Value Engineering Session Air Treatment / HVAC November 27, 2007 Lee Hammond, FNAL CFS.

Slides:



Advertisements
Similar presentations
HVAC Basics Bin Yan HVAC – Heating, Ventilation, Air-conditioning.
Advertisements

Heating, Ventilating, and Air-Conditioning
Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Nov. 07 DR-KOM-CFS 1 Damping Rings KOM Conventional Facility & Siting Overview Tom Lackowski Acknowledgment: Atsushi Enomoto, Jean-Luc Baldy, John Osborne,
PLANT HVAC SYSTEMS DU-109-PP PLANT HVAC SYSTEMS.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Objectives Finish with ducts and fans Define project topics.
November 17, 2008 ILC08 HVAC and VE Update November 17, 2008 ILC CFS Workshop 2008 Chicago Lee Hammond, Fermilab Global Design Effort.
Active beams versus VAV with Reheat Analysis of May 2013 ASHRAE Journal article Ken Loudermilk Vice President, Technology & Developement.
Lecture Objectives: Model processes in AHU –Use eQUEST predefined models –Use detail modeling Define your topics for your final project.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
Air Conditioning Systems
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
1 ILC Mechanical & Electrical Review Conventional MECHANICAL System Design Summary Emil Huedem, FNAL Lee Hammond, FNAL Parsons Mechanical Team (Tim Sheehan,
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Lecture Objectives: Model processes in AHU –Use eQUEST predefined models –Use detail modeling Define your topics for your final project.
1 HVAC OVERVIEW and VALUE ENGINEERING ITEMS August 13, 2008 CLIC Working Group CES Lee Hammond, Fermilab.
First Considerations on CLIC Cooling System Ch. Martel, J. Inigo-Golfin TS/CV.
Central Region Discussion Power and Cooling GDE Beijing-CFS.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Important variables Water: Air: Conversion:
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
E Huedem, Nov ILC VALUE ENGINEERING SESSION of POWER & COOLING (Focus on Main Shaft 7) November 27, 2007 INFORMATION PHASE Conventional.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
1 Process Water and Air Treatment 01 June 2007 Emil Huedem, Maurice Ball, Lee Hammond Fermilab.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
World Health Organization
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
PSB Beam Dump Cooling Constraints Glen Mason EN-CV 30 August 2012.
SLAC_OCT07 BDS-KOM-CFS 1 Beam Delivery System & Interaction Region KOM Conventional Facility & Siting Overview Fred Asiri/SLAC Acknowledgment: Atsushi.
Global Design Effort1 September 20-22, 2006 MAC Review Power and Water breakout (mixed results) Marc Ross GDE.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
Announcement Course Exam November 3rd In class: 90 minutes long Examples will be posted on the course website.
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL CERN TS/CV Wednesday 9 th July 2008 CLIC.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
Lecture Objectives: Plumbing Pumps Hydronic distribution systems
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long.
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
CFS EDR KICK OFF MEETING Air Treatment August 23, 2007 Lee Hammond, FNAL CFS.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Update on the PSB Cooling and Ventilation Systems
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
The Data Center Challenge
Conventional Facility & Siting (CF&S) Overview for the Positron Source
Lecture Objectives: Discuss Final Project
CFS EDR KICK OFF MEETING Process Water August 23, 2007
ZONING (see section 17.0) Zoning alternatives Constant Volume (CV)
HVAC EQUIPMENT: COOLING SOURCES (see Chapter 16)
Americas KlyCluster Cost Analysis Overview
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
COOLING & VENTILATION INFRASTRUCTURE
Lecture Objectives: Answer questions related to HW 4
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Lecture Objectives: Answer questions related to HW 4
Brian Wallingford, Applications Engineer
Chilled Beam Performance:
Psychrometry & Air-conditioning
Lecture Objectives: Discuss HW4 parts
Announcements Exam 1 Next Class (Thursday, March 14th):
Objective Revie the Cooling Cycle Learn about air distribution systems
Presentation transcript:

Value Engineering Session Air Treatment / HVAC November 27, 2007 Lee Hammond, FNAL CFS

