Electron Cooling in the Recycler Ring Alexander Shemyakin (Fermilab/AD) May 31, 2005.

Slides:



Advertisements
Similar presentations
Ultimate performance of relativistic electron cooling at Fermilab A. Shemyakin and L. R. Prost (Fermilab) September 15, 2011 COOL’11 A eulogy (from εὐλογία,
Advertisements

Ribbon Electron Beam Profile Monitor For Bunched Beam Tomography Muons, Inc. Innovation in research.
1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Cooling Accelerator Beams Eduard Pozdeyev Collider-Accelerator Department.
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
ALPHA Storage Ring Indiana University Xiaoying Pang.
High Energy Electron Cooling D. Reistad The Svedberg Laboratory Uppsala University.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
COULOMB ’05 Experiments with Cooled Beams at COSY A.Lehrach, H.J.Stein, J. Dietrich, H.Stockhorst, R.Maier, D.Prasuhn, V.Kamerdjiev, COSY, Juelich, I.Meshkov,
Status of High Energy Electron Cooling at FNAL’s Recycler Ring XX th Russian Conference on Charged Particle Accelerators September 13 th, 2006 L. Prost,
March 2011Particle and Nuclear Physics,1 Experimental tools accelerators particle interactions with matter detectors.
Fermilab DC Cooler Experiences Lionel Prost MEIC Collaboration Meeting Spring 2015 (Topics: Ion Beam Formation and Cooling) 30 March 2015.
HESR 2 Electron Cooling Björn Gålnander The Svedberg Laboratory Uppsala University Midterm Review, DIRACsecondary-Beams December 8, 2006 GSI, Darmstadt.
FFAG-ERIT Accelerator (NEDO project) 17/04/07 Kota Okabe (Fukui Univ.) for FFAG-DDS group.
Electron cooling of 8 GeV antiprotons at Fermilab’s Recycler: Results and operational implications June 5 th, 2006 L. Prost, Recycler Dpt. personnel Fermi.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Eric Prebys, FNAL. USPAS, Knoxville, TN, January 20-31, 2014 Lecture 20 - Cooling 2 Anti-protons are created by hitting a target with an energetic proton.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Thursday 21/4 07:30: End of fill #1727. Beam dumped. ALICE compensator magnet fault. Delivered ~6.7 pb -1 in 7.5 h. 11:30 Stable beam # bunches/beam.
Electron cooling at the Recycler: Update and Cooling force characterization October 19 th, 2006 L. Prost, Recycler Dpt. personnel Fermi National Accelerator.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
MEIC Staged Cooling Scheme and Simulation Studies He Zhang MEIC Collaboration Meeting, 10/06/2015.
Alexei Fedotov, 02/02/12 1 Potentials for luminosity improvement for low-energy RHIC (with electron cooling) February 2, 2012.
Overview of Electron Cooling Activities at FNAL Thomas Kroc Fermilab – Electron Cooling EIC 2004 March 15-17, 2004 Jefferson Lab.
HV Electron Cooling System for NICA Collider
ERHIC design status V.Ptitsyn for the eRHIC design team.
FLAIR meeting, GSI March Positron Ring for Antihydrogen Production A.Sidorin for LEPTA collaboration JINR, Dubna.
M. Steck, RUPAC 2006, Novosibirsk Cooling of Rare Isotope Beams in the ESR Cooling by: Stochastic cooling (pre-cooling) Electron cooling (final cooling)
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
Module 5 A quick overview of beam dynamics in linear accelerators
Progress of Electron Cooling at the Recycler January 26 th, 2006 L. Prost, Recycler Dpt. personnel f Fermi National Accelerator Laboratory.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Lab. Director’s Meeting IHEP, Protvino, Russia, January 2008 D. Reistad, The Svedberg Laboratory, Uppsala University.
Cooling of Hadrons at Relativistic Energies: Performance of FNAL’s Recycler Electron Cooler BNL – Collider-Accelerator Department Accelerator Physics Seminar.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Progress of Bunched Beam Electron Cooling Demo L.J.Mao (IMP), H.Zhang (Jlab) On behalf of colleagues from Jlab, BINP and IMP.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
Mitglied der Helmholtz-Gemeinschaft Automated adjustment of the electron beam line of the 2 MeV Electron Cooler at COSY March 11, 2015 | 17:15 | A.Halama.
International Workshop on Beam Cooling and Related Topics COOL’15 29 September 2015 MPD SPD Transfer channels HV Electron Cooling System for NICA Collider.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Fermilab Electron Cooling System
E-beam scanner experience at FNAL
Calculation of Beam Equilibrium and Luminosities for
HIAF Electron Cooling System &
Simulation of Luminosity Variation
“Electron cooling device in the project NESR (FAIR)"
Large Booster and Collider Ring
Task E - A0 and related activities
Task E - A0 and related activities
Status of the VEPP-2000 Collider Project at Novosibirsk
ERL accelerator review. Parameters for a Compton source
K. Tilley, ISIS, Rutherford Appleton Laboratory, UK Introduction
Advanced Research Electron Accelerator Laboratory
MEBT1&2 design study for C-ADS
MEIC New Baseline: Part 10
Update on ERL Cooler Design Studies
Plans for future electron cooling needs PS BD/AC
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

Electron Cooling in the Recycler Ring Alexander Shemyakin (Fermilab/AD) May 31, 2005

Electron Cooling - Shemyakin 2 Tevatron luminosity and antiprotons he Tevatron luminosity is linear with the total number of antiprotons available for the Tevatron store. The Tevatron luminosity is linear with the total number of antiprotons available for the Tevatron store. The antiproton beam quality is characterized by the phase-space density. To achieve higher luminosity this density needs to be increased.

