Engineering Economics Contemporary Engineering Economics, 5 th edition, © 2010.

Slides:



Advertisements
Similar presentations
Incremental Analysis Lecture No. 21 Professor C. S. Park
Advertisements

Contemporary Engineering Economics, 4 th edition, © 2007 Incremental Analysis Lecture No. 28 Chapter 7 Contemporary Engineering Economics Copyright © 2006.
Lecture 7 Evaluating a Single Project PW, FW, AW IRR
PRESENT WORTH ANALYSIS
Contemporary Engineering Economics, 4 th edition, © 2007 Initial Project Screening Method - Payback Period Lecture No.15 Chapter 5 Contemporary Engineering.
Evaluating Business and Engineering Assets Payback Period.
MANAGERIAL ACCOUNTING
B280F Introduction to Financial Management
2-1 Copyright © 2006 McGraw Hill Ryerson Limited prepared by: Sujata Madan McGill University Fundamentals of Corporate Finance Third Canadian Edition.
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
EGR Evaluation Alternatives Present Worth Analysis Companies constantly evaluate whether or not to pursue projects. Mutually Exclusive Projects.
Lecture 5 Engineering Economics ENGR 3300 Department of Mechanical Engineering Inter American University of Puerto Rico Bayamon Campus Dr. Omar E. Meza.
InvestmentWorth Investment Worth. Given a minimum attractive rate-of-return, be able to evaluate the investment worth of a project using Net Present Worth.
Contemporary Engineering Economics, 4 th edition, © 2007 Variations of Present Worth Analysis Lecture No.17 Chapter 5 Contemporary Engineering Economics.
Lecture No.15 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Evaluating Business and Engineering Assets – Part II Part II Professor C. S. Park Copyright © 2005.
Flash back before we compare mutually exclusive alternatives.
Contemporary Engineering Economics, 4 th edition, © 2007 Initial Project Screening Method - Payback Period Lecture No.15 Chapter 5 Contemporary Engineering.
Present Worth Analysis Lecture No.15 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Engineering Economy IEN255 Chapter 4 - Present Worth Analysis  Do the product or not?  3 main issues  How much additional investment in plant & equipment.
Internal Rate of Return (Multiple Rates of Return Problem) Lecture No. 20 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
(c) 2001 Contemporary Engineering Economics 1 Chapter 9 Rate of Return Analysis Rate of Return Methods for Finding ROR Internal Rate of Return (IRR) Criterion.
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
(c) 2001 Contemporary Engineering Economics 1 Chapter 9 Rate of Return Analysis Rate of Return Methods for Finding ROR Internal Rate of Return (IRR) Criterion.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 2000 Chapter Three Opportunity Cost of Capital and of Capital and Capital Budgeting.
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
Intro to Engineering Economy
Present Worth Analysis Lecture slides to accompany
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Rate of Return Analysis Lecture No.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Project Screening Method – Payback.
Opportunity Cost of Capital and Capital Budgeting
Capital Budgeting Decisions
Lecture No. 26 Chapter 7 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Capital Budgeting MF 807 Corporate Finance Professor Thomas Chemmanur.
Contemporary Engineering Economics, 4 th edition, © 2007 Initial Project Screening Method - Payback Period Lecture No.15 Chapter 5 Contemporary Engineering.
L15: Present Worth Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Variations in Present Worth Analysis.
Opportunity Cost of Capital and Capital Budgeting Chapter Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
L14: Evaluating Business and Engineering Assets – Part II ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering.
1 Word Problems Organize the Data Given: Determine the objective and your strategy. Draw the Cash Flow Diagram. Write Equations and Solve. Reflect Back.
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 5-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Discounted Cash Flow Analysis Lecture.
Net Present Value and Other Investment Criteria By : Else Fernanda, SE.Ak., M.Sc. ICFI.
Ch 10-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Part II: Evaluating business & engineering assets Ch 5: Present worth analysis Ch 6: Annual equivalence analysis Ch 7: Rate-of-return analysis.
Chapter 6 – Multiple Cash FlowsCopyright 2008 John Wiley & Sons 1 CHAPTER 10 The Fundamentals of Capital Budgeting.
Chapter 5 Present-Worth Analysis. 2 Loan versus Project Cash Flows Initial Project Screening Methods Present-Worth Analysis Methods to Compare Mutually.
L16: Comparing Mutually Exclusive Alternatives ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
Class # 7 Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 5-1.
Initial Project Screening Method - Payback Period
Part 1 : Understanding Money And Its Management (Ch1,2,3,4) Part 2: Evaluating Business and Engineering Assets (5,6,7)
Chapter 5: Evaluating a Single Project
Project Screening Method – Payback Period
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
Variations in Present Worth Analysis
Evaluation Alternatives Present Worth Analysis
Comparing Mutually Exclusive Alternatives
Discounted Cash Flow Analysis
Chapter 5: Evaluating a Single Project
Chapter 9 Rate of Return Analysis
Chapter 7 Present Worth Analysis
Initial Project Screening Method - Payback Period
RATE OF RETURN ANALYSIS CHAPTER 7
PRESENT WORTH ANALYSIS Chapter 5
Capital Budgeting Techniques
OUTLINE Questions? News? New homework due Wednesday
Presentation transcript:

