HKATS Upgrade to OMex 17.1 Media Briefing 提升 HKATS 電子交易系統軟件至 OMex 17.1 傳媒簡布會 24-09-2003 24-09-2003.

Slides:



Advertisements
Similar presentations
Central Registration Department
Advertisements

Clearing Infrastructure of Hong Kongs Securities and Derivatives Market Mr KC Kwong Chief Executive Hong Kong Exchanges and Clearing Limited 1 June 2001.
1 Achievements and New Initiatives Achievements and New Initiatives Paul Chow Chief Executive, Hong Kong Exchanges and Clearing Limited 7 January 2005.
Media Workshop On New Contingency Procedures In the Event of a Market Interruption in the Derivatives Market 7 August 2002.
BG&E’s PeakRewards SM Demand Response Program Successful Approaches for Engaging Customers August 20, 2014.
Annual Review : Achievements and New Initiatives Paul Chow Chief Executive, Hong Kong Exchanges and Clearing Limited 13 January 2006.
Copyright© JSE Limited Project Orion Release C Market Communication Session 17 August 2007 Leanne Parsons.
2005 Interim Results “Solid Performance From Focused Strategies” Paul M Y Chow Chief Executive, HKEx 17 August 2005.
BM&FBOVESPA MARKET INFRASTRUCTURE: A VERTICALLY INTEGRATED MODEL Paulo Oliveira Chile – Santiago October 2008.
1 Strategic Challenges Facing HKEx Paul Chow Chief Executive, Hong Kong Exchanges and Clearing Limited Conference on the Securities and Futures Ordinance.
2005 Annual Results “Record-setting Year, Record Results” Paul Chow Chief Executive, Hong Kong Exchanges and Clearing Limited 8 March 2006.
Annual Review : Achievements and New Initiatives Paul Chow Chief Executive, Hong Kong Exchanges and Clearing Limited 16 January 2008.
From Paper to Paperless Straight-through Electronic Disclosure and Abolition of Paid Announcement Requirement (The Electronic Disclosure Project) Press.
Health Insurance Oversight System (HIOS)
Network Design and Implementation
Annual Results Announcement “ Stronger performance and producing value for shareholders” 26 February 2004.
and beyond - HKEx’s perspective Paul Chow Chief Executive, Hong Kong Exchanges and Clearing Ltd Presentation at Economic Summit December.
HKEx Strategy From 2006 Onwards Paul M Y Chow Chief Executive, HKEx Presentation at the Hong Kong Securities Institute Roundtable Lunch on 1 December 2005.
1 ASAF 2001 Conference Hong Kong: Asia - The Third Global Financial Zone 4 December 2001 Rising to the new challenges - HKEx’s Response Mr K C Kwong Chief.
AMS/3 Media Workshop (I). Introduction (II). System Overview (III)
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
1 Hong Kong Exchanges and Clearing Limited - Year-end Review 21 December 2000.
CBLC BRAZILIAN CLEARING AND DEPOSITORY CORPORATION
 2013 Master Data Management SIG, All rights reserved Master Data Management (MDM) SIG Oracle Open World Moscone Convention Center, San Francisco,
Annie Griffith December 2007 December 2007 Gemini OSU - UKLC Update.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
Dropbox is a tool the CSME will set up for its participants upon request so that participants do not have to upload podcasts to CSME servers via FTP (file.
- 1 - Presentation On AMS/3 (I) Overview (II) Functions & Capacity (III) Standards (IV) Preparation for Rollout.
Please click here to proceed... Microsoft XP Migration for the Desktop.
Thailand Futures Exchange August 10, 2005 Kesara Manchusree Managing Director.
1 Order Routing System for AMS/3 Lawrence Fok Deputy Chief Operating Officer Hong Kong Exchanges and Clearing Limited 13 February 2001.
Purchasing Director’s Meeting MFMP 2.0 Upgrade Status February 15, 2007.
T. Rowe Price, Invest With Confidence and the Bighorn Sheep logo is a registered trademark of T. Rowe Price Group, Inc. Please dial from.
Texas Nodal 1 Nodal Telemetry Outreach and Recent Changes to Focused Input Testing (FIT) NATF Sep 29, 2009 Stacy Bridges, ERCOT.
Financial Systems Needs Assessment New Financial System: Opportunity for Input/Feedback Monthly Research Administrators Meeting September 2009.
MyFloridaMarketPlace CRB Meeting
PRR 568 – Settlement Timeline PRR 638 – Invoice Timeline PRR 599 – Mismatch Notification COPS January 2006 Updates.
1 Market Trials Outage Scheduling Weekly Update July 23, 2010.
HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008.
1 Asian Financial Services Technology Conference Exchanges & Technology Lawrence Fok Deputy Chief Operating Officer Hong Kong Exchanges & Clearing Limited.
Lead from the front Texas Nodal 1 EDS 4 Release 9.1 DAM/RUC/SASM Market Call January 11, 2008.
2006 Annual Results “Strong Investor Confidence, Record Results” Paul Chow Chief Executive, Hong Kong Exchanges and Clearing Limited 8 March 2007.
Retail Exchange Fund Notes Programme Eddie Yue Executive Director Monetary Management and Infrastructure Department Hong Kong Monetary Authority 3 May.
Copyright© JSE Limited JSE – Africa’s premier exchange JSE MARKET COMMUNICATION SESSION 06 August 2008.
Ganda ERP Project | CFC ERP Project bi-weekly meeting (30/05/2014)
MyFloridaMarketPlace CRB Meeting MFMP 2.0 Upgrade Status February 23, 2007.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window Aug 14, 2009.
1 Market Operations Presentation Board of Director’s Meeting January 22, 2003.
Implementation of the Market Standards for Corporate Actions and General Meetings in the activities of the Central Depository AD Vasil Golemanski 25 September.
TX SET v2.1 Implementation Plan. Table of Contents A.Shut Down Procedure B.Shut Down Timeline Details C.Conference Calls D.Additional Contingencies.
February 2008 Gemini Incident Overview. Agenda Focus this part of the presentation is on the system elements of last year’s Gemini incident :-  Briefly.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
PPC Industry Meeting 8 th September Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
Annie Griffith November 2007 Gemini OSU - UKLC Update.
Presentation of the KZN Provincial eProcurement System Presented by KZN Provincial Treasury 09 February 2016.
Technical Changes and Preparation SLA3 Pilot 2 Fall 2015.
MyFloridaMarketPlace CRB Meeting MFMP 2.0 Upgrade Status February 01, 2007.
Dave Addison August 2008 UK Link Data centre Move Wellingborough to Kettering.
The FX Market Trading hours extended till 23:50.  The Moscow Exchange’s markets have different trading hours. This might limit trading opportunities.
Strategic Challenges Facing HKEx
Asian Financial Services Technology Conference Exchanges & Technology
About Dropbox Dropbox is a tool the CSME will set up for its participants upon request so that participants do not have to upload podcasts to CSME servers.
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Exit Capacity Substitution and Revision
Ctclink executive leadership committee May 31, 2018
PRISMA General Information
TEL031 ODL Analytics Main Activities
Change Management E2E Roadmap
Presentation transcript:

HKATS Upgrade to OMex 17.1 Media Briefing 提升 HKATS 電子交易系統軟件至 OMex 17.1 傳媒簡布會

Agenda Introduction Objectives & Benefits Project Overview External Test Programme Results of Simulated Trading Rehearsal (STR) Fallback Contingency Plan Q & A

Introduction Hong Kong Futures Automated Trading System’s (HKATS) OMex System Upgrade  From Ver to Ver DC Previous Upgrade  January 2002  Software upgrade from Click 3 to Click 5 Prerequisite for DCASS, Derivatives Clearing and Settlement System

Objectives Improve infrastructure of the derivatives market Higher performance Higher efficiencies Prerequisite for implementation of DCASS

Benefits 1. Erroneous Order Protection  Availability of Central Order Size Limit 2. Default account by instrument type 3. Customised Tick Size 4. Compatibility with DCASS for an integrated trading & clearing operation 5. Others

Project Overview Requirement Analysis Completed (Nov. 02) System Development Completed (Apr. 03) Internal Testing Completed (May ~Jun. 03) Test contents reviewed by an Completed (Jul. 03) independent third party External Testing Completed (Aug. ~ Sep. 03) OMex System17.1 DC Go-Live 6 October 2003

External Test Programme 1. 2 Production Readiness Tests (PRT);  9 August 2003 : 1 st PRT with Fallback Test from 17.1 DC to 15.2  16 August 2003 : 2 nd PRT with Backup System Failover Test  Selected pilot Exchange Participants were invited to join these PRTs 2. One-day Simulated Trading Rehearsal (STR);  6 September 2003: 2 Market Rehearsals with Fallback Test from 17.1 DC to 15.2  117 Exchange Participants (EP) had participated in these rehearsals

STR Results 117 Exchanges Participants had participated System stressed to 3 times peak loading System stressed highest to 5 times peaking transactions Performance normal, no abnormality was identified

STR Results Favourable evaluations from participating EPs:  Average 97.5% did not encounter any PC or network problems in both MRs  Average 98.5% viewed that system response time was comparable to current production standards in both MRs  97% viewed that the services provided by the HKATS Helpdesk meet their level of satisfaction  Over 99% believed that the OMex 17.1 DC was ready to be put on production

Fallback Contingency Plan Overview AA stabilisation period of 2 weeks after software upgrade OOccurrence of “unexpected” system failure that is unlikely be resolved within 24 hours FFallback from OMex v DC to v in 3 hours Intra day fallback: before 11:00 am, fallback in afternoon session Next day fallback: after 11:00 am, fallback in next day

Click 5.3 Click 5.2 ParticipantsExchange IT OMex 15.2 OMex 17.1 Fallback procedure Network Gateway Tunnel Server Price Reporting System Clearing Houses

Fallback Contingency Plan Communication: Exchange Participants will be notified via 1. Market Message Window 2. HKATS System 3. Exchange News System 4. Participants System 5. Group Paging System Public investors will be notified via 1. Press announcement 2. HKEx Website (

Fallback Contingency Plan Preparation: Well tested and drilled by the Exchange Well rehearsed by Exchange Participants Briefings, practices, drilled in PRTs/STR Valid for 2 weeks until 17 October 2003

Scheduled Launch Date Monday, 6 October 2003

Q & A