Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.

Slides:



Advertisements
Similar presentations
Central Vermont Public Service SOUTHERN LOOP COOLIDGE CONNECTOR Coolidge Connector Community Working Group April 30, 2007.
Advertisements

Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
NERC’s Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Reporting the Economics of Reliable Energy Ralph Fehr, P.E. Engineering Consultant Reliability of the U.S. Power Grid.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
Interconnection of Distributed Generation
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
THE TRES AMIGAS SUPERSTATION IIEA - Dublin October 8, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
ISO Grid Planning Presentation to CREPC October 1, 2002
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
“Reactive Power Management and Voltage Stability” Sharma Kolluri, IEEE Fellow Manager of Transmission Planning Entergy Services Inc Presentation at 2012.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Subtransmission Reliability Criteria
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 Bulk Power and Reliability Proposed Changes to Form EIA-411.
Load Forecasting within Vermont & New England Docket 7081 workshop 9/13/05.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
Lecture 1 – Power Quality INTRODUCTION TO POWER QUALITY Power Quality phenomenon-Terms and definitions-Various Power events in power quality - causes for.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Peak RCCo Performance Metrics Draft –November 2013.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Load Data for Vermont Docket 7081 workshop 9/30/05.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
IRP in Vermont Docket 7081 Workshop Sept. 13, 2005.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
20th Century Electric Transmission Grid
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
Reliable Power Reliable Markets Reliable People RAS Guideline Initiative March 23, 2009.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
UM 1751 Energy Storage Workshop #3 May 9, UM 1751 Workshop #3 Topics Most viable and beneficial applications (HB 2193 time frame: ) Emerging.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Nodal Planning Go Live Austin, TX February 3, 2011
Information Needed By All Market Participants To Facilitate Transmission Congestion Studies In ERCOT Presented to the ERCOT ROS by Shannon Caraway, P.E.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Barrilla Junction Area Transmission Improvements Project
Subteam 1a Competitive Solicitations Framework Working Group Meeting
Local Transmission Planning Process: Local Transmission Plan Update Meeting December 15, 2016.
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
DEC System Voltage Planning - June 2018
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
New England Resource Adequacy
NERC Reliability Standards Development Plan
NERC Reliability Standards Development Plan
Presentation transcript:

Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05

9/19/05 Docket 7081 Workshop Dean LaForest 2 What is transmission planning? Transmission planning examines the need for changes to the transmission network as load and power sources change through time in an area  The transmission network consists of all electric transmission lines and substations, typically built and constructed at 115,000 volts or above Vermont has an underlying subtransmission network with significant facilities built and operated at 34,500 and 46,000 volts that often parallel the transmission network VELCO owns and operates the transmission grid in Vermont, while the Vermont distribution companies own and operate the subtransmission network

9/19/05 Docket 7081 Workshop Dean LaForest 3

4

5 What tools and key sets of data are needed and necessary for transmission planning? Need software to model the behavior and performance of the power system Need accurate model of the power system to capture existing system performance and predict future system performance  Model needs input on network characteristics (t-lines / transformers), reactive power sources (generators / caps / sync condensers / FACTs devices), real power sources (generators / HVDC), and loads  Model needs sets of this data for each condition examined (load level / generation dispatch, etc. Need a set of reliability standards against which to measure the system performance and determine whether reinforcements are needed

9/19/05 Docket 7081 Workshop Dean LaForest 6 What are VELCO’s sources for these sets of tools / data? VELCO uses a widely utilized power flow analysis software, allowing high productivity and data interrogation capabilities VELCO provides modeling information for the power system network to ISO-NE, who collects information from the rest of New England and the eastern US / Canada VELCO gets load information from the distribution companies and the DPS for VT, and from the database provided by ISO-NE for areas outside of VT

9/19/05 Docket 7081 Workshop Dean LaForest 7 What are the regional reliability standards? NERC (North American Electric Reliability Council)  Standards found on NERC website (  These are the minimum level of standards the system must meet NPCC (Northeast Power Coordinating Council)  Standards found on NPCC website (  New England by way of the ISO-NE reliability standards is and must be compliant with these criteria, which are more specific than NERC’s criteria

9/19/05 Docket 7081 Workshop Dean LaForest 8 What are the regional (NPCC) reliability standards?

