Dr. David Ahlfeld Professor of Civil and Environmental Engineering The Westfield River Basin Optimization Model Demonstration:

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
Advertisements

Antamina Mine Water Management Model Alan Keizur Golder Associates Roberto Manrique Arce Compañia Minera Antamina User Conference 2006 Background The Antamina.
Review of Flood Routing
Water Resources Planning and Management Daene C. McKinney Optimization.
Engineering Hydrology (ECIV 4323)
Selection of Capacity Selection of capacity depends on: Physical characteristics Physical characteristics Inflow outflow characteristics Inflow outflow.
Long Term Storage Long term storage means to store water during high inflows years for the benefit of low inflows years. Long term storage means to store.
Lecture 7: Linear Programming in Excel AGEC 352 Spring 2011 – February 9, 2011 R. Keeney.
US Army Corps of Engineers BUILDING STRONG ® USACE – ACF Operations Bailey Crane Water Management USACE, Mobile District.
Climate and Management Alternatives in Snake River Basin Nathan VanRheenen and Richard N. Palmer Dept. of Civil and Environmental Engineering University.
Mid-Range Streamflow Forecasts for River Management in the Puget Sound Region Richard Palmer Matthew Wiley Department of Civil and Environmental Engineering.
Optimized Flood Control in the Columbia River Basin for a Global Warming Scenario 1Dept. of Civil and Env. Engineering, UW 2CSES Climate Impacts Group,
31 DECEMBER VARIABLE FLOOD CONTROL DRAFT FOR LIBBY RESERVOIR U.S. Army Corps of Engineers Northwestern Division, North Pacific Region.
Review of Reservoir Problem OR753 October 29, 2014 Remote Sensing and GISc, IST.
EE535: Renewable Energy: Systems, Technology & Economics
Nathan VanRheenen Richard N. Palmer Civil and Environmental Engineering University of Washington Recasting the Future Developing.
Yellowtail Dam & Bighorn Lake Billings, Montana January 2011 RECLAMATION Managing Water in the West.
Multipurpose Water Resource Systems
Reservoir and Diversion Data CBRFC Stakeholder Forum July 31, 2012.
Hydropower Dams © The GlobalEd 2 Project Photo credit: Noodle snacks, Wikimedia Gordan Dam, a dammed hydro facility in Tasmania.
Green Energy Hydro Power (Hydroelectric Inflow Dam System) By IP Management Pte Ltd
Hood River Basin Study Water Resources Modeling (MODSIM) Taylor Dixon, Hydrologist February 12, 2014.
Federal Columbia River Power System Operations Planning.
Water Resources Planning and Management Daene C. McKinney Simulating System Performance.
1 Cost Minimization and Cost Curves Beattie, Taylor, and Watts Sections: 3.1a, 3.2a-b, 4.1.
1 System planning 2013 Lecture L8: Short term planning of hydro systems Chapter Contents: –General about short term planning –General about hydropower.
Yellowtail Dam & Bighorn Lake Operating Criteria Review Billings, MT September, 2010 RECLAMATION Managing Water in the West.
ESET ALEMU WEST Consultants, Inc. Bellevue, Washington.
Types of IP Models All-integer linear programs Mixed integer linear programs (MILP) Binary integer linear programs, mixed or all integer: some or all of.
1 Chapter 7 Linear Programming. 2 Linear Programming (LP) Problems Both objective function and constraints are linear. Solutions are highly structured.
Hydro Power 102. Hydroelectric Models in the Northwest.
Hanoi, January 27 th 2015 Enrico Weber DEIB – Politecnico di Milano IMRR Project INTEGRATED AND SUSTAINABLE WATER MANAGEMENT OF RED-THAI BINH RIVER SYSTEM.
