Province of Rimini (IT) PP2 Alberto Rossini – Claudia Ozzi – Claudia Berretta (Energy Unit)

Slides:



Advertisements
Similar presentations
Armand Racine Consultant Chemicals Branch
Advertisements

1 EU Strategy for the Baltic Sea Region as a tool to implement the EU2020 European Commission Directorate General Regional Policy Territorial Cooperation.
Electric Vehicles Industrial Cluster - NPO IKEM Corp. (Business entity of EVIC) Changing the Government Agenda of EU's poorest countries using the power.
DG Joint Research Centre Institute for Energy and Transport
Getting European Research Funds Dr Philip Griffiths Associate Head of School, Built Environment Centre for Sustainable Technologies University of Ulster.
Douwe Cunningham Secretary General
New opportunities for regional development through cross-border cooperation Ministry of Environmental Protection and Regional Development November 16,
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
1 IIFREE, NOVEMBER 16 th -18 th 2014 INTERNATIONAL INVESTMENT FORUM FOR RENEWABLES ENERGY & ENERGY EFFICIENCY FOR MENA Gianni Chianetta.
Identification of needed competences Socio-economic development in the era of renewable energies: Towards the creation of a research institution for the.
Emission trading: will it work for PRC ’ s SO2 emission and acid rain control? ZHANG, Shiqiu College of Environmental Sciences Peking University Beijing.
Western States Energy & Environment Symposium October 27, 2009.
EU Energy Strategy
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
VI. KAZENERGY Eurasian Forum Wind energy development in the emerging markets including Kazakhstan Andreas Thomas, Senior Vice President Business Development.
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
Batyr Ballyev, Head, Environment Protection Department, the Ministry of Nature Protection of Turkmenistan Climate Change-Related Priorities & Needs.
Implementation Plan LP. Introduction Main goal 4POWER project Letting regions benefit from this development For renewable energy and business opportunities.
Rome Energy Meeting 2008 Rome, November 2008 Investments Opportunities and Project Finance in the Energy Market Luigi Marsullo President Finpublic.
Towards a policy paper for Italy: Voluntary tools in the implementation of the European low carbon strategy in Italy: the Covenant of Mayors and other.
Policy options and recommendations José Palacín Chief, Innovative Policies Development UNECE Minsk, 19 June 2014.
Development and Transfer of Technologies UNFCCC Expert Workshop On Technology Information Technology Transfer Network and Matchmaking Systems: a LA & C.
COGITA is made possible by Bologna, 23 October 2014 European Public Policies on CSR: The perceptions SMEs Eleni Apospori, Ph.D. Assistant Professor of.
TRP Chapter Chapter 5.4 Facility development.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
We can stop the deadly Impact of global warming. Boon and Bane of Energy The Agenda 21: Instrument to tackle Global Issues Master Source for Driving the.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
Key Barriers for the ICT Research Sector in Serbia, and Recommendations for Future EU- Serbia Collaboration Miodrag Ivkovic, ISS Milorad Bjeletic, BOS.
THE GOVERNMENT OF THE REPUBLIC OF SLOVENIA INSTITUTE OF MACROECONOMIC ANALYSIS AND DEVELOPMENT July 2007 Where is Lisbon? (and how far is it from Ljubljana)
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Strategic Priorities of the NWE INTERREG IVB Programme Harry Knottley, UK representative in the International Working Party Lille, 5th March 2007.
ESCAP’S Pro-Poor Public-Private Partnership (5P) Approach Presented by: Mr. Kohji Iwakami, Economic Affairs Officer, EDD, ESCAP.
