5/17/2000Summer Preparedness 20001. 5/17/2000Summer Preparedness 20002 SRP SUMMER PREPAREDNESS 2000 Presented to the Arizona Corporation Commission May.

Slides:



Advertisements
Similar presentations
In the Post 06 Environment November 9, 2006 Jim Eber Demand Response.
Advertisements

Market Interface Committee Recent Regulatory Activities Philip Tice October 14, 2011.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Goshen Area Bus Reconfiguration
2013 Summer Overview Jeffrey S McDonald Power System Operator CUEA San Diego, CA June 6, 2013.
 2005 Pinnacle West Capital Corporation Palo Verde Hub Participant Meeting May 27, 2005 Arizona Public Service Company Tom Glock – Manager Power Operations.
Special Open Meeting of the Arizona Corporation Commission Energy Workshop February 16, 2001 Arizona Public Service Company Cary B. Deise Director, Transmission.
2/16/2001ACC Energy Workshop – Summer Preparedness 2001 and SS-1 SRP Summer Preparedness 2001 and 2002 Presented to the Arizona Corporation.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
Midwest Energy, Inc. Transmission Planning and Expansion
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
Enhancing Interruptible Rates Through MISO Demand Response: WIEG Annual Meeting June 19, 2008 Presented by: Kavita Maini, Principal KM Energy Consulting,
R Southwest Gas Corporation February 16, 2001 Southwest Gas Corporation Update on Factors Affecting Gas Prices n Storage u Storage levels continue below.
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Houston Area Dynamic Reactive Project March 11,
Charles Hosken, General Manager Imperial Irrigation District
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
1 Impact of the 2004 Hurricanes Hurricane Charley Landfall on August 13 th Customers affected Poles replaced Transformers replaced Miles of wire replaced.
Cost of Service Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
SDG&E Summer Preparedness July 2012 Update © 2012 San Diego Gas & Electric Company. All copyright and trademark rights reserved. 1.
 2005 Pinnacle West Capital Corporation Special Open Meeting of the Arizona Corporation Commission 2005 Summer Assessment March 18, 2005 Arizona Public.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
January 2009 SEMO Ice Storm Extreme Measures IEEE-PES St Louis Chapter Meeting June 18, 2010 Presented by David Wakeman Vice President, Energy Delivery.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
Western Area Power Administration Summer Status Arizona Corporation Commission Special Open Meeting May 17, 2000.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Arizona Corporation Commission Energy Workshop February 16, 2001.
03/22/07 ACC Open MeetingSummer Preparedness SRP Summer Preparedness 2007 Mike Hummel Manager – Supply & Trading and Gary Harper Manager - System.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
Utility Engineers, PC.  Generation  Transmission  Distribution.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
Operations Report Kent Saathoff System Operations ERCOT.
OPSI Annual Meeting October 13, Session 6 Reliability Pricing Model: Are Further Changes Necessary? Reluctantly…yes But States should also be.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Tampaelectric.com Presented to the Florida Public Service Commission May 1, 2008 Tampa Electric Company 2008 Hurricane Season Preparation Regan Haines.
2008 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 1, 2008.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
Arizona Extreme Contingency Analysis 2009 & th BTA Presentation Jonathan Stahlhut, Ph.D. Transmission Planning Engineer, APS May 22-23, 2008.
Maryland Public Service Commission 2006 Summer Reliability Status Conference May 16, 2006 Baltimore, MD.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Florida Keys Electric Cooperative Association, Inc. Storm Hardening Florida Public Service Commission May 1, 2008 Scott Newberry, CEO John Stuart, COO.
Maryland Public Service Commission 2005 Summer Reliability Status Conference May 9, 2005 Baltimore, MD.
May 4, 2001 Maryland PSC Summer Reliability Assessment Allegheny Power May 4, 2001.
Modeling DER in Transmission Planning CAISO Experience
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
DEC System Voltage Planning - June 2018
Pacific Power Seismic Preparedness Update
Mid-Continent Area Power Pool
City of Lebanon, Missouri Electric Department
Nordic Winter Power Balance
2007 Hurricane Season Preparedness Briefing
Palo Verde-COI RAS Retirement
Palo Verde-COI RAS Retirement
Presentation transcript:

