Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex March 18, 2015 1.

Slides:



Advertisements
Similar presentations
Information Technology Update Aaron Smallwood Manager, IT Business & Customer Services.
Advertisements

What would you like to practice?
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex February 18,
Southern Natural Gas Company 2013 Outage Review Meeting Customer con call and Lync Online Meeting September 18,
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex September 17,
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex July 16,
D E P E N D A B L E N A T U R A L G A S Customer Webex July 25 th, 2013.
October 20-21,2009 Agenda Item 6a.. Ohio River CSO Communities Pennsylvania – 10 communities West Virginia – 10 communities Ohio – 10 communities Kentucky.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
2 Permian Basin Supply San Juan Basin Supply Washington Ranch Storage Waha Compressor Stations Gas Supplies Transport Flow Directions Pipelines Production.
I-95 Corridor Coalition Partners in Transportation Progress Capt. Tom Martin Operations Program Coordinator 2009 TIME Conference October 26-27, 2009 Lake.
Southern Natural Gas Company 2013 Outage Review Meeting Customer con call and Webex July 17,
Pivotal Development: Regions of Possibilities Dana Grams Senior Vice President, Pivotal Development.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
KERN RIVER GAS TRANSMISSION COMPANY Wyoming Pipeline Authority Casper, Wyoming August 21, 2007 John Dushinske Vice President of Marketing & Regulatory.
SPECIAL ORDER BY CONSENT EMC SOC WQ S SOC Attachment 1: Summary of Major Line Replacement Completed DescriptionTotal Linear Footage Meadow Greens.
Insert Photo Here And mark any obvious features in the photo that are discussed in the camera point description 342°
Insert Photo Here And mark any obvious features in the photo that are discussed in the camera point description.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
Directions to Camera Point: From the parking lot, head south along the path until the three way intersection by the restrooms. Turn east and there will.
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
AUGUST 19, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex June 18,
PROBE COLLEGE FAIR MONDAY, SEPTEMBER 19TH, 6:00-8:30 ARBOR PLACE MALL.
®® QUESTAR GAS Transportation Balancing Susan Davis, Director, Account & Community Relations February 28, 2014 We develop, transport and deliver clean.
D E P E N D A B L E N A T U R A L G A S | NYSE:EP Customer Webex September 6, 2011.
Intermountain West Production -- Getting Gas to Market Jim Cleary El Paso Western Pipelines IPAA Mid-Year Meeting June 14, 2004.
El Paso Corporation Nominations and Scheduling Customer Advisory Group Update May 14, 2009 Colorado Interstate Gas Company Wyoming Interstate Company Cheyenne.
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex September 16,
RMS Update to TAC May 8, RMS Update to TAC ► At April 9 RMS Meeting:  Antitrust Training  RMS Voting Items: ► NPRR097Changes to Section 8 to Incorporate.
Pipeline Safety Conference New Orleans, Louisiana.
The abbreviation for Texas is TX. The abbreviation for Arkansas is AR.
Southern Natural Gas Company 2015 Outage Review Meeting
Florida Gas Transmission Mainline Hydrostatic Test From the Golden Glades Interchange to the interchange of NW 122 nd Street with the Palmetto Expressway.
Financial Impact of Drought March 5, 2008 Updated 3/17/08.
FERC Order No. 698 Procedures for Providing Hourly Consumption Data Spectra Energy Pipelines June 20, 2008.
Retail Market Subcommittee Update to COPS Kathy Scott May 13,
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex June 17,
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex July 22,
OPTION 9 CO 2 PLANT PROCESSING Description: Operate the existing Castle Valley CO 2 plant to process the Price area coal-seam gas. Plant can processes.
Drought Monitoring, Prediction and Response - A View From Georgia - David Emory Stooksbury, Ph.D. State Climatologist and Associate Professor Engineering.
Southeast State Images.
Southern Natural Gas Company 2013 Outage Review Meeting Customer con call and Webex May 22,
Southern Natural Gas Company 2013 Outage Review Meeting Customer con call and Webex March 14,
Southern Natural Gas Company 2014 Outage Review Meeting
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex October 21,
OCTOBER 2, 2013 Maine 2013 Outage Coordination Redacted Copy.
® February 25, ®  February 25 th - IRP Schedule - Review of IRP Order - December 5 th Weather Event - Wexpro II - Master Planning of System.
Absolute Location: Where is your desk? Relative Location: Where is your desk? Cardinal Directions Relative Location of your Local Community using a Michigan.
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex August 19,
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex August 20,
GA HEN COHORT 3 COACHING CALL WEBINAR/TELNET WEDNESDAY, APRIL 17, :45 AM. – 12:30 PM. TELNET # (770)
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex April 16,
Understanding the Impacts of Incremental Gas Supply on the Flow Dynamics Across the North American Grid Canadian Institute Vancouver, BC November 20, 2006.
Southern Natural Gas Company 2016 Outage Review Meeting Customer con call and Webex March 16,
This Land Is Your Land... Students will: Learn the names of the different regions of the United States. Locate the southeast region of the country. Identify.
Summer 2000 – Present in California
June 5, 2017.
Southern Natural Gas Company 2015 Outage Review Meeting
California Energy Solutions Group
TGP Outages Remainder of the Year (Sept. thru Dec.)
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
Southern Natural Gas Customer Working Group Meeting
Pacific Power Seismic Preparedness Update
projects update ATLANTA district
Southern Natural Gas Company 2018 Outage Review Meeting
System Operational Update and Review December 4, 2018
New Construction Program
Presentation transcript:

Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex March 18,

Welcome 2

Agenda Review Unscheduled Outages Review of Upcoming Outages – March/April & May North System South System South Louisiana – Outages for the remainder of 2015 North System South System South Louisiana Contacts 3

Disclaimers Anticipated Impacts are estimates. Actual nominations, market demand, weather and pipeline conditions, etc. will determine if, and through what level, restrictions become necessary. Unless otherwise stated, all scheduled dates represent gas days as defined in the Southern Natural Gas Pipeline tariff to mean a period of twenty-four consecutive hours, beginning and ending at 9:00 a.m. (Central Clock Time). Scheduled dates are subject to change. Projects may be added, altered, delayed or cancelled. SNG will provide notice of such additions or changes via SoNet Premier postings. Dates as posted on SoNet should be deemed correct in the event of conflicts between SoNet posted dates and dates within this presentation. 4

Color Key for Maps Green – No Impact Anticipated Yellow – Restrictions are possible – With extended duration, restrictions could be necessary from time to time – Meter(s) affected are noted with (M) Red – Restrictions are probable 5

Southern Natural Gas Pipeline LA MS AL GA FL Enterprise White Castle Bear Creek Muldon Chattanooga Atlanta Thomaston Albany Elba SC Aiken Elba Express North System South Louisiana South System 6 Compressor Station Storage Field LNG Compressor Station Storage Field LNG Pearl River Franklinton Gwinville Logansport Bienville Onward Pickens Rankin Toca Shady Side Louisville Bay Springs York Gallion Selma Elmore Auburn Holy Trinity Pavo Reform McConnells Providence Tarrant Pell City DeArmanville Bell Mills Rome Ellerslie Ocmulgee Hall Gate Wrens Hartwell Riceboro Brookman

Southern Natural Gas Pipeline Unscheduled Outage Update