Mapping 3M activities and needs at UPT E3M-AL PROJECT - DEVELOPING THIRD MISSION ACTIVITIES IN ALBANIAN UNIVERSITIES Project No: TEMPUS ES-TEMPUS-SMHES.
Legal Aspects Related to Brownfield Regenerations Prof. Maros Finka, M.arch., Ph.D. „This project has been funded with support from the European Commission.
Offshore Wind situation in the Netherlands and Province of Groningen Peter Smale Province of Groningen (LP)
Regulatory and development framework: the key role of TSO cooperation Sopot, November 28 th, 2011 Hervé MIGNON RTE (France)
Milija Čabarkapa NGO Green Home Steps towards sustainable development of small hydropower plants in Montenegro.
Methodologies and Tools for Technology Needs Assessment: an Overview Zou Ji Dept. of environmental Economics and Management, Renmin University of China.
1 Slovak Policy in the area of RE and EE Juraj Valach Ministry of Economy Slovak Republic July 3-4, 2003, Szentendre.
1 This project is co-financed by the European Union STATUS OF RENEWABLE ENERGY IN THE MEDITERRANEAN AND CURRENT CHALLENGES; MedReg Perspective By Prof.
1 Integrating (Mainstreaming) Sound Management of Chemicals into National Development Planning United Nations Development Programme Energy and Environment.
OECD Water Programme Pillar 1, Output 1 “Pricing Water Resources and Water & Sanitation Services” World Water Week Stockholm, August 2008.
Stakeholders Meeting in Addis Ababa October 26, 2012 SSATP Progress Report Urban Transport – Mobility & Accessibility Cluster.
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
Corporate-level Evaluation on IFAD’s Private Sector Development and Partnership Strategy 6 th Special Session of the IFAD Evaluation Committee 9 May 2011.
Regional Consultations and Implementation Plan Co-Funded by European Union European Regional Development Fund Ponta Delgada,
DEVELOPING THE WORK PLAN
Commission proposal for a new LIFE Regulation ( ) Presentation to Directors Meeting DK 22 May 2012.
A Sustainable Tourism Framework for the Caribbean Mercedes Silva Sustainable Tourism Specialist Caribbean Tourism Organization “Ma Pampo” World Ecotourism.
Ermis Project Final conference 5th November 2012 Municipality of Cesena Lia Montalti Councillor for environmental Sustainability, Energy policies and European.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
BioEnergy Sustaining The Future 2 BESTF2 Briefing Event 11 th December 2013 Dr Megan Cooper, BESTF co-ordinator.
Albanian Qualifications Framework Ejvis Gishti, NAVETQ Kiev, March
R EHABILITATION OF R AILWAY T RANSPORT IN C ENTRAL AND E ASTERN E UROPE I NTRODUCTION
Project: EaP countries cooperation for promoting quality assurance in higher education Maria Stratan European Institute for Political Studies of Moldova.
SIMONA MURRONI Bruxelles - June 27th 2013 Bridging lessons learned from the past with new planning and delivery approaches in the energy sector.
Integrated policy frameworks
Policy Instruments Addressing Existing Farms
Legal Aspects Related to Brownfield Regeneration
Harmonization of Policies recommendations for the integration of Sustainable consumption and production in the MED area.
Jonas Zingerle, GIZ Tunis, le 03/09/2012
Supporting Data for a KfW Financed Investment Project on the Montenegrin Coast 18 May 2017, Wien ●
Module 5 The Climate Expert and your role as a consultant
REReP regional meeting on “Energy and climate” in South Eastern Europe
progress of the water reform in bulgaria
Copenhagen Strategy European Policy Seminar on Off-shore Wind Power
Green Action Plan for SMEs
INNOVATION DEALS: A NEW APPROACH TO REGULATION
TF 2 meeting in Milano (11-12 October)
Presentation transcript:

Province of Rimini (IT) PP2 Alberto Rossini – Claudia Ozzi – Claudia Berretta (Energy Unit)

II Regional Consultation Tool: Questionnaire Regional – National Stakeholders: 4 policy makers, 2 researchers, 2 journalists, 2 enterprises, 2 wind associations).

Feed Back The weak feed back received highlights two problems related to the development of OSW in Italy: Policy Makers: they prefer not to officially address this sector because of the sensitivity to local/regional communities; Technicians: few people declared to have technical knowledge to answer. For each issue, the interviewed has given a score (score 1 very inadequate – 5 very adequate)

Main results of RC TSO – ELECTRICITY GRID – MARKET The general situation of the grid is good – it’s not a priority for OSW development (in the short and medium term): the two main transmission grids are situated along the two Italian coasts, Adriatic Coast and Tirrenian Coast. In the long-term it could be possible to find a solution for the energy storage in order to balance the sea wind energy production and the solar energy with hydroelectic energy from the ALPS. The BP that could preferably be introduced in Italy is the FEDERAL ELECTRICITY AGENCY (Germany) because a national coordination is needed. Score: 4

Main results of RC Incentives – Subsidy System In Italy, incentives are necessary because OSW is in a start-up phase. In comparison to the Northern countries, in Italy (and in the Mediterranean area), incentives should be higher because in the Northern area the benefits are higher and there is a clear and certain knowledge of the costs (construction, maintenance, approval) while in Italy not yet. The BP German Renewable Energy Act should be too severe for the Italian context (0,19 €/ kWh y / 0,15 € kWh after the VIII year) Score: 4

Main results of RC Permit Process Although Italy has a codified permit process, it is still considered too weak: vetoes (especially from local authorities and among different administrative levels of different political areas) and the uncerainity of times of release and of the positive end of the permit process undermine the project bankability. A mixed of both permit processes (Italian and German) is desirable. Score: 1

Main results of RC Environmental Impact The monitoring system in Italy is good although it changes for each RES plants. The BP that could be applied in Italy is the Joint Industry Program which is generally recognised in Italy a very good practice. In Italy, to apply it would need the insertion of the landscape aspects for the plant deployment in the Italian territory. Score: 4

Main results of RC Influencing Politicians The attention (and sensitivity) of the Italian politicians towards RES is very low although the Italian electric bill is one of the most expensive in Europe. The BP Energy Valley (NL) could be applied although it would need a tax concessions system to attract private partners. Score: 2

Main results of RC Costs of Developing OSW The stakeholders involved recognize that in Italy it’s hard to create networks and alliances with the aim of developing the OSW. In addition, the BP proposed should be adapted to the Italian conditions where the OSW features are different. Both BP (JIP and Green Deal and TKI) are desirable for the Italian context but has to be adapted Score: 2

Main results of RC Education – Technical Staff Considering the low level of development of OSW, also due to the political uncertainty, in Italy we don’t have high professionalism. On the contrary, considering the low level of OSW development, Italy should not need at this stage to implement a large scale programme. In order to exploit the already existing competences and knowledge of the University, in Italy the BP to be replied are “Engineering Excellence of the Malta University” and “Malta College of Arts, Science and Technology” Score: 2

Main results of RC Infrastructures (Ports – Roads) In Italy the infrastrucures development generally follows the sector development. In the future many Italian ports could be converted for the storage and wind farms maintenance. This BP refers to a very developed context. In any case it could be useful to make an OSW industry plan and to assess the key role of the different Italian ports. Score: 2

Main results of RC Raising Awareness (NIMBY, Education) In Italy the communication on OSW is not complete and even the developers do not properly consider the importance of a good communication when planning a OSW plant. In Italy BP “Offshore Information Centre” (D) and “The Impact of OWE on tourism” (D) should be implemented BEFORE to launch any OSW Plants Score: 1

Main results of RC Supply Chain – Value Added Chain – Resources Some experts evaluate that 80% of the OSW plants components could be created by Italian companies but there’s no agreement among the private companies and the industrial associations are fragmented too. The three BP (Multy Agency Approach - UK, Wind Energy Network - D, NNOW - NL) could be applied in Italy but a common vision is needed first. Score: 2 Score: 2

How to develop the IP TSO – ELECTRICITY GRID – MARKET: Creating a general coordination at national level. Limiting the obstacles for the realease of the authorizations to avoid a waste of time and additional costs. Italy would need a national legal framework binding for all the public institutions involved in the approval processes of the grids. In this way, local authorities couldn’t ban new transmission grids, private operators and the TSO would have more certainity. At the same time it’s necessary a complete mapping of the resources and an integration of all the on-going and planned projects for the general adaptation.

