Central Valley Flood Protection Board Meeting – Agenda Item No. 10A APPLICATION NOS. 18793-2 and 18793-3.

Slides:



Advertisements
Similar presentations
18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
Advertisements

BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
Sacramento Local Agency Formation Commission (LAFCo) ANALYSIS OF PROPOSED SMUD SPHERE OF INFLUENCE AND ANNEXATION Presented by Chris Tooker Friday, October.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7A APPLICATION NO
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Sacramento District Regional Vegetation Variance Paige Caldwell, P.E. Emergency Manager.
TRLIA Certification of Environmental Impact Report and Selection of Project for Feather River TRLIA Board Meeting: February 6, 2007 Briefer: Paul Brunner,
Central Valley Flood Protection Board Meeting – Agenda Item No. 13B.
SUTTER BUTTE FLOOD CONTROL AGENCY Supplemental Presentation on Variances and Encroachments Feather River West Levee Project Project Area C May 24, 2013.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Agenda Item 9 Sutter Bypass CVFPB Meeting April 17, 2009.
City Council Meeting January 18, Background  Staff receiving increasing number of inquiries regarding installation of wireless telecommunications.
Seattle District Seattle District U. S. Army Corps of Engineers U. S. Army Corps of Engineers.
Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.
US Army Corps of Engineers BUILDING STRONG ® USACE Status: Metro East Levees September 21, 2011.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
An Appeal of a Request For a Special Use Authorization For a Solar Energy Power Plant Docket SUA Appeal of Rainbow Solar Facility.
Central Valley Flood Protection Board Meeting – Agenda Item No. 11 DESIGNATED FLOODWAY MODIFICATION.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Britannia Village Flood Control System Information Meeting for Directly Affected Landowners February 5, 2009.
Central Valley Flood Protection Board Meeting – Agenda Item No. 4E APPLICATION NO
City of New Brighton Planning Commission Meeting October 18, 2005 Agenda Item: 6A (Public Hearing) Special Use Permit for Detached Garage Exceeding 624.
Sacramento Local Agency Formation Commission (LAFCo) UPDATE ON PROPOSED SMUD ANNEXATION Presented to Yolo LAFCo September 19, 2005.
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Shoreline & Waterway Management Section Regulations Governing Beach Protection and the Use of Beaches December 27, 1983 Beach – is that area which extends.
Board of County Commissioners PUBLIC HEARING September 1, 2009.
A 1,240 Acre Master Development Plan Proposal, West of Willcox, AZ. Cochise County Board of Supervisors August 23, 2011 Docket MDP / Z
August 28, 2015 Meeting of the Central Valley Flood Protection Board Dave Wheeldon, Chief Flood System Sustainability Branch FMO, Division of Flood Management.
Board of County Commissioners PUBLIC HEARING January 11, 2011.
MORRIS MILL PROPOSED URBAN SERVICES DISTRICT Presentation to County Council September 17, 2013.
1 Three Rivers Levee Improvement Authority Follow-up on Twelve Compliance Issues Raised on February 26, 2007 March 22, 2007.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Prepared by: Burnham – Floodplain Study October 23, 2009 Presented by: Marty Spongberg, PhD, PE, PG AMEC Geomatrix, Inc.
DWR Maintenance Area Response to USACE Periodic Inspections Presented by: Noel Lerner, Chief, Flood Maintenance Office Mark List, Chief, Maintenance Support.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
05C112011B Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master – Update Tracking.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Yuba County Comprehensive Flood Protection Program
Presented to: Central Valley Flood Protection Board August 23, 2013 Sacramento Area Levee Accreditation Key Results from Encroachment Analysis.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Tracey Ferguson Project Manager, Integrated Water Resources ATKINS.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7D Methylmercury Open Water Workplan.
Central Valley Flood Protection Board Meeting – Agenda Item No. 8A Informational Briefing Presented By Board Staff and CH2MHill Consultants Model Funded.
CDP Morehart 2808 Lafayette Avenue Newport Beach.
Central Valley Flood Protection Board Meeting – Enforcement Report 1.
2 West Sacramento, California Project General Reevaluation Report Letter of Support for the West Sacramento General Reevaluation Report Agenda Item 4G:
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)
Central Valley Flood Protection Board Meeting – Agenda Item No. 7C.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
Applicant:Derek and Erica Hokkanen Site Address: th Street Property #s: A Computer #s: Location:Section 33, T30N, R16W,
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
AGENDA ITEM: DATE: PROJECT: APPLICANT: PRESENTOR: AGENDA ITEM: DATE: PROJECT: APPLICANT: PRESENTOR: 9.01CA3-05 January 17, 2006 City-initiated Code Amendment.
City of Stockton Levee Flood Protection Status Report January 29, 2008 Agenda Item 4.03.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Water Efficiency Ordinance ZCA No. 750
Washoe County Board of Adjustment
Central Valley Flood Protection Plan Senate Bill 5 Amendments
Feather River West Levee Project Project Area C May 24, 2013
Regulation Amendment AM April 3, 2018.
City Council Meeting November 14, 2016
Sacramento Environmental Commission January 2019.
Presentation transcript:

Central Valley Flood Protection Board Meeting – Agenda Item No. 10A APPLICATION NOS and

Central Valley Flood Protection Board Meeting – Agenda Item No. 10A Consider approval of Permit No (Project Area B) to: construct approximately 6.1 miles of levee improvements on the west levee of the Feather River (Reaches 7 through 12) from Station to , including the following proposed work:  degrading of the levee by approximately one third of its overall height;  construction of a cutoff wall (47 to 78 feet in depth) along the levee centerline;  reconstruction of the levee;  installation of 28 new relief wells between Station and ;  reconstruction of approximately 3,100 linear-feet of an existing concrete relief well drainage ditch;  construction of an additional 2,500 linear-feet of new concrete relief well drainage ditch;  and correction of various encroachments which do not comply with California Code of Regulations, Title 23 2

Central Valley Flood Protection Board Meeting – Agenda Item No. 10A And Consider approval of Permit No (Project Area D) to: construct approximately 11.4 miles of levee improvements on the west levee of the Feather River (reaches 29 through 41) from Station to , including the following proposed work:  degrading of the levee by approximately one third of its overall height;  construction of a cutoff wall (17 to 99 feet in depth) along the levee centerline;  reconstruction of the levee;  construction of seepage berms from 100 to 170 feet in width;  and correction of various encroachments which do not comply with California Code of Regulations, Title 23 3

Central Valley Flood Protection Board Meeting – Agenda Item No. 10A California Code of Regulations, Title 23, Division 1 (Title 23)  § 6 – Need for a Permit  § 11 – Variances  § 12 – Protests  § 13 – Evidentiary Hearings  § 108 – Existing Encroachments  § 112 – Streams Regulated and Nonpermissible Work Periods  § 116 – Borrow and Excavation  § 120 – Levees  § 121 – Erosion Control  § 123 – Pipelines, Conduits, and Utility Lines  § 124 – Abandonment of Pipelines  § 128 – Bridges  § 130 – Patrol Roads and Access Ramps California Water Code, Division 5, Part 4, Chapters 3 and 4 Rivers and Harbors Act of 1899, Title 33, § 408 (Section 408) 4

Central Valley Flood Protection Board Meeting – Agenda Item No. 10A The FRWLP extends from:  Thermalito Afterbay downstream 41 miles to a point 3.5 miles north of the Feather River’s Confluence with the Sutter Bypass Project Area B (approx. 6.1 miles) south of Yuba City  from Shanghai Bend to Star Bend, in Sutter County Project Area D (approx miles)  from Gridley upstream to the Thermalito Afterbay, in Butte County FRWLP Thermalito Afterbay 3.5 miles north confluence Project Area B Yuba City Project Area D Gridley Previously permitted Project Area C ( ) 5

Central Valley Flood Protection Board Meeting – Agenda Item No. 10A Project Area B  U.S. Army Corps of Engineers (USACE) Washington DC headquarters Section 408 Record of Decision (ROD) – September 13, 2013 (Exhibit A)  USACE Sacramento District Letter of Permission (LOP) – anticipated late February (Exhibit B)  LD 1 Endorsement (Exhibit C) Project Area D  USACE Washington DC headquarters Section 408 ROD – September 13, 2013 (Exhibit A)  USACE Sacramento District LOP – anticipated late February (Exhibit B)  MA 7 Endorsement (Exhibit C) 6

