Averting Disaster - Grid Reliability Issues and Standards National Energy Restructuring Conference April 1, 2004 Washington, DC.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Reliability in the International Arena Alberta Perspective
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Notice of Proposed Rulemaking on Standards WECC Board of Directors Meeting December 7-8, 2006.
NERC Reliability Readiness The Next Steps Mitch Needham NERC Readiness Evaluator September 24, 2007.
Structuring and Implementing a Truly International ERO Kevin Kelly Director, Policy Analysis and Rulemaking Office of Markets, Tariffs and Rates Federal.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
COMPLIANCE 101 Module One.
PER Update & Compliance Lessons Learned
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
August 14, 2003 Blackout Final Report
1539pk 2003 MAJOR POWER GRID BLACKOUTS IN NORTH AMERICA AND EUROPE Copyright © P. Kundur This material should not be used without the author's consent.
NERC and Regional Efforts to Ensure Reliability Dave Nevius, NERC Sr. VP David Cook, NERC VP & General Counsel Louise McCarren, WECC CEO Don Benjamin,
1 “The National Grid” Presented To The Fall Tri-State Member Services Conference October 10, 2001 Covington, KY Jeff Mitchell ECAR Manager, Transmission.
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
Mandatory Reliability Rules Implementing the Electric Reliability Organization David W. Hilt Vice President & Director of Compliance APPA Reliability Symposium.
August 2003 Blackout Review Brant Eldridge Executive Manager - ECAR.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
Recommendations from 2011 Southwest Outage Heather Polzin, FERC Office of Enforcement Dave Nevius, Senior Vice President, NERC Member Representatives Committee.
Federal Energy Regulatory Commission June Cyber Security and Reliability Standards Regis F. Binder Director, Division of Logistics & Security Federal.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
WECC Market Interface Committee Update WSPP Spring 2008 Meeting April 8, 2008 Robert D. Schwermann MIC Chair.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
FERC’s New Reliability Initiatives Kevin Kelly Director, Policy Analysis, OMTR Federal Energy Regulatory Commission NARUC Annual Meeting Nashville, TN.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
Overview of WECC and Regulatory Structure
Mandatory Electric Reliability Standards and Transmission Expansion Suedeen G. Kelly Commissioner Federal Energy Regulatory Commission The Canadian Institute.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
Project Real-time Monitoring and Analysis Capabilities Mark Olson, Senior Standards Developer Texas RE NSRS October 5, 2015.
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
The Electric Reliability Organization: Getting from here to there. Gerry Cauley Director, Standards ERO Project Manager ERO Slippery Slope NERC Today Uphill.
RELATIONSHIP BETWEEN COMPETATIVE POWER MARKETS AND GRID RELIABILITY PJM RTO EXPERIANCE vis – a – vis PRACTICES FOLLOWED IN INDIAN GRIDS.
Draft Reliability Standards Development Plan Ryan Stewart, NERC Manager of Standards Development Texas RE NSRS August 17, 2015.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
Standing Up The New Electric Reliability Organization Ellen P. Vancko North American Electric Reliability Council.
Texas Regional Entity Report Mark Henry June 6, 2008.
NERC Event Analysis Overview ERCOT ROS Meeting Austin, Texas May 15, 2006.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
1 Texas Regional Entity Report November Performance Highlights  ERCOT’s Control Performance Standard (NERC CPS1) score for September –
1 Power System Restoration. 2 Not Active 3 4 Compliance Audit Process APPA E&O Technical Conference – Atlanta April 16, 2007.
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
1 Compliance Update June Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
The Electric Reliability Organization NERC’s Proposal for a Strong and Effective ERO FRCC System Operator Seminar Spring 2006.
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
FERC’s Division of Reliability Federal Energy Regulatory Commission – Open Meeting Washington, DC October 6, 2004 Joseph H. McClelland Director, Division.
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
NERC Reliability Readiness The Next Steps
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
MAC Board Effectiveness Survey
Kenneth Silver Los Angeles Department of Water & Power
NERC TPL Standard Overview
Background (history, process to date) Status of CANs
Impacts and Actions Resulting from the August 14, 2003 Blackout
Blackout Investigation Organization
The Electric Reliability Organization: Getting from here to there.
Protecting Grid Reliability
Coordinate Operations Standard
NERC Reliability Standards Development Plan
Overview of WECC and Regulatory Structure
MAC Board Effectiveness Survey
NERC Reliability Standards Development Plan
Blackout Investigation Organization
Presentation transcript:

Averting Disaster - Grid Reliability Issues and Standards National Energy Restructuring Conference April 1, 2004 Washington, DC

NERC Actions to Address the August 14, 2003, Blackout National Energy Restructuring Conference April 1, 2004 Washington, DC

3 NERC Control Areas

4 1:31:34 p.m. August 14, 2003 What Happened? 765kV DC Voltage Montreal Ottawa Toronto Detroit Cleveland Akron Canton Buffalo New York Pittsburg Toledo 2:02 p.m.3:05:41 to 3:41:33 p.m.3:45:33 to 4:08:58 p.m.4:08:58 to 4:10:27 p.m.4:10:00 to 4:10:38 p.m.4:10:40 to 4:10:44 p.m.4:10:44 to 4:13:00 p.m.

5 Investigation Organization NERC Steering Group MAAC/ECAR/NPCC Coordinating Group MAAC ECAR NPCC MEN Study Group Project Planning and Support Sequence of Events Data Requests and Management Investigation Team Lead System Modeling and Simulation Analysis NERC & Regional Standards/Procedures & Compliance Transmission System Performance, Protection, Control Maintenance & Damage Operations - Tools, SCADA/EMS Communications Op Planning System Planning, Design, & Studies Root Cause Analysis Cooper Systems Generator Performance, Protection, Controls Maintenance & Damage U.S – Canada Task Force Vegetation/ROW Management Frequency/ACE Restoration Investigation Process Review

6 Key Findings of Investigation

7 Causes of the Blackout ● Inadequate Situational Awareness ● Failure to manage tree growth in ROWs ● Failure of Reliability Coordinators diagnostic support

8 Violations of NERC Reliability Standards Failure to return system to safe operating state within 30 minutes Failure to notify others of impending emergency State estimator was not used Inadequate training Reliability coordinator did not notify others Reliability coordinator did not have adequate monitoring capability

9 Key Findings ● Several violations ● Compliance monitoring process is inadequate ● Differing interpretations ● Repeats past mistakes ● Data deficiencies in models ● Planning inadequate ● Technologies inconsistent ● Communications not effective

10 NERC Guiding Principles ● Specific information on all violations ● Improve compliance ● Greater transparency to violations ● Work closely with FERC, states, provinces ● Ensure public interest is met

11 NERC Blackout Recommendations ● Corrective actions ● Strategic initiatives ● Technical initiatives

12 Corrective Actions ● Specific actions to correct the direct causes of the blackout ● Certify actions completed by June 30 ● Experts to be available to assist

13 Strategic Initiatives ● Readiness audits ● Performance audits ● Vegetation-related outage reporting ● Recommendations implementation tracking

14 Readiness Audits ● Audit all control areas and reliability coordinators ● Conduct every 3- years ● Reports to the board

15 Performance Reviews ● Modify NERC Compliance Enforcement Program  Regions to submit results to NERC  Provide list of non-compliant entities ● Regular confidential reports to the Board  Specific violations  Results of audits

16 Vegetation Outage Reports ● Transmission owners to report tree contacts to Regions (230+ kV) ● Regions report to NERC ● Use WECC as model ● Regions to conduct annual vegetation management surveys

17 Recommendations Tracking ● NERC and Regions will track:  Implementation of recommendations  Compliance audits  Lessons learned from system disturbances  Use successful regional processes as model

18 Technical Initiatives ● Operator & reliability coordinator emergency response training ● Reactive power & voltage control ● Cascade mitigation ● RC & CA responsibilities ● Real-time operating tools ● Restoration review ● Time-synchronized measurements ● Reevaluate system design, planning & operating criteria ● System modeling & data exchange standards

19 So Where Are We? ● NERC Steering Group – technical investigation is ongoing ● Recommendations approved by NERC standing committees, stakeholders, and Board of Trustees ● Implementing recommendations ● Finalize technical report this spring

20 Issues to be Resolved ● Role of FERC, NRCan ● Non-jurisdictional entities ● Funding: resources and $$$ ● Migrating old standards to new ● Recommendations in final report ● Voluntary vs. mandatory reliability standards or: Will reliability legislation ever pass??

NERC Actions to Address the August 14, 2003, Blackout National Energy Restructuring Conference April 1, 2004 Washington, DC