Multiple-output, Variable-output DC Power Supply May03-22 Team Members: Erik Johnson Joel Jorgensen Peter Holm Philip Schulz Clients – Prof. Patterson,

Slides:



Advertisements
Similar presentations
Dec I/O Laboratory Development Industrial Review Board Presentation December 12 th, 2001 Cpr E 211 Microcontroller Evolution.
Advertisements

Wireless Stereo Audio Communicator for Television Use Dec /10/2002 Team Members: Advisors/Clients: Matthew Hamilton Dr. John Lamont Eric Hagen Prof.
4/28/2004Optical Tape Measure Optical Tape Measure May Team Members: Faculty Advisors: Nick Freese (EE) Dr. Aleksander Dogandzic Bruce Fu (EE) Dr.
Precision Variable Frequency Drive Group May07-13 Jason Kilzer Nick Nation Dave Reinhardt Matt Shriver Client: Jim Walker Faculty Advisor: Professor Ajjarapu.
Multiple-Output, Variable-Output DC Power Supply - Phase 2 May 04-08
Precision Variable Frequency Drive May Client: Jim Walker Advisor: Dr. Ajjarapu Team Members: Matt Shriver Jason Kilzer Nick Nation Dave Reinhardt.
For Electric Vehicle Team Members Pramit Tamrakar- Electrical Engineering Jimmy Skadal- Electrical Engineering Hao Wang- Electrical Engineering Matthew.
PIC Evaluation/ Development Board Dec02-12 December 10, 2002 Client: ECpE Department Faculty Advisors: Dr. Rover, Dr. Weber Chad Berg, Luke Bishop, Tyson.
Abstract/Problem Statement The goal of this project is to develop an efficient, safe and scalable system for charging and monitoring a multi-cell battery.
4/24/2007Iowa State University Program to Evaluate Alternative Energy Sources EE / CprE 492 May Team Members Christina Erickson Daniel Harkness Matt.
Paint Heat Lamp Power and Control System Team Members: Sui Kwan Ng Vincent Ong Raymond Sidharta Joseph L. Vetter September 18, 2003 Client: H & S Autoshot.
Computer-Based Trading Room Dec04-05 Client: ISU College of Business Advisor: Dr. Gerald B. Sheblé Team Members Steve Saillard Vipul Tiwari Dan Fitch Fahim.
Tower Light Show Power Supply Team Members: Jesse Walson Jake Wagner Dave Miller Sponsor: Robert Rinker Team Advisor: Touraj Assefi.
Kyle Merkert ECE 791/792 Senior Design Project October 2009 – May 2010 Faculty Advisor: Dr. Wayne Smith.
POWER PLANT USED IN TELECOM
02/06/031 State of the Art Battery Charger Team: Richard Musumhi Bo Bo Oo Pascal Openshaw Chris Privitere Client: Senior Design 2/6/2003 Team May
Power Supply for a Remotely Operated Vehicle (May05-12) Team Members: Jonathan GettlerEE Tai OngEE Adam WhiteEE Wei YauEE Client:Scott Morgan Stealth ISR.
Temperature Controller for Infrared Paint Curing September 13, 2001 Dec01-11 Team Members Michael Burman, CprE Jonathan Johnson, EE Matthew McMullen, CprE.
HydroFly: Fuel Cell Group Group Members: -Adam Lint -Chris Cockrell -Dan Hubbard Sponsors: -Dr. Herb Hess -Dr. Brian Johnson.
Radio-Controlled Duck Decoy May April 30 th, 2003 Team Members: Faculty Advisors: Jason Freerksen Prof. Robert Weber Kooi-Tjek Lau Prof. Clive Woods.
Alternative Lower Cost Hearing Aid Dec03-10 Client: Herb Harmison Advisor: Edwin Jones Jr. Team Members: Hassan Qureshi Hamdan Al-Mehrezi Trong Do Nathan.
Multiple Robot Network Team May Clients: Brian Johnson, Shayne Schiltz, and Amy Wilmeth April 26, 2001.
Abstract Previous senior design teams developed an amplifier board for Teradyne Corporation. This board will boost the input signal to a computer-based.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Educational Laboratory Virtual Instrumentation Suite (ELVIS) May Client: National Instruments Advisors: Dr. Mani Mina, Dr. Diane Rover Group Members:
Senior Design Laboratory Design Dec 05-01
Defining Procedures for Decision Analysis May & Engr A April 30, 2002 Client & Faculty Advisors –Dr. Keith Adams –Dr. John Lamont –Dr. Ralph.
FPGA Controlled Laser Assembly FPGA Controlled Laser Assembly Project Dec03-07October 8, 2003 Client National Instruments Faculty Advisors Professor Mani.
Mixed-Signal Option for the Teradyne Integra J750 Test System May08-12 Emily Evers Vincent Tai.
Paint Heat Lamp Power and Control System Team Members: Sui Kwan Ng Vincent Ong Raymond Sidharta Joseph L. Vetter December 9, 2003 Client: H & S Autoshot.
Project Team: May December 5 th, 2005 Client Iowa State University – Senior Design Faculty Advisor Dr. Degang J. Chen Team Members Wesley Adreon.