Engineering Economics Contemporary Engineering Economics, 5 th edition, © 2010

Federal Express Nature of Project: Equip 40,000 carriers with Power Pads Save 10 seconds per pickup stop Investment cost: $150 million Expected savings: $20 million per year Federal Express

Ultimate Questions Is it worth investing $150 million to save $20 million per year, say over 10 years? How long does it take to recover the initial investment? What kind of interest rate should be used in evaluating business investment opportunities?

Mr. John Smith’s Investment Problem Built a hydroelectric plant using his personal savings of $800,000 Power generating capacity of 6 million kwhs Estimated annual power sales after taxes - $120,000 Expected service life of 50 years  Was Smith’s $800,000 investment a wise one?  How long does he have to wait to recover his initial investment, and will he ever make a profit?

Mr. John Smith’s Hydro Project

Question?? How long does it take to recover the investments made by Mr. John Smith from his hydroelectric project?

Bank Loan vs. Project Cash Flows Contemporary Engineering Economics, 5 th edition, © 2010

Example 5.1 Describing Project Cash Flows – A Computer-Process Control Project Year (n) Cash Inflows (Benefits) Cash Outflows (Costs) Net Cash Flows 00$650,000-$650, ,50053,000162, ,50053,000162,500 ………… 8215,50053,000162,500

Present Worth Analysis of Equal-life Alternatives $650,000 A = $215,500 A = $53,000 $650,000 A = $162,500 =

Practice Problem How long does it take to recover the initial investment for the computer process control system project in Example 5.1? Contemporary Engineering Economics, 5 th edition, © 2010

Example 5.3 Payback Period Contemporary Engineering Economics, 5 th edition, © 2010 NCash FlowCum. Flow $105,000+$20,000 $15,000 $25,000 $35,000 $45,000 $35,000 -$85,000 -$70,000 -$45,000 -$10,000 $35,000 $80,000 $115,000 Payback period should occurs somewhere between N = 3 and N = 4. Replacing an old machine (salvage value =$20,000) with a new machine $105,000 value.