Electron Cooling - Shemyakin 3 Fermilab’s antiproton production chain Inconel target 1108 =11108 =1 Proton beam 7  protons every 1.5 sec 120 GeV Debuncher (stochastic cooling) 61011 = 2108 61011 = 2108 Accumulator (stochastic cooling) 8 GeV 1 TeV Tevatron 150 GeV Main injector 8 GeV Recycler (stochastic and electron cooling) 1108 =3001108 =300 31012 = 3109 31012 = 3109 6   = 2    = 3   10 8  = 1 1  10 8  = 300 Until 2005 Electron cooling in the Recycler Ring eliminates one of the bottlenecks in the long chain of the antiproton production.  is the relative phase-space density

Electron Cooling - Shemyakin 4 Idea of Electron cooling The idea of electron cooling is a heat exchange through Coulomb scattering between hot heavy particles (antiprotons) and cold electrons while the beams are mixed in a cooling section.  Was invented in 1967 by G.I. Budker (INP, Novosibirsk) as a way to increase luminosity of p-p and p-pbar colliders.  First tested in 1974 with 68 MeV protons at NAP-M storage ring at INP (Novosibirsk).  CERN- ICE 1977 – 1979  Fermilab

Electron Cooling - Shemyakin 5 Low energy coolers  Well – established techniques for electron energies below 300 keV.  A strong, continuous longitudinal magnetic field from the gun to the collector  An electrostatic accelerator working in the energy- recovery mode IMP, Lanzhou (China). Example of a 300 keV, 3 A cooler produced by Budker INP for IMP, Lanzhou (China). The voltage difference between the gun and collector ~ 3 kV.

Electron Cooling - Shemyakin 6 Difficulties of implementing at relativistic energies  High electron beam power:  4 MeV * 0.5 A = 2 MW DC!  Beam quality:  The electron beam temperature (in the rest frame) should be comparable with the cathode temperature of 1200K (only a factor of ~10 increase is allowed for the transverse degree of freedom) Design parameters of the RR ECool beam Energy4.34 MeV Beam current0.5 Amps DC Angular spread0.2 mrad Effective energy spread 300 eV

Electron Cooling - Shemyakin 7 History of relativistic electron cooling  Fermilab, 1983: D. Cline et al., “Intermediate energy electron cooling for antiproton sources using a Pelletron accelerator”  For a pulsed electron beam in a Pelletron the beam quality is adequate for electron cooling  Novosibirsk, 1987: successfully tested a prototype 1-MV, 1-A electron beam system.  Continuous magnetic field  Acceleration tubes are not sensitive to vacuum UV  Fermilab, UCLA, NEC, 1989: tested a 2-MV, 0.1-A DC recirculation system with a Pelletron.  Poor stability  Fermilab, IUCF, NEC, 1995: started to work on a 2-MV Pelletron again- beginning of the RR ECool project

Electron Cooling - Shemyakin 8 Premise  Solution for a high-power beam generator: use of a “standard” electrostatic accelerator (Pelletron) and non-standard focusing scheme  Recirculation (energy/charge recovery) scheme  No continuous magnetic field  A low-magnitude longitudinal magnetic field in the cooling section and at the cathode, but a lumped focusing in the remaining part of the beam line  Failure of the previous attempt was recognized to be caused by high losses in the acceleration tubes  Current losses needs to be decreased below 0.01%  New solutions for the gun and collector were found.  A gun with a negatively biased control electrode to suppress the beam halo and provide the beam transport at all currents  Effective suppressing of secondary electrons in the collector can be done by applying a transverse field in the collector cavity

Electron Cooling - Shemyakin 9 GOAL To demonstrate a stable (~1 hour) generation of a 0.2 A relativistic beam using an existing 2 MV Pelletron at NEC Nov. 95:project started Jan. 97:first recirculated current (10 µA) Dec. 97:Max. recirculated current of 0.2 A May. 98:0.2 A for 1 hours at 1.3 MeV Dec. 98:Max. current of 0.7 A Jan. 99:Gun solenoid (200 G) installed Feb. 99: 5 MeV Pelletron ordered May.99:0.9 A with 200 G at the cathode Stage I - Test at NEC (Middleton, WI) How to scale the result for 1.3 MeV beam in a 2-MV tubes to a 4.3 MeV beam in a 5-MV accelerator ?