Problem Statement Expanding the capabilities of an auto repair paint drying system that uses newly developed ultraviolet (UV) light activated paint. This.
Campus Locator Definition Phase May04-04 Client: Senior Design Advisors: Dr. Lamont & Prof. Patterson Team Members Justin Davis Justin Gruca Rachel Hadaway.
Project Web Site: Client: Jim Walker Advisor: Professor Ajjarapu Abstract.
For Electric Vehicle Team Members Pramit Tamrakar - EE Jimmy Skadal - EE Hao Wang - EE Matthew Schulte - EE William Zimmerman - EE Advisor Ayman Fayed.
DEVELOPMENT OF LABORATORY MODULE FOR SMALL WIND TURBINE CONTROL SYSTEM (Phase V) Advisor/Client: Dr. Venkataramana Ajjarapu Group MembersPosition on Team.
Testing Considerations Because of potential life threatening consequences resulting from device malfunction, it is critical that the device be fully tested.
ABSTRACT The purpose of this project is to develop an amplifier for Teradyne Corporation. The amplifier will take the input signal and amplify it without.
High-Performance FPGA-Controlled Amplifier Phase IV May April 27 th, 2005.
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
Cybot and OSCAR Elementary School Tutorial Dec02-03 December 10, 2002 Client: Electrical and Computer Engineering Department Advisors: Dr. Lamont, Dr.
GUI For Computer Architecture May01-05 Team Members: Neil HansenCprE Ben JonesCprE Jon MathewsCprE Sergey SannikovCprE Clients/Advisors: Manimaran Govindarasu.
December 2nd, 2008 Power Melder Midterm Presentation.
Optical Encoder for a Game Steering Wheel May05-26 Client: Thomas Enterprises Advisors: Dr. James Davis Dr. Douglas Jacobson Team Members: Sam Dahlke,
Portable Rechargeable Output Power Supply (PROPS) Final Presentation April 24, 2008.
December 2nd, 2008 Power Melder Midterm Presentation.
Alternative Energy Evaluation May06-16 Team Members: Steve ChebuharEE Anhtuan DinhEE Ryan FerneauCprE Justin JorgensenEE Client : Professor Ralph Patterson.
Plasma Sense Amplifier
Device Interface Board for Wireless LAN Testing
Alternating Current Potential Drop Probe Alternating current potential drop (ACPD) testing is a relative newcomer to the area of nondestructive evaluation.
Client: Department of Electrical and Computer Engineering at ISU Advisor: Professor R. Patterson III Team Members: Daniel J. Marquis (EE – 1 st ) – team.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
PC Based Spectrum Analyzer April 29, 2003 May03-10 Faculty Advisor: Dr. DJ Chen Michael Cain Paul Heil Eric Rasmussen Aung Thuya Client: Teradyne Inc.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Problem Statement The goal of this project is to complete the basic automated functions of the Dream Green putting surface. The objective is to produce.
Equations for Ecademy Client: ISU Computation Center Faculty Advisor: Dr. Robert Anderson Technical Advisor: Dr. Pete Boysen Team Members:  Tim Arganbright,
Abstract The purpose of this project is to design a high-performance FPGA-controlled amplifier for Teradyne Corporation. This will constitute Phase IV.
In today’s world of ever-increasing energy prices and environmental concerns, alternative energy sources are constantly being researched. This project.
Team Theremin1 Analog Theremin Using Vacuum Tubes and Frequency Detection via Band-pass Filters Ryan Adams, Matt Britt, Yuri Yelizarov, William Findley.
Clients/Faculty Advisors Dr. Eric Bartlett May01-14 Team Members David Herrick Brian Kerhin Chris Kirk Ayush Sharma Incremental Learning With Neural Networks.
Improved Driver Education May Client:Iowa Department of Transportation Advisors:John Lamont Ralph Patterson III Max Porter Duane Smith April 25 th,
Device Interface Board for Wireless LAN Testing Team May Client ECpE Department Faculty Advisor Dr. Weber Team Members Nathan Gibbs – EE Adnan Kapadia.
LIGHTNING PROTECTION OF TRANSMISSION AND DISTRIBUTION LINES Team Members Eric Nelson, EE – Project LeaderDavid Dieterich, EE Tim Conrad, EE – Com. CoordinatorSam.
WEEK 3 Project Planning.
Sponsor: Name & Affiliation Faculty Advisor: Name Put a picture of what was created here.
Microcontroller Enhancement Design Project
Multiple-Output, Variable-Output DC Power Supply - Phase 2 May 04-08
Switching DC Power Supplies
Garage Parking Indicator
FPGA Controlled Amplifier Module May 06-14
Presentation transcript:

Multiple-output, Variable-output DC Power Supply May03-22 Team Members: Erik Johnson Joel Jorgensen Peter Holm Philip Schulz Clients – Prof. Patterson, Prof. Lamont Faculty Advisor – Dr. Allan Potter April 30 th, 2003

Presentation Overview Problem statement and solutions Problem statement and solutions Summary of activities Summary of activities Resource requirements Resource requirements Summary of progress Summary of progress Questions Questions

General Problem Statement Develop a power supply with the following voltages: +1.5V,  3.0V, +3.2V, +4.5V,  5.0V, +6.0V, +7.5V, +9.0V,  12.0V, +15.0V, +18.0V, +24.0V Develop a power supply with the following voltages: +1.5V,  3.0V, +3.2V, +4.5V,  5.0V, +6.0V, +7.5V, +9.0V,  12.0V, +15.0V, +18.0V, +24.0V Output 2 + voltage outputs and 2 + voltage outputs simultaneously Output 2 + voltage outputs and 2 + voltage outputs simultaneously Produce for a low cost (~$150) Produce for a low cost (~$150) Allow a maximum current of 1A through each set of terminals Allow a maximum current of 1A through each set of terminals

Solution Approach Develop general design Develop general design Simulate and test on CAD program Simulate and test on CAD program Order parts Order parts Assemble Assemble Test Test Modify and re-test if necessary Modify and re-test if necessary

Operating Environment Standard laboratory conditions Standard laboratory conditions –Indoors –Approximately 24 degrees Celsius Standard 120V, 60 Hz wall output Standard 120V, 60 Hz wall output

End Users and Uses Users Users –Research and design students –Faculty Uses Uses –Power and test design projects –Produce a small current at many voltages –Provide several voltages simultaneously

Assumptions and Limitations Assumptions Assumptions –All four outputs will be used simultaneously –Power supply will be used indoors at room temp –Power supply will be powered by 120V, 60 Hz Limitations Limitations –Output current limited to 1A max per output –Total cost must be below $150 –Input must be 120V at 60 Hz

End Product Description 4 selectable output voltage terminal sets 4 selectable output voltage terminal sets Maximum current of 1A per output Maximum current of 1A per output Output voltage selected by rotary knobs Output voltage selected by rotary knobs Digital readout of voltage, current and wattage Digital readout of voltage, current and wattage Fuses for power supply protection Fuses for power supply protection

End Product

Present Accomplishments Schematic simulated and successful Schematic simulated and successful Successfully implemented transformer and bridge rectifiers on circuit board Successfully implemented transformer and bridge rectifiers on circuit board Successfully implemented +/- voltages on circuit board Successfully implemented +/- voltages on circuit board Examined methods of implementing positive only voltages Examined methods of implementing positive only voltages

Approaches to the Design Recycle/modify/incorporate existing insufficient power supplies Recycle/modify/incorporate existing insufficient power supplies Create and design an original power supply Create and design an original power supply –Use store-bought voltage converters –Design and create voltage converters »Flyback converter »Buck converters »LM317T/LM337T voltage regulators

Project Definition Activities The power supply specs were expanded from the original to include the following: The power supply specs were expanded from the original to include the following: –+3.2V, +7.5V, +15V, and +18V –2 + voltage outputs and 2 + voltage outputs –Ammeter and voltmeter

Research Activities The need for more voltage outputs was researched. The need for more voltage outputs was researched. –It was found that the additional voltages of +3.2V, +7.5V, +15V, and +18V would be useful for small home electronics Also researched various power supply designs for ideas to implement in the final product. Also researched various power supply designs for ideas to implement in the final product.