Central Valley Flood Protection Board Meeting – Agenda Item No. 10A  Levee performance problems have included such issues as: through- and under-seepage, landside and waterside instability, and erosion  SBFCA was formed as a JPA in 2007  SBFCA’s project goals are to achieve a minimum 200-year level of flood protection for urban and urbanizing areas within the Sutter Basin  October 30, 2012 – Board sent a letter to USACE requesting Section 408 approval  May 24, 2013 – Board conditionally approved Permit No (Project Area C)  July 19, 2013 – ROD for Project Area C (Reach 13 only) issued  July 22, 2013 – LOP for Project Area C (Reach 13 only) issued  July 23, 2013 – Board Permit for Project Area C (Reach 13 only) issued  September 13, 2013 – ROD for the remaining reaches of the FRWLP issued  September 19, 2013 – LOP for the remaining reaches of Project Area C issued  September 27, 2013 – Amended Permit for Project Area C approved and issued by Board to authorize construction of the entire Project Area C (Reaches 13 through 24) and authorize a Project Design Change for construction field conditions  Oct – Dec 2013 – Permit applications for Areas B ( ) and D ( ) and 90% and 100 % plans and specifications received by Board staff 7

Central Valley Flood Protection Board Meeting – Agenda Item No. 10A The proposed projects are expected to provide the following benefits:  Address major geotechnical concerns such as through- and under-seepage, slope stability, and the condition and impact of existing encroachments  Reduce the risk of flooding for existing urban areas, agricultural commodities, infrastructure, and other properties  Increase the level of flood protection to a targeted 200-year level, which is consistent with the adopted CVFPP and pursuant to the legislative mandates of the Central Valley Flood Protection Act of 2008 (Water Code §§ 9600 – 9625), for the City of Yuba City (Project Areas B and D) and the cities of Biggs, Gridley, and Live Oak (Project Area D)  Bring existing encroachments surveyed by SBFCA into compliance with Title 23, while addressing 100 percent of the encroachment issues categorized by the USACE in their 2010 periodic inspections as “Unacceptable – likely to prevent performance in the next flood event” 8

Central Valley Flood Protection Board Meeting – Agenda Item No. 10A Board staff has reviewed the following technical documents provided by SBFCA:  90 % plans and specifications  Permit Application Packages (October 2013)  100 % plans and specifications Note: Any subsequent plans and specifications or addenda shall be handled in a manner consistent with Special Conditions FORTY-TWO and FORTY-THREE Project Area B ( ) Project Area D ( ) 9

Central Valley Flood Protection Board Meeting – Agenda Item No. 10A Overall FRWLP Project Area B ( )Project Area D ( ) Hydraulic Summary for the FRWLP:  Included the entire FRWLP (44 miles from Thermalito Afterbay to Sutter Bypass)  Designed to achieve 200-yr level of protection (urban/urbanizing)  Designed to achieve 100-yr level of protection from Star Bend south of Yuba City  Modeled using HEC-RAS one-dimensional model  Flows used: 150,000 cfs (100-yr); 174,000 cfs (200-yr); 327,000 cfs (500-yr)  1957 Profile flows of 210,000 cfs (above Yuba River) and 300,000 cfs (below Yuba River)  Both 100- and 200-yr events plus 3-ft of freeboard are below the existing levee crown  Based on SBFCA’s results, staff expects no adverse hydraulic impacts 10

Central Valley Flood Protection Board Meeting – Agenda Item No. 10A Project Area B  Divided into 5 Reaches (7 – 12)  Predominant deficiencies are through- and under seepage  Approximately 6 miles of cutoff wall  Depths vary from 47 to 78 feet  28 relief wells (southern Reach 7) NOTE: Variances discussed on next slide Project Area D  Divided into 13 Reaches (29 – 41)  Predominant deficiencies are through- and under seepage  Approximately 9 miles of cutoff wall  Depths vary from 17 to 99 feet  Approximately 0.93 miles of seepage berm  From 100 to 170 feet wide landside berm (Reaches 38, 40, 41) Levee Deficiencies and Remediation by Reach 11

Central Valley Flood Protection Board Meeting – Agenda Item No. 10A  Pursuant to Title 23, § 11(a) and (b) – the Board may grant variances to its standards for non consistent uses, and the applicant must state why the project is infeasible or not appropriate  SBFCA submitted a Variance Request Package outlining their request for variances to Title 23 on grounds that the standards are infeasible due to specific project constraints  SBFCA has requested variances to Title 23, § 108, 120, and 123 (B and D) and 112 (D), as outlined in the Staff Report Section 7.7 and Attachment H  Board staff has added or modified Special Conditions TWENTY-SIX, FIFTY-FIVE, SIXTY, SIXTY-ONE, SIXTY-TWO, SIXTY-THREE, SIXTY-SEVEN, SEVENTY-TWO, and EIGHTY-TWO to incorporate the variances into the permit  Board staff has also added Special Condition NINETY-THREE to require post construction monitoring to assess levee performance  Board staff has determined that the project will result in an improved levee system, ensure continuity with Project Area C, and is not expected to pose a threat to stability 12