5/17/2000Summer Preparedness 20001

5/17/2000Summer Preparedness SRP SUMMER PREPAREDNESS 2000 Presented to the Arizona Corporation Commission May 17, 2000

5/17/2000Summer Preparedness Dave Areghini Associate General Manager, Power, Construction and Engineering Services

5/17/2000Summer Preparedness AGENDA b Summary of Year 2000 Projected Conditions and SRP Generating Plant Readiness b Resources and Reserves b SRP Transmission and Distribution System Readiness b Emergency Operations and Load Shedding

5/17/2000Summer Preparedness SUMMARY OF YEAR 2000 PROJECTED CONDITIONS b Transmission is adequate to meet the forecasted peak load and reserves b SRP generation is ready and purchases are adequate to meet the forecasted year 2000 demand b Emergency plans are in place to handle contingency events

5/17/2000Summer Preparedness John Coggins Manager Supply and Trading

5/17/2000Summer Preparedness OPERATING RESERVES b Protect Against Loss of Generation or Transmission Resources Used to Deliver Energy to Firm Load b Targeted Reserve Levels Based on: Amount of Firm LoadAmount of Firm Load Largest Single HazardLargest Single Hazard

5/17/2000Summer Preparedness SUMMER 2000 RESERVES Jun JulAugSep Load (MW) Actual Reserves* Reserves Inside Valley Outside Valley * Meets WSCC and NERC Criteria Meets Southwest Reserve Sharing Group Criteria Meets Southwest Reserve Sharing Group Criteria

5/17/2000Summer Preparedness WW LB KY/SK MD NV PP FC/CR/HY CO SRP Distribution Territory Valley Reserves 209 MW Available Import Capability 0 MW ALL UNITS ON LINE - JULY PV Outside Valley Reserves 427 MW

5/17/2000Summer Preparedness RESULT Peak Load Day (5084 MW) in July b Outside Valley Recovery –Full Recovery From Loss of Largest Generating Unit and and –Full Recovery From Loss of Unit Less Than 245 MW b Inside Valley Recovery –Full Recovery From Loss of Largest Generating Unit and and –Full Recovery From Loss of Unit Less Than 28 MW

5/17/2000Summer Preparedness COORDINATING VALLEY UNIT COMMITMENT APSMerchantSRPMerchant SRPCAOAPSCAO

5/17/2000Summer Preparedness GLEN CANYON LOW FLOW TESTING b Test Flows Implemented May - September Result of 1994 Biological Opinion by USF&WSResult of 1994 Biological Opinion by USF&WS Requires Low Steady Flow At 8,000 cfs June - SeptRequires Low Steady Flow At 8,000 cfs June - Sept b Reduces Plant Output by Several Hundred MW Impacts Market Pricing in the SWImpacts Market Pricing in the SW Impacts Exchange Arrangements with SRPImpacts Exchange Arrangements with SRP

5/17/2000Summer Preparedness GLEN CANYON LOW FLOW TESTING b Emergency Exception Criteria In Effect Activation Requires System Wide EmergencyActivation Requires System Wide Emergency b Testing May Be Abandoned Due to Hydrology

5/17/2000Summer Preparedness SRP TRANSMISSION AND DISTRIBUTION SYSTEM READINESS Dave Areghini

