NASA science data acquisition ended on February 7, * 11 Last updated: April 24, 2012 * * RXTE decommissioned on January 5, GALEX NASA science data acquisition ended on February 7, *