Staying on Top of Permits & Public Comments Public Comments Policy Track: Sunday, February 28, 2010 4-5:30 pm.

Slides:



Advertisements
Similar presentations
Federal Energy and Environmental Regulation Agencies and Laws
Advertisements

1 State Records Center Searching and Requesting Inventory  Versatile web address:  Look for any new ‘Special.
Regional Sewer Districts and IDEM Bruno Pigott Assistant Commissioner Office of Water Quality September 22, 2009 The Indiana Department of Environmental.
ADEQ Regulatory Process
National Pollutant Discharge Elimination System -NPDES Permit Process-
IDEM TMDL 101 Everything you wanted to know about Total Maximum Daily Loads.
NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.
Spectra Energy Partners Texas Eastern Transmission, LP Ohio Pipeline Energy Network Project (OPEN) Clean Water Act Section 401 Water Quality Certification.
Webinar: EPA’s Environmental Enforcement Data August 10, 2011.
Powers and Functions of Administrative Agencies
Powers and Functions of Administrative Agencies. Question - Net-Neutrality FTC Announced Final Regulations – Late February 2015 Imagine you are a member.
Federal Energy and Environmental Regulation Agencies and Laws
New Haven CommunitySchools. Real Time Access to Grades and Attendance Real Time Access to Daily Comments Real Time Access to Daily Lunches Register for.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
Clean Water Act (CWA) (1977, 1981, 1987). Description and Affects This Act was put into place in order to regulate the amount of pollutants that were.
EDMR Electronic data submittal system Jeffrey A. Ewick, Section Chief Data and Information Services Section Electronic Discharge Monitoring Report.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Environmental Compliance Assistance Workshop for Colleges and Universities September 13-14, 2005 Chapel Hill, NC.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
Proposed 2013 Revision to ORSANCO Pollution Control Standards for Discharges to the Ohio River.
Technical Regulations – U.S. Procedures and Practices U.S.-Brazil Commercial Dialogue Digital Video Conference Series August 22, 2006 Mary Saunders Chief,
Lee Pera and Ethan McMahon Office of Environmental Information July 21, 2010 U.S. Environmental Protection Agency Educator Resources.
©2006, CSA Creating and Managing Your COS Expertise Profile Managing Your CV and Promoting Your Work ® Resources for Research, Worldwide.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Regulations that Protect Clean Water Jocelyn Mullen, P.E. PART 2 OF PRESENTATION Presented at The Water Course January 27, 2010 Mesa County Water Association.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
Steps in the Hazardous Waste Permit Reissuance Process December 10, 2014.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
0 District Self-Monitoring October 2015 Web-based Monitoring System (WBMS) for the Tennessee Department of Education Division of Consolidated Planning.
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
Environmental Justice & Air Permitting Training - August 15, 2012 EPA Region IV – Atlanta, Georgia.
Participation and Intervention before the FERC October 2007.
WATER QUALITY TOPICS ENFORCEMENT – ARE FINES BECOMING A WAY OF LIFE AT THE DEQ By:Donald D. Maisch Supervising Attorney, Water Quality Division Office.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Environmental Decision Making SC.912.L Why have environmental laws?  To regulate activities that are harmful to the environment. a. E.g., Clean.
COMPLIANCE MONITORING and INSPECTIONS Or, how to run an effective program through an adequate field presence.
© 2004 West Legal Studies in Business A Division of Thomson Learning 1 Chapter 24 Environmental Law.
Administrative Law The Enactment of Rules and Regulations.
Enforcement What to Expect From the Water Boards, and What to Look for Locally ENTS Workshop August Mark Bradley Office of Enforcement CA State.
1 Welcome to the CLU-IN Internet Seminar Tribal Consultation Informational Webinar - Institutional Controls in Indian Country Sponsored by: U.S. EPA Office.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
©2001 West Legal Studies in Business. All Rights Reserved. 1 Chapter 25: Environmental Law.
1 Electronic DMRs: Key to Burden Reduction and Improved NPDES Program Management David Hindin, Director, Enforcement Targeting and Data Division Office.
1 Special Information Session on USEPA’s Carbon Rules & Clean Air Act Section 111 North Carolina Division of Air Quality Special Information Session on.
Changes to Contested Case Hearing Requirements and Procedures Janis Hudson Environmental Law Division Texas Commission on Environmental Quality Advanced.
Docket number CP16-21 Tennessee Gas Pipeline, LLC (the Northeast Energy Direct pipeline)
Grant County Zoning Ordinance Review Public Comment Forum Todd Kays:Executive Director – 1 st District Association of Local Governments.
Rulemaking by APHIS. What is a rule and when must APHIS conduct rulemaking? Under U.S. law, a rule is any requirement of general applicability and future.
NIOSH AND OSHA REGULATIONS AND CONTACT LENS USE BY: DR. MARK W. BURCHAM.
The Clean Water Act (1977, 1981, 1987) By: Jonas Szajowitz.
The Fish Kill Mystery For notes and information regarding this activity, please visit:
Washington State Collection Agency Board: Regulatory Process Grace Hamilton, Investigator Department of Licensing – Collection Agency Board Complaint Process.
HB 2031 and HB 4097: Marine Seawater Desalination Rulemaking Trade Fair / May 2016 Office of Water Water Availability Division Water Quality Division.
Water Quality/Stormwater Seminar September House Bill 2031 Requires TCEQ to adopt an expedited permitting process for discharge permits for treated.
Panel on Challenges and Opportunities of Treatment, Beneficial Use and Management of CBM Produced Water The Regulatory Environment John A. Veil Argonne.
AGENCY ROLES Level 1B: Advanced Fundamentals July 2016 LOCAL, STATE, FEDERAL 1.
Climate: ANPR, SIPs and Section 821 WESTAR October 2, 2008.
Final Rulemaking: 25 Pa. Code Chapters 121 and 139 Measurement and Reporting of Condensable Particulate Matter Emissions Environmental Quality Board Meeting.
Office of the State Fire Marshal Pipeline Safety Division
Evan Kane, DWR Ken Pickle, DEMLR Jon RisGAARD, DWR
Compliance and Enforcement Presentation to Industrial Association of Contra Costa County February 22, 2017 Paul Grazzini, Air Quality Specialist Bay.
Environmental Protection Agency
Compliance Monitoring Activities State Inspections
Single Event Violations
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
EPA Region IV and ADEM NPDES Permit Coordination
Managing urban watersheds
Energy & Materials Flow & Cost Tracker (EMFACT)
Presentation transcript:

Staying on Top of Permits & Public Comments Public Comments Policy Track: Sunday, February 28, :30 pm

1.Alabama Department of Environmental Management (ADEM) List90 list: 2.Alabama Surface mining Commission (ASMC) list: 3.Local newspaper legal classifieds 4.Municipal government 5.County government 7. Environmental Protection Agency (EPA) list: 8. U.S. Army Corps of Engineers (USACE) list: Include the following information in your Name, address, Mailing address, Phone #, Agency Name (If applicable) 9.U.S. Fish & Wildlife Service (USFWS) Public Notice list: 10. Regulations.gov Federal Register Permit & Public Comment Resources

eFile Enforcement Notices Public Notices & Permits Permit Applications Permit Wizard Alabama Environmental Regulations & Laws Water Quality Public Participation in the ADEM Rulemaking & Permitting Process Public Hearings & Meetings

Region IV Water Discharge Permits (PCS) Enforcement & Compliance History Online (ECHO) Envirofacts Data Warehouse Surf Your Watershed EPA

Alabama Ecological Services Field Office (Daphne) Daphne Special Agent Montgomery Special Agent USFWS

Mobile District Planning & Environmental Regulatory Program Public Notices USACE

Fish Consumption Advisories

Persons wishing to comment may do so, in writing, to the Department's named contact above within 30 days following the publication date of this notice. COMMENTERS SHOULD IDENTIFY THE APPROPRIATE NPDES NUMBER ON THE FIRST PAGE OF THEIR COMMENTS. In order to affect final decisions, comments must offer technically substantial information that is applicable to the proposed permit. A written request for a public hearing may also be filed within that 30-day period and must state the nature of the issues proposed to be raised in the hearing. The Director shall hold a public hearing whenever it is found, on the basis of hearing requests, that there exists a significant degree of public interest in the permit application or draft permit. The Director may also hold a hearing if he determines that it would clarify one or more issues involved in the permit decision. After consideration of all written comments, review of any public hearing record, and consideration of the requirements of the Alabama Water Pollution Control Act, the Federal Water Pollution Control Act and applicable regulations, the Department will make a final determination. The Department will develop a response to comments, which will become part of the public record and will be available to persons upon request. Notice will be sent to any person requesting notice of the final action. Russell A. Kelly, Chief Permits and Services Division ADEM PO Box Montgomery, AL (334) ADEM Public Comment Guidelines

File Review Instructions: ADEM eFile Open your internet browser and navigate to On the search page put a check mark in the box for “Water” next to the heading “Media Area” In the box next to the heading “Permit Number” type in the permit number of a facility as it is given to you Leave all of the other search options blank and click on “Search” at the bottom of the page

File Review Instructions: Getting Started After you click “Search” the eFile server will display the files that ADEM has made available to the public at the bottom of the page, with up to 10 search results listed per page Depending on the size, importance, and age of the facility, there might be only one or two pages (10 to 20 documents) of search results, or there might be up to around 20 pages (200 documents) The documents will be listed with several columns giving the Facility Name, Permit Number, Date of the Document, Type of Document, and File Name To view a particular document, simply click the link to “Download” it in the left column of the search results

File Review Basics: What Are the Different Types of Documents? Discharge Monitoring Reports (DMR) – Self-generated reports detailing the concentrations and quantities of pollutants in the discharges from the facility Inspection Reports (IR) – Reports generated by ADEM after an inspection will often indicate if there are any problems with the facilities operations or discharges Toxicity Reports (TOX) – Analyses of samples taken by the facility to determine if their discharges have the potential to kill or disrupt the life-cycles of fish

File Review Basics: What Are the Different Types of Facilities/Permits? Individual Permits Municipal – Water/Waste Water Treatment Plants and Lagoons Industrial Mining – Quarries/Coal Mines General Permits* – Usually smaller industrial facilities that fit within a certain category and do not need individual coverage State Indirect Discharge (SID) Permits – Permit to discharge to municipal waste water collection system, rather to surface water Underground Injection Control (UIC) Permits – Permit to inject water into the ground via well, instead of to surface water

ADEM Records Review Azure D. Jones ADEM Permits & Services (334) ARA River Protection Essential – How to Check a Company’s Pollution Record adem-file-review-brochure

Grassroots Water Advocacy Resources Alabama Rivers Alliance River Network American Rivers Clean Water Network

Nelson Brooke (205)