Contemporary Engineering Economics, 5 th edition, © 2010 $85,000 $15,000 $25,000 $35,000 $45,000 $35, Years Annual cash flow -100, , , , , Years (n) 3.2 years Payback period Cumulative cash flow ($)

Payback Period Contemporary Engineering Economics, 5 th edition, © 2010  Principle: How fast can I recover my initial investment?  Method: Based on the cumulative cash flow (or accounting profit)  Screening Guideline: If the payback period is less than or equal to some specified bench-mark period, the project would be considered for further analysis.  Weakness: Does not consider the time value of money

Contemporary Engineering Economics, 5 th edition, © 2010 Discounted Payback Period Calculation Period (n) Cash Flow (A n ) Cost of Funds (15%)* Ending Cash Balance 0-$85, ,000-$85,000(0.15) = -$12,750-82, ,000-$82,750(0.15) = -12,413-70, ,000-$70,163(0.15) = -10,524-45, ,000-$45,687(0.15) =-6,853-7, ,000-$7,540(0.15) = -1,13136, ,000$36,329(0.15) = 5,44976,778 * Cost of funds = (Unrecovered beginning balance) X (interest rate)

Illustration of Discounted Payback Period Contemporary Engineering Economics, 5 th edition, © 2010

Present Worth Analysis Notice that the payback was not using the time value money into consideration When we consider the time value money the techniques are called discounted cash flow such as net present worth PW or net present value PV The net present worth is the difference between the present value of the inflows and the present value of the outflows. The NPV value will help us decide if the investment is acceptable or not.

Evaluation of a Single Project Step1: determine interest rate this interest rate is often referred to as Minimum Attractive Rate of Return or MARR Step 2: Estimate the service life of the project Step 3: Estimate the cash inflow for each period over the service life Step 4: Estimate the cash outflow for each period over the service life Step 5: Determine the net cash flows for each period (net cash flow=cash inflow – cash outflow) Step 6: Find the present worth of each net cash flow at the MARR. The sum for periods present worth is defined as the present worth of the project Step 7: The positive PW means the project should be accepted, while if negative should be rejected

Net Present Worth Measure  Principle: Compute the equivalent net surplus at n = 0 for a given interest rate of i.  Decision Rule: Accept the project if the net surplus is positive Inflow Outflow 0 PW(i) inflow PW(i) outflow Net surplus PW(i) > 0

Comparing More than One Alternative The following guidelines should be considered when comparing more than one project: If you need to select the best alternative based on PW we select the highest PW as long as they have the same service lives Some alternatives are based on cost then we will accept the one with lowest PW of cost

Example - Tiger Machine Tool Company Net Present Worth – Uneven flows $75,000 $24,400 $27,340 $55, outflow inflow Considering acquiring a new metal-cutting machine

ABC 1PeriodCash Flow 20($75,000) 31$24,400 42$27,340 53$55, PW(15%)$3, =NPV(15%,B3:B5)+B2 Excel Solution

PW (i) ($ thousands) i = MARR (%) $ % Break even interest rate (or rate of return) Accept Reject Present Worth Profile It is crucial to estimate the MARR correctly

Present Worth Amounts at Varying Interest Rates i (%)PW(i)i(%)PW(i) 0$32,50020-$3, , , , , , , , , , , , , , , , , *038-21, ,302 *Break even interest rate Indicates that the investment project has a positive NPW if the interest rate is below 17.45%

What Factors Should the Company Consider in Selecting a MARR in Project Evaluation? Risk-free return Inflation factor Risk premiums For example if you were to invest $1,000 in risk-free US Treasury bills for a year, you would expect a real rate of return of 2%. Notice that you risk premium is zero but you have to add inflation effect which might be at 4% during that investment period. That is a total of 6% if I am dealing with internet stock then the risk premium will be around 20% that is a total of 26%

Guideline for Selecting a MARR Real Return2% Inflation4% Risk premium0% Total expected return 6% Real Return2% Inflation4% Risk premium20 % Total expected return 26 % Risk-free real return Inflation Risk premium U.S. Treasury Bills Amazon.com Very safe Very risky

Can you explain what PW really means? 1. Investment Pool Concept: It is defined as the firm’s treasury where all fund transactions are administrated and managed. If not used it will earn interest at the MARR 2. Project Balance Concept: Where the balance of the project is been tracked assuming that the money is been borrowed with interest (i)

Investment Pool Concept Suppose the company has $75,000. It has two options. (1)Take the money out and invest it in the project or (2) leave the money in the company. Let’s see what the consequences are for each option.