Central Valley Flood Protection Board Meeting – Agenda Item No. 10A Advance Elderberry Transplant Authorization:  On January 16, 2014 the Board’s Chief Engineer authorized relocation of elderberry shrubs from 49 locations throughout Project Areas B, C, and D  Required prior to construction because of restrictive planting windows  Incorporated into both permits through Special Condition SEVENTY-THREE Utility Relocations:  There will be several utility relocations that will require separate encroachment permits or Board Chief Engineer authorizations (Attachment J)  SBFCA will assist the utilities to prepare and submit encroachment permit applications and will coordinate relocation with the levee construction schedule 13

Central Valley Flood Protection Board Meeting – Agenda Item No. 10A Four protest letters have been received:  All letters protest the need to acquire private property for project right of way Project Area B  Ms. McFeely, received January 27, 2014 (0.48 acres fee, 0.19 acres easement) Project Area D  Mr. Peekema, received February 3, 2014 (2.0 acres fee, 0.23 acres easement*)  Mr. Fredericks, received February 11, 2014 (1.0 acres fee, 0.27 acres easement*)  Mr. Manning, received February 11, 2014 (2.0 acres fee, 0.8 acres easement*) Staff’s findings:  All protests were submitted pursuant to Title 23, § 12, Protests  Board staff determined that the protests were not of a flood control nature  Special Condition EIGHTEEN of both permits require SBFCA to acquire the proposed lands prior to construction in that area  Board staff agrees with the need to acquire the proposed land (in fee or easement) to ensure successful project completion 14

Central Valley Flood Protection Board Meeting – Agenda Item No. 10A  The CEQA Analysis is included in Staff Report Section 8.0  References the approved CEQA Findings made in May 2013 (Project Area C)  The Water Code § Considerations are included in Resolution

Central Valley Flood Protection Board Meeting – Agenda Item No. 10A Board staff is recommending the following changes to the Special Conditions below:  SEVENTY-TWO: the changes are for consistency within the condition and to reflect that potholing may not be required  EIGHTY-NINE: the changes are to properly reference the title of the O&M Manual and to properly reflect responsibility of project works excluding the work done under separate permits to bring encroachments into compliance with standards 16

Central Valley Flood Protection Board Meeting – Agenda Item No. 10A Board Staff is Recommending that the Board: Adopt (in substantially the form provided):  the CEQA findings and Resolution Approve:  the requested construction variances to Title 23, § 108, 120, and 123 (Project Areas B and D) and § 112 (Project Area D only) pursuant to § 11(a) and (b) summarized in Section 7.7, and further detailed in Attachment H, of the submitted staff report;  Draft Flood System Improvement Permit No , conditioned on receipt of Section 408 Letter of Permission from the USACE Sacramento District (in substantially the form provided including the changes recommended today); and  Draft Flood System Improvement Permit No , conditioned on receipt of Section 408 Letter of Permission from the USACE Sacramento District (in substantially the form provided including the changes recommended today); Delegate:  authority to the Executive Officer to make non-substantive changes to the draft permits as needed to incorporate additional design changes submitted by SBFCA prior to receipt of the Letter of Permission, and that if substantive changes to the draft permit(s) are required, the Board staff will bring the permit(s) back to the Board at a future meeting to seek approval for substantive changes 17

Central Valley Flood Protection Board Meeting – Agenda Item No. 10A Direct the Executive Officer:  to take the necessary actions to prepare and execute Permit Nos and and all related documents;  to prepare and file a Notice of Determination pursuant to CEQA with the State Clearinghouse;  to process applications to amend existing or request new encroachment permits to owners of utilities within the project areas that will be reconstructed as part of the projects, as detailed in Staff Report Sections 7.7 and 7.10; and  that if, during construction, additional non-conforming encroachments or constructability issues are discovered by any party SBFCA will consider whether or not they can be brought into compliance during construction. Board staff will evaluate subsequent proposals for Board approval to be made either by direct Board action or by delegation to the Executive Officer as appropriate; and  authorize any additional utility relocations and / or elderberry shrub transplants deemed necessary for the project. 18

Central Valley Flood Protection Board Meeting – Agenda Item No. 10A 19 Presented/prep/reviewed:Nancy C. Moricz, P.E. – Senior Engineer