5/17/2000Summer Preparedness SYSTEM IMPROVEMENTS b Items Increasing Import Capability Knox 230kV receiving station andKnox 230kV receiving station and 1-230/69 transformer Four 46 MVAR 69kV capacitor banks at Brandow,Four 46 MVAR 69kV capacitor banks at Brandow, Papago Buttes, White Tanks and Knox REKONDZI: Most of the items you have listed help the subtransmission system but I believe only Item 1 (Knox xfmr) & Item 2 (69kV caps) help the transmission system. The 69kV capacitors are the main reason the lower portion of the load serving nomogram has increased from last year. Item 4, SI/GF monitor did not provide any increase in capacity like the WW/AF monitor did. There are some significant maintenance replacement items, relay improvements, WSCC uniform off frequency load shedding, and 500/ /69 Transformer re-ratings that also contribute to increased load serving capability REKONDZI: Most of the items you have listed help the subtransmission system but I believe only Item 1 (Knox xfmr) & Item 2 (69kV caps) help the transmission system. The 69kV capacitors are the main reason the lower portion of the load serving nomogram has increased from last year. Item 4, SI/GF monitor did not provide any increase in capacity like the WW/AF monitor did. There are some significant maintenance replacement items, relay improvements, WSCC uniform off frequency load shedding, and 500/ /69 Transformer re-ratings that also contribute to increased load serving capability

5/17/2000Summer Preparedness SYSTEM IMPROVEMENTS b Items Serving Increasing Distribution Load 2 nd Ward 230/69kV transformer2 nd Ward 230/69kV transformer Multiple line upgradesMultiple line upgrades REKONDZI: Most of the items you have listed help the subtransmission system but I believe only Item 1 (Knox xfmr) & Item 2 (69kV caps) help the transmission system. The 69kV capacitors are the main reason the lower portion of the load serving nomogram has increased from last year. Item 4, SI/GF monitor did not provide any increase in capacity like the WW/AF monitor did. There are some significant maintenance replacement items, relay improvements, WSCC uniform off frequency load shedding, and 500/ /69 Transformer re-ratings that also contribute to increased load serving capability REKONDZI: Most of the items you have listed help the subtransmission system but I believe only Item 1 (Knox xfmr) & Item 2 (69kV caps) help the transmission system. The 69kV capacitors are the main reason the lower portion of the load serving nomogram has increased from last year. Item 4, SI/GF monitor did not provide any increase in capacity like the WW/AF monitor did. There are some significant maintenance replacement items, relay improvements, WSCC uniform off frequency load shedding, and 500/ /69 Transformer re-ratings that also contribute to increased load serving capability

5/17/2000Summer Preparedness Load Serving Capacity N-0 Continuous & Emergency Limit 5339 MW N-1 Continuous & Emergency Limit 5229 MW Forecasted Base Peak 4970 MW Forecasted Upper Peak 5084 MW

5/17/2000Summer Preparedness SYSTEM PREPARATION Major Line PatrolsMajor Line Patrols Preventative MaintenancePreventative Maintenance Pole WorkPole Work Personnel TrainingPersonnel Training Tree Trimming Cable Replacement Storm Plan Summer Substation and Line Maintenance Complete

5/17/2000Summer Preparedness EMERGENCY OPERATIONS AND LOAD SHEDDING b System Normal b Capacity Critical b Capacity Emergency b Pre-load Shedding b Rotating Blackouts

5/17/2000Summer Preparedness CAPACITY CRITICAL b Potential for Operating Reserve Deficiency if a Major Resource is Lost b Warning Issued to All Plants

5/17/2000Summer Preparedness CAPACITY EMERGENCY b Potential for loss of load if a major resource is lost (reserves are depleted) b Staff unmanned hydro units b Stop maintenance that could jeopardize unit availability

5/17/2000Summer Preparedness CAPACITY EMERGENCY b Prepare to: Cut wholesale salesCut wholesale sales Utilize emergency generation, reduce auxiliary loadsUtilize emergency generation, reduce auxiliary loads

5/17/2000Summer Preparedness ROTATING BLACKOUTS b Predetermined program has already protected critical loads such as hospitals b Load shedding program curtails delivery of power to retail customers

5/17/2000Summer Preparedness

5/17/2000Summer Preparedness SUMMARY OF YEAR 2000 PROJECTED CONDITIONS b Transmission is adequate to meet the forecasted peak load and reserves b SRP generation is ready and purchases are adequate to meet the forecasted year 2000 demand b Emergency plans are in place to handle contingency events

5/17/2000Summer Preparedness

5/17/2000Summer Preparedness

5/17/2000Summer Preparedness