$75, $24,400 $27,340 $55,760 Investment pool How much would you have if the Investment is made? $24,400(F/P,15%,2) = $32,269 $27,340(F/P,15%,1) = $31,441 $55,760(F/P,15%,0) = $55,760 $119,470 How much would you have if the investment was not made? $75,000(F/P,15%,3) = $114,066 What is the net gain from the investment? $119,470 - $114,066 = $5,404 Project Return to investment pool N = 3 Meaning of Net Present Worth PW(15%) = $5,404(P/F,15%,3) = $3,553

Future Worth Criterion  Given: Cash flows and Minimum Attractive Rate of Return (MARR) (i)  Find: The net equivalent worth at the end of project life $75,000 $24,400 $27,340 $55, Project life

Future Worth Criterion

ABC 1PeriodCash Flow 20($75,000) 31$24,400 42$27,340 53$55,760 6PW(15%)$ FW(15%)$5, =FV(15%,3,0,-B6) Excel Solution

How To Use Cash Flow Analyzer Cash Flow Input Fields Output or Analysis results Graphical Plots

Solving Example with Cash Flow Analyzer Net Present Worth Net Future Worth Payback period Project Cash Flows

Obtaining a NPW Plot Specify the Range of Interest Rate to plot NPW plot Between 0% and 100%

Project Balance Concept Suppose that the firm has no internal funds to finance the project, so will borrow the entire investment from a bank at an interest rate of 12%. Then, any proceeds from the project will be used to pay off the bank loan. Then, our interest is to see if how much money would be left over at the end of the project period.

Project Balance Concept N0123N0123N0123N0123 Beginning Balance Interest Payment Project Balance -$75,000 -$11,250 +$24,400 -$61,850 -$9,278 +$27,340 -$43,788 -$6,568 +$55,760 +$5,404 Net future worth, FW(15%) PW(15%) = $5,404 (P/F, 15%, 3) = $3,553

Project Balance Diagram 60,000 40,000 20, , , , , , , $75,000 -$61,850 -$43,788 $5,404 Year(n) Terminal project balance (net future worth, or project surplus) Discounted payback period Project balance ($)

Example 5.8 Project’s Service Life is Extremely Long Contemporary Engineering Economics, 5 th edition, © 2010 Going back to Mr. John Smith’s Investment  Q1: Was Smith's $800,000 investment a wise one?  Q2: How long does he have to wait to recover his initial investment, and will he ever make a profit? Built a hydroelectric plant using his personal savings of $800,000 Power generating capacity of 6 million kwhs Estimated annual power sales after taxes - $120,000 Expected service life of 50 years

Mr. Smith’s Hydroelectric Project Contemporary Engineering Economics, 5 th edition, © 2010

How Would You Find P for a Perpetual Cash Flow Series, A? Contemporary Engineering Economics, 5 th edition, © 2010

Capitalized Equivalent Worth  Principle: PW for a project with an annual receipt of A over infinite service life  Equation: CE(i) = A(P/A, i, ) = A/i Contemporary Engineering Economics, 5 th edition, © 2010 A 0 P =CE(i)

It is a special case of the PW that is used when the life of the proposed project is perpetual or the planning horizon is long (example 40 years or more) such as dams, bridges, etc. The process of computing the PW for this infinite series is referred to as the capitalization of project cost. The cost is known as the capitalized cost Capitalized Equivalent Worth (CE)

Capitalized Cost: Represents the amount of money that must be invested today in order to yield a certain return A at the end of each and every period forever, assuming interest rate i Capitalized Equivalent Worth (CE)

Practice Problem Contemporary Engineering Economics, 5 th edition, © $1,000 $2,000 P = CE (10%) = ? 0 Given: i = 10%, N = ∞ Find: P or CE (10%) ∞