9/19/05 Docket 7081 Workshop Dean LaForest 9 What are the New England (ISO-NE) reliability standards? ISO-NE’s planning criteria are located at ne.com/rules_proceds/isone_plan/index.html ne.com/rules_proceds/isone_plan/index.html Planning Procedure #3 is the key document

9/19/05 Docket 7081 Workshop Dean LaForest 10 Reliability Standards Evolve NERC’s Standards will be more stringent, become mandatory, and will include penalties The FERC will put in place an ERO – and Energy Reliability Organization

9/19/05 Docket 7081 Workshop Dean LaForest 11 The type of system under study matters Vermont system characteristics  Importer of electrical power  Two large sources relative to the load  Minimal reserves  Winter and Summer peaking  Sparse transmission network  Located at one end of the New England system

9/19/05 Docket 7081 Workshop Dean LaForest 12 Planning design example... the problem Question – feed 50 MW of load (Addison county) from a 50 MW generator (McNeil) 40 miles away Choices  46 kV line (can look like a distribution circuit) Single conductor Double conductor  115 kV line (standard VELCO h-frame) The issues  Provide adequate voltage for customers (within 5% of nominal)  Provide coverage for expected outages

9/19/05 Docket 7081 Workshop Dean LaForest 13 The first test... Can 46 kV work?

9/19/05 Docket 7081 Workshop Dean LaForest 14 The first test... Can 46 kV REALLY work?

9/19/05 Docket 7081 Workshop Dean LaForest 15 The first test... Can 46 kV work with two conductors (or bundled conductors)?

9/19/05 Docket 7081 Workshop Dean LaForest miles...

9/19/05 Docket 7081 Workshop Dean LaForest 17 The second test... Can 115 kV work over 40 miles?

9/19/05 Docket 7081 Workshop Dean LaForest 18 To meet a N-1 design standard (be able to suffer the loss of one element)...

9/19/05 Docket 7081 Workshop Dean LaForest 19 VELCO’s design standard for transmission planning... Conforms to NERC, NPCC and ISO-NE planning standards We consider the unavailability of system elements that have potential long duration outages (more than one load cycle)  Highgate DC converter  Underground (or underwater) cables  Transformers  Generators After system adjustment following first outage, VELCO tests all other potential outages

9/19/05 Docket 7081 Workshop Dean LaForest 20 What has VELCO done in the past for long range transmission planning VELCO’s recently performed long range studies include the “Twenty Year Plan” (1987), the “Long Range Transmission Plan” (1992), and “A Strategic Planning Study” (2001)  Each considered, and included, distribution company projects / plans and current regional system information  Each effort used the latest tools and system models available  The earlier two efforts included examination of power source location and its influence on transmission expansion  Each effort built on the past using better tools, and utilized a more thorough understanding of the transmission network (with less predictable performance as time went on).

9/19/05 Docket 7081 Workshop Dean LaForest 21 What VELCO projects included analysis of future system performance? Those projects included the Essex STATCOM (filed June 1999 – docket 6252), the Rutland Region Reliability Project (filed March 2001 – docket 6479), the Northern Loop Project (filed December 2002 – docket 6792) and the Northwest Reliability Project (filed June 2003 – docket 6860)

9/19/05 Docket 7081 Workshop Dean LaForest 22 What peak loads did VELCO experience during these planning efforts?

9/19/05 Docket 7081 Workshop Dean LaForest 23 What will VELCO provide to comply with Act 61? VELCO will perform a study examining system performance 10 years from the present (i.e. 2015). The analysis will likely consider:  All facilities available, and with one facility out due to a long term outage  Stressed transfer conditions  The continued availability of energy from Highgate and how it might influence transmission system design  A reduced load growth scenario and how that might influence the timing of transmission system reinforcements  Proposed in-state generation projects and how they may influence transmission system design VELCO will provide a draft report early in 2006 and hold public meetings to promote discussion and elicit comments before publishing a final report by July 1, 2006

9/19/05 Docket 7081 Workshop Dean LaForest 24 What activities will take place within the Long Range Planning process? Involve the Vermont distribution companies (via the Vermont Utility Planning Group) in review of interim results and proposed solutions  Make certain that distribution utility issues / projects are considered and properly reflected in the analysis Involve ISO-NE through collaborative meetings to review results, refine modeling of beyond Vermont conditions / assumptions and provide / seek input on the transmission system design necessary to address system deficiencies that do not meet design criteria Propose a series of alternatives to any discovered system wide deficiency  Provide planning grade cost estimates for the alternatives to allow ranking

9/19/05 Docket 7081 Workshop Dean LaForest 25 Questions?

9/19/05 Docket 7081 Workshop Lawrence Kirby 26 A probabilistic reliability guideline for subtransmission planning, based on the equal slope criterion

9/19/05 Docket 7081 Workshop Lawrence Kirby 27

9/19/05 Docket 7081 Workshop Lawrence Kirby 28

9/19/05 Docket 7081 Workshop Dean LaForest 29 Equal Slope Criterion