How to develop the IP Incentives – Subsidy System Mantaining the present level of incentives 0,16 kWh plant of more than 5 MW The incentives are considered a good compromise between the sector’s needs and the “expensive bill” of the citizens. In order to improve the system an incentives road map could be done to lawer the incentive in comparison to the decrease of the costs per kWh of the technologies. Every two or theree years Question: if the system is ok why the public auctions haven’t a good results?.

How to develop the IP Permit Process Introducing the French system based on the “Débat Publique” (Public debate) The public debate will ensure a better implementation of the permit process. At the same time, the involvement of local communities could avoid the thousands of administratives appeals which follow an OSW permit release, stopping the OSW farm construction. It could be interesting to adopt a law which recognises that the reduction of the polluting emission is a public interest.

How to develop the IP Environmental Impact Improving at a large scale the communication of monitoring results Private operators and public institution should spread out the results of the monitoring campaigns in order to demonstrate that: -The environmental issues are seriously taken in consideration; -The envionmental impacts are low; -For the noise emission all the necessary measures have been undertaken.

How to develop the IP Influencing politicians/Governments Introducing political incentive system In order to make politicians more sensitive/attentive to the development of OSW (or RES in general), it could be introduced a law which OBLIGE to assign part of the fiscal benefits of the OSW production, such as VAT, Tax on the ground property – for instance the on shore facitlieites of the OSW plant-, royalties for the local public services (for the creation of nurseries, new infrastructures, roads maintenance etc.). In this way a strong boost from the bottom could be created (which is necessary in Italy to avoid contrasts).

How to develop the IP Costs of Developing OSW Creating the premises for alliances and networks In the Italian context is difficult to allow the creation of entities which work on research, offer services in the energy fields and, invest in new infrastructures. For this reason, in Italy, we should: -Create fast tracks for network of RES enterprises (giving them facilities); -Offer fiscal opportunities; -Facilitate the creation of mixed collaboration among different subjects of the public and private sector.

How to develop the IP Education – Technical Staff Investing in ad hoc researches (site-specific) Since OSW is not developed yet, it could be useful to finance project research supported by international cooperation, to assess the OSW potentialities in well defined sites and to develop technologies suitable to the Italian context and the Mediterranean. A cooperation between research centres and industries could be a starting phase.

How to develop the IP Infastructure (Ports, Roads) Creating a national agreement/plan for offshore wind development Taranto could have a offshore wind vocation, because of the wind conditions, but also for the presence of Ilva and Vestas in the area. In addition other ports of the Adriatic coasts could be adapted for OSW purposes. In this case a sound agreement at national level might be defined. In any case it could be useful to make an OSW industry plan and to assess the key role of the different Italian ports.

How to develop the IP Raising Awareness (NIMBY, education) Improving communication system In relation to a specific project, the consultation activities done for the Gronda project of Genova should be replied. In general terms, intitutions, agencies should work more on OSW issues at a large scale.

How to develop the IP Supply Chain – Value Added Chain – Resources Defining a OSW plan The industry sector should be involved in a general “government” agreement to create a productive chain in the long term to: - Increase the producing capacities; - Increase the local added values.

Concluding remarks Private operators and local authorities can play a crucial role in developing OSW cause goverments are generally more fossil oriented. New alliances could be created with the involvement of local communities (with shareholder base or with local authorities acting as RES producers). Considering the Italian wind conditions it is necessary to work on the costs reductions. In Italy we have in any case to launch a pilot case. THANK YOU FOR THE ATTENTION!