Air treatment Design Basis Tunnel Ventilation – Conditioned dehumidified air from surface mounted DX equipment is ducted into the service tunnel at each shaft. A volume of 15000cfm (425meter³/min) flows at approximately 88fpm (1.6km/hr) to the midpoint between shafts where it is routed into the beam tunnel and returned to the shaft area. Conditioned fresh air at a rate of 20% is mixed into the air and it is recirculated back to the service tunnel. Air volumes for the DR and BDS are similar The air direction is reversible and capable of being doubled (unconditioned) during hazardous situations. The design temperature for the ML service and beam tunnel is 80-90F (27- 32C). ML electronic’s heat rejection is mainly to CHW direct cooling and FCUs with small amounts of heat to the ventilation air. AHU and FCUs used at alcoves and shaft areas. The design temperature for the DR tunnel is 104F (40C), using process water fan coil units, and the tunnel wall as a heat rejection source

Air treatment Design Basis The design temperature for the BDS is 85-90F (29-32C). The low “heat to air” load is mainly absorbed by the tunnel wall. Air mixing fans will be used for temperature stability as required by the BDS. Used the basis that airflow could pass from the service tunnel to the beam tunnel through fire/smoke/ODH/radiation protected passages between the tunnels. This assumes that radiation/oxygen deficiency hazards (ODH) do not exist or can be mitigated between the tunnels from the standpoint of air mixing. This item needs concurrence from ML group. AHU and FCU sizes in the alcoves and tunnels did not consider heat absorption by the rock wall. These units use chilled water from the surface as the heat rejection source.

CFS Air Treatment Layout

AIR SYSTEM CONCEPT (assume no issues with mixing airflow between service and beam tunnel) Shaft 7 Service tunnel Beam tunnel 64 waveguide penetrations Neutral air, ~15,000 cfm = 1 mph air speed (88 fpm) 85 F

IF “Waveguide at Penetration” is aircooled and no issues with mixing airflow between service and beam tunnel Shaft 7 Service tunnel Beam tunnel 64 waveguide penetrations Neutral air, ~15,000 cfm = 1 mph air speed (88 fpm) KW per waveguide pene 7 air delta T X 64 = additional 19,200 cfm air Waveguide load in the beam tunnel will still need be picked up by fancoils Means of air balancing at each penetration needed Some part of tunnel will have ~200 fpm air speed 85 F 92 F

Rock Contribution? Some discussions and preliminary investigation, but not considered There still is considerable load to air per RF, that chilled fancoils are needed

Air Treatment WBS Air Treatment is about 1% (or 5.5% of CFS when CHW system is moved to the air treatment section ) RDR

RDR Chilled Water Schematic x 26 qty CHW Plant at Shaft 7

Surface Air/CHW Plant locations 1.1 DUMPS

HVAC: Cost Basis Used R.S.Means Cost Book for typical HVAC items such as ducting, fans, piping, insulation etc Used vendors budgetary quote for large dehumidification air handling systems not in R.S.Means

Air Treatment Summary  Air Treatment Components in RDR:  Large DX air handling systems providing heating, cooling, dehumidification, humidification.  Fans for air purge, tunnel and shaft pressurization  Miscellaneous ducting and accessories, dampers, insulation, etc  Chilled water systems including chillers, cooling towers, piping and accessories will be moved to the Air Treatment WBS  Air treatment design is dependent on the ventilation requirements and the heat load criteria received from the area systems  Air treatment and purge systems have not been fully investigated for radiation and ODH issues. Need further input on air flow configuration concerning radiation and ODH issues  Air treatment and purge systems configuration were not developed with consensus of any AHJ (authority having jurisdiction, even who this is may not be identified for some time). Need fire protection consultant.

Air Treatment/CHW – V alue engineering/optimization Combine currently separated Fan Systems All chilled water aircooled Consider heat rejection to cooling ponds where possible Dehumidification equipment desiccant type Air handling/dehumidification systems chilled water instead of DX Piping Materials, why stainless, why not PVC, copper, HDPE Optimize CHW temperature for electronics and air cooling