Electron Cooling - Shemyakin 10 Stage II – short line at WideBand Building (Fermilab)  New means to improve stability: ion stoppers, crash scraper, closing the gun in 1 ms  Diagnostics: BPMs, scrapers, flying wire  Operation was stable only at 3.5 MV. The tubes clearly needed to be extended.  Now the main question was the beam quality. GOAL : To demonstrate a stable generation of a 0.5 A, 4.34 MeV beam in a short beam line Feb 99: 5 MV Pelletron ordered. May 01: First beam of 30  A in the collector. Dec 01: 0.5 A at 3.5 MV Apr 02: NEC replaced acceleration tubes Oct 02: 0.5 A at 4.34 MeV Nov 02: I max = 1.7 A at 3.5 MV Shut down to install the full beamline

Electron Cooling - Shemyakin 11 Stage III – full- length line at WideBand  The beam line was very similar to the final one at MI-31  A novel type of the beam optics, angular momentum –dominated  Developed a technique of precise measurements of the solenoid field quality  Beam envelope measurements with movable orifices  Final version of BPM electronics  Jul first DC beam in the full- scale line  Dec A DC beam  May A beam with required properties in the cooling section

Electron Cooling - Shemyakin 12 Final stage- Cooler in the Recycler  Jun – Jan assembling the cooler in MI- 31/30  Oct magnetic measurements in cooling section  Apr first DC beam in the collector passed through the cooling section

Electron Cooling - Shemyakin 13 Difficulties (some of them) and solutions  Full discharges  Improvements in the protection system (closing the gun in 1  s)  Minimizing current losses to acceleration tubes (dI/I <10 -5 )  Magnetic fields from the Main Injector  Compensation of bus currents, additional shielding  Changes in optics that made the system more tolerable to the beam motion  Field angles  Magnetic field measurements were supplemented by a special tuning procedure employed Beam Position Monitors (BMPs)  Energy matching  Absolute energy calibration of the electron beam by measuring the wave length of the electron rotation in the magnetic field of the cooling section  A special wide energy distribution of antiprotons to observe the first interaction between beams

Electron Cooling - Shemyakin 14 Cooling One of the first indications of interaction between antiprotons and electrons. The plot shows evolution of antiproton energy distribution (log scale) after turning on an electron beam. Initially antiprotons occupy the entire momentum aperture of the Recycler. Beam Density (log Scale) Energy  First interaction - July 9, 2005  First cooling- July 11, 2005  First electron cooling-assisted shot to Tevatron- July 12, 2005

Electron Cooling - Shemyakin 15 Drag Force as a function of the antiproton momentum deviation 100 mA, nominal cooling settings

Electron Cooling - Shemyakin 16 First cooling rate measurements published

Electron Cooling - Shemyakin 17 Electron cooling between transfers/extraction Electron beam is moved ‘in’ Stochastic cooling after injection Electron beam ‘out’ (5 mm offset) Electron beam current 0.1 A/div Transverse emittance 1.5  mm mrad/div Electron beam position 2 mm/div Longitudinal emittance (circle) 25 eVs/div Pbar intensity (circle) 16e10/div ~1 hour 100 mA 195e10 ~60 eVs 254e10

Electron Cooling - Shemyakin 18 Evolution of the number of antiprotons available from the Recycler Mixed mode operation Ecool implementation Recycler only shots 01/10/05 – 02/18/06

Electron Cooling - Shemyakin 19 Remaining questions  Life time  The antiproton life time suffers at strong electron cooling  Effect is not dramatic, but its removal will add additional percents to the number of antiprotons in Tevatron  Ultimate strength of cooling  ECool works at 300  10 10, but additional work may be needed to cool effectively 600 

Electron Cooling - Shemyakin 20 Summary  The relativistic, non- magnetized electron cooling has been demonstrated  Allows other laboratories to proceed with further developments: BNL- electron cooling at RHIC, E e = 54 MeV GSI & TSL- fast cooling of antiprotons, E e = MeV  Fermilab has a world – record electron cooling system that has allowed recent advances in luminosity  A hard limit on the maximum number of antiprotons in the Recycler has been removed. The road to higher luminosities is open.

Electron Cooling - Shemyakin 21 The team (at the final stages)  Beam studies  A.Burov  K.Carlson  D.Broemmelsiek  C.Gattuso  M.Hu  G.Kazakevich (BINP, guest scientist)  T.Kroc  S.Nagaitsev  L.Prost  S.Pruss  S.Seletskiy (U.of Rochester)  A.Shemyakin  C.Schmidt  M.Sutherland  V.Tupikov  A.Warner  Engineering support  B. Kramper  J. Leibfritz  L. Nobrega  G. Saewert  K. Williams  Technical support  M. Frett  R. Kellett  J. Nelson  J. Simmons International collaboration  BINP (Novosibirsk, Russia)  V. Parkhomchuk  V. Reva  COSY (Juelich, Germany)  D. Prashun  BNL  A. Fedotov  Physics discussions and modeling  V. Lebedev  JINR(Dubna, Russia)  I.N. Meshkov  A. Sidorin  ANL  W. Gai