LM317T/LM337T Voltage Regulators Adjustable output down to +1.2v Adjustable output down to +1.2v Adjustable current limiting feature Adjustable current limiting feature Line regulation typically.01%/V Line regulation typically.01%/V Load regulation typically.1% Load regulation typically.1% 80 dB ripple rejection 80 dB ripple rejection

TL494 PWM Control Circuit Up to 200 kHz oscillator frequency Up to 200 kHz oscillator frequency Feedback allows voltage and current regulation Feedback allows voltage and current regulation

Design Activities Different implementation schematics tested Different implementation schematics tested Because the LM317T/LM337T voltage regulators are not in the Workbench/Pspice libraries, the circuits were physically tested Because the LM317T/LM337T voltage regulators are not in the Workbench/Pspice libraries, the circuits were physically tested

Personnel Effort Budget Team MembersPaper WorkResearchDesignConstructionTotals Est.Act.EstAct.Est.Act.Est.Act.Est.Act. Erik Johnson Joel Jorgensen Peter Holm Philip Schulz Totals

Financial Budget ItemOriginal Estimated CostCost to Date Poster$50.00 Case$14.99$0.00 Transformers$35.53$21.94 Resistors/capacitors/diodes$26.80$21.18 Cooling fan$9.99$8.99 Switches, dials, and terminals$25.00$6.21 Meters ($10.25 each)$30.75$0.00 Variable voltage regulator$4.00$3.90 Total $197.07$112.22

Project Schedule

Project Schedule, cont.

Project Evaluation Done on a scale of: incomplete = 0%, to complete = 100% Done on a scale of: incomplete = 0%, to complete = 100% Milestones: Milestones: Overall Status: Prototype Overall Status: Prototype Define problem 100% Determine solution 100% Design power supply 95% Order parts and assemble 75% Test75% Revise and retest if necessary 75% Release0%

Commercialization Estimated cost to produce: $100 - $200 Estimated cost to produce: $100 - $200 Estimated sales price: $400 - $1000 Estimated sales price: $400 - $1000 It is anticipated that this product would have a very large market It is anticipated that this product would have a very large market –Versatile –Financially viable

Recommendations for Additional Work Finish original implementation Finish original implementation Develop a commercial version Develop a commercial version Add power factor correction Add power factor correction Make each set of terminals fully isolated Make each set of terminals fully isolated Make current limitation adjustable Make current limitation adjustable

Lessons Learned What worked What worked –Team worked well at brainstorming, designing –Advisor was helpful when we got stuck –Regular, scheduled meeting What did not work What did not work –Collaborating on reports and poster –Weekly status reports –Ordering parts –Gaining the necessary knowledge –Advisor absence for extended period of time

Lessons Learned (cont) Technical knowledge gained Technical knowledge gained –How power supplies work –How DC-DC converters work –How transformers work –How to use Workbench Things to do differently Things to do differently –Put more time into research early on

Risks and Risk Management Illness Illness –Follow good health practices –Take on some of the sick member’s workload among the other members Accidents such as electrocution or fire Accidents such as electrocution or fire – Follow high voltage safety procedures when assembling –Cut power, use First Aid, call 911, put out fire Losing a team member Losing a team member –Be such a good team that nobody wants to leave –Divide the work among the remaining members, seek assistance from colleagues

Summary Problem: Replace the current power supplies with a single versatile tool Problem: Replace the current power supplies with a single versatile tool Approach: Consider several different alternatives by which multiple voltages can be provided simultaneously by a single power supply Approach: Consider several different alternatives by which multiple voltages can be provided simultaneously by a single power supply Solution: Provide two plus/ground terminals and two plus/minus/ground terminals whose voltage can be set independently of the others. Also provide meters to display the voltage, current, and wattage of the selected set of terminals Solution: Provide two plus/ground terminals and two plus/minus/ground terminals whose voltage can be set independently of the others. Also provide meters to display the voltage, current, and wattage of the selected set of terminals

What questions do you have?