1 Scheduling the TVA Hydro System Using RiverWare’s Optimization Suzanne H. Biddle, P.E. Tennessee Valley Authority.
A MANAGEMENT SYSTEM FOR OPTIMIZING OPERATING RULES OF MULTIPURPOSE RESERVOIRS ALLOWING FOR BOTH EXTREME FLOODS AND ECOLOGICAL PERFORMANCE 4 th International.
ST HydroExpert 1 Version 1.1 © HydroByte Software HydroExpert Decision Support System HydroSim XP Simulation Model Startup Tutorial Version 1.3 –
Goal Programming Linear program has multiple objectives, often conflicting in nature Target values or goals can be set for each objective identified Not.
111/11/2015 Reserved flow at the foot of large dams and green electricity Vincent Denis MHyLab Switzerland 1 st October 2009.
Modeling Development CRFS—Technical Meeting November 14, 2012.
Assign Annual Demand for a Purpose CALSIM Simulation Compare the Long-term Average Annual Friant Unit Delivery to Benchmark Study CALSIM Simulation Completed.
USBR Updates: Green River CRFS Meeting March 27, 2014.
Overview of Alabama Power’s Tallapoosa River Operations Martin Dam Relicensing Informational Meeting April 1, 2008 Andy Sheppard, P.E. Project Mgr. - Hydro.
Yellowtail Dam Modeling Results Brian Marotz Hydropower Mitigation Coordinator.
Dr. Richard Palmer Professor and Head Department of Civil and Environmental Engineering University of Massachusetts Amherst.
Resource allocation and optimisation model RAOM October 2003.
US Army Corps of Engineers BUILDING STRONG ® Reservoir Simulation Software “Westfield Sub-basin” Presenter – John Hickey, HEC August 2010.
Klamath ADR Hydrology Report Modeling Results Historical Record and Instream Claims Model Accuracy Jonathan La Marche KADR Hydrologist3/11/2000.
USACE Managing a Drought  Overview  Timeline  Depletion Scenario Current Status– 17 Oct 07.
What is OASIS? Water resources simulation/optimization model
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
PCWA MFP Operations Model All Models are Wrong But Some Models are Useful.
Lecture 16 Economic Dispatch Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Stochastic Optimization
Multi-objective Optimization
Linear Programming Water Resources Planning and Management Daene McKinney.
CADSWES Engineering Enhancements New Methods and Improved Functionality Steve Setzer.
Louisiana Department of Transportation and Development Forecasting Construction Cost Index Values Using Auto Regression Modeling Charles Nickel, P.E. Cost.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Pipe Networks 
Water Resources Planning and Management Daene C. McKinney System Performance Indicators.
Linear Programming and Applications
Modeling with WEAP University of Utah Hydroinformatics - Fall 2015.
Chapter 6 PRODUCTION. CHAPTER 6 OUTLINE 6.1The Technology of Production 6.2Production with One Variable Input (Labor) 6.3Production with Two Variable.
Guide Curve Operations Partition reservoir storage into “pools” Each pool has a separate purpose Release (or avoid releasing) water to reach the “guide.
ADVANCES IN THE SUSTAINABLE MANAGEMENT OF THE YAQUI RIVER RESERVOIRS SYSTEM OCTOBER 20, 2003.
The Aral Game.
Se-Yeun Lee1, Alan F. Hamlet 1,2, Carolyn J. Fitzgerald3, Stephen J
Other renewable energy sources
Dynamic Programming and Applications
Floods and Flood Routing
Flood Routing.
Upper Hudson/Sacandaga River Offer of Settlement
Presentation transcript:

Dr. David Ahlfeld Professor of Civil and Environmental Engineering The Westfield River Basin Optimization Model Demonstration:

KVL CMT BOR LVL WOR WSHP KVL = Knightville (Flood Control) LVL = Littleville (Flood Control) BOR = Borden Brook (Drinking) CMT = Cobble Mountain (Drinking/Hydro) WOR = Woronoco (Hydro) WSHP = West Springfield Hydro Project (Hydro) = Ecological Point of Interest

 Improve current reservoir operations to increase efficiency ◦ Increase hydropower production, increase water supply reliability, decrease flood risk, etc.  Introduce ecological flows to operations ◦ Optimization models will examine how altering operating policies can improve ecological flows while maintaining or improving current reservoir objectives  Plan for the future (Later Presentation) ◦ Short/long term forecasting and climate change

The optimization model calculates releases on a daily time step for each reservoir. Releases are the DECISION VARIABLES Storages are calculated from the Releases: Storage at end of day = Storage at end of prior day + Inflow during the day – Releases during the day Natural inflows to reservoirs are assumed known.

The model releases are bounded by CONSTRAINTS Example Constraints: Release Upper Bound Release Through Turbine ≤ Turbine Capacity Reservoir connectivity Assume Reservoir A flows to Reservoir B Storage of Reservoir B = Prev. Storage at B + Inflows to B + Outflows from A – Releases from B Reservoir Storage Capacity Reservoir Storage ≤ Reservoir Capacity

Example Objective Functions for River Systems: Maximize Income from Hydropower Generation Maximize Available water for municipal use Minimize Deviations from a target storage Minimize Deviations from an ecological flow The optimization model selects releases to maximize or minimize a given objective THE OBJECTIVE FUNCTION

 Targets ◦ Can be violated ◦ Penalize the objective function as deviation from the target increases. Example Deviation from Release Target = Actual Release – Target Minimum Release ◦ The objective function minimizes the deviation below the target  Constraints ◦ Cannot be violated ◦ If the model cannot be satisfy the constraints the problem is infeasible Example Reservoir Storage ≤ 50K acre-ft ◦ The storage must be less than or equal to 50K acre-ft ◦ LINGO will report an infeasible result

Objective Function: Minimize deviations from target storages for KVL, LVL, and CMT. Minimize deviations from minimum release targets for KVL and LVL. Minimize flow over flood target point Maximize power for CMT, WOR, and WSHP Constraints Reservoir Connectivity (i.e. Storage at WOR = Previous Day’s Storage + Releases from KVL, LVL, CMT + Inflow to WOR – Releases from WOR) Reservoir capacities for all reservoirs Turbine capacities for CMT, WOR, WSHP Ramping and release constraints on reservoir releases – produces more realistic hydrograph (limits the unrealistic release spikes) The optimization model is solved with LINGO which communicates with an Excel spreadsheet to read inputs (inflows) and output the releases and resulting storages.

Minimize = Deviations from Target Storages at LVL and KVL + Deviations from Target Storages at CMT + Deviations above the Flood Check Points + Deviations below Min. Flow Targets at LVL and KVL + Income from CMT power generation + - Income from WOR power generation + - Income from WSHP power generation + Weight 1* Weight 2* Weight 3* Weight 4* Weight 5* Weight 6* Weight 7* To prioritize an objective, increase it’s respective weight. Develop Trade-Off Curves: Run the model several times, each time changing the objective function weights.

Begin with analysis of Cobble Mountain (CMT) 70,000 acre-ft reservoir that supplies water to Springfield MW generating capacity – withdrawals to drinking water facility run through turbine and any water released back to the river runs through turbine. The trade-off: How much additional hydropower income can be obtained by relaxing the reservoir’s target volume Vary the weights on CMT Storage and CMT Hydropower

Each point on the curve represents an operating policy. For example, this point says if the operations keep the reservoir at target storage 99% of the time, the income is $1.7M per year Little increase in income for less reservoir reliability Let’s examine this point

Releases to RiverStorages

The optimization model lets us examine the trade-off between Cobble Mountain water supply and an instream flow requirement Each point on the trade-off curve represents the optimal operating policy for that minimum instream flow.

As expected, it is harder for Cobble Mountain to maintain its storage target with increasing instream flow requirements

The optimization model will use these 5 reservoirs to hit the ecological target downstream.

The 2-yr 10-day flow event: The 10 day flow event that is expected to occur every 2 years. Average flow of 4,500 cfs for 10 days The Best Way Achieve This Flow Event Use the available storage in the flood control dams to store water for the target. Only use Cobble Mountain Drinking water if necessary To do this in the optimization model, heavily weight (or prioritize) CMT target storage over LVL and KVL. This will use the flood control storage first.

CMT storage remained constant at each scenario. Drinking water supply not needed for ecological flow