Solution: Contemporary Engineering Economics, 4 th edition, © $1,000 $2,000 P = CE (10%) = ? 0 ∞

A Bridge Construction Project Contemporary Engineering Economics, 5 th edition, © 2010  Construction cost = $2,000,000  Annual Maintenance cost = $50,000  Renovation cost = $500,000 every 15 years  Planning horizon = infinite period  Interest rate = 5%

Cash Flow Diagram for the Bridge Construction Project Contemporary Engineering Economics, 5 th edition, © 2010 $500,000 $2,000,000 $50, Years

 Construction Cost P 1 = $2,000,000  Maintenance Costs P 2 = $50,000/0.05 = $1,000,000  Renovation Costs P 3 = $500,000(P/F, 5%, 15) + $500,000(P/F, 5%, 30) + $500,000(P/F, 5%, 45) + $500,000(P/F, 5%, 60). = {$500,000(A/F, 5%, 15)}/0.05 = $463,423  Total Present Worth P = P 1 + P 2 + P 3 = $3,463,423 Solution:

Alternate way to calculate P 3  Concept: Find the effective interest rate per payment period  Effective interest rate for a 15-year cycle i = ( ) = %  Capitalized equivalent worth P 3 = $500,000/ = $463,423 Contemporary Engineering Economics, 5 th edition, © $500,000 Effective interest rate for a 15-year period

Comparing Mutually Exclusive Projects Contemporary Engineering Economics, 5 th edition, © 2010  Principle: Projects must be compared over an equal time span.  Rule of Thumb: If the required service period is given, the analysis period should be the same as the required service period.

Case 1  Analysis Period Equals Project Lives with different levels of investment  What to do: Compute the NPW for each project over its life and select the project with the largest NPW. Contemporary Engineering Economics, 5 th edition, © 2010

Comparing projects Assume that the unused funds will be invested at MARR. Contemporary Engineering Economics, 5 th edition, © 2010 This portion of investment will earn a 10% return on investment.

Case 2  Project Lives Longer than the Analysis Period  What to do:  Estimate the salvage value at the end of the required service period.  Compute the NPW for each project over the required service period.  PW(15%) A = -$362  PW(15%) B = -$364 Contemporary Engineering Economics, 5 th edition, © 2010

Case 3A – Service Projects  Project Lives Shorter than the Analysis Period (Automatic Mailing System)  What to do:  Come up with replacement projects that match or exceed the required service period.  Compute the NPW for each project over the required service period.  PW(15%) A = -$34,359  PW(15%) B = -$31,031 Contemporary Engineering Economics, 5 th edition, © 2010

Case 3B – Revenue Projects  Analysis Period Coincides with the Project with the Longest Life in the Mutually Exclusive Group (Family operated company found oil in the land they have the options to Drill or Lease)  What to do:  Compute the NPW of each project over its analysis period, assuming that no cash flows after the service life for the shorter-lived project.  PW(15%) Drill = $2,208,470  PW(15%) Lease = $2,180,210 Contemporary Engineering Economics, 5 th edition, © 2010

Case 4  Analysis Period Is Not Specified  What to do:  Come up with replacement projects that serve out the least common multiple period (LCM).  Compute the NPW for each project over the LCM.  PW(15%) A = -$53,657  PW(15%) B = -$48,534 Contemporary Engineering Economics, 5 th edition, © 2010

Summary Present worth is an equivalence method of analysis in which a project’s cash flows are discounted to a lump sum amount at present time. The MARR or minimum attractive rate of return is the interest rate at which a firm can always earn or borrow money. MARR is generally dictated by management and is the rate at which NPW analysis should be conducted. Two measures of investment, the net future worth and the capitalized equivalent worth, are variations to the NPW criterion. The term mutually exclusive means that, when one of several alternatives that meet the same need is selected, the others will be rejected.

Contemporary Engineering Economics, 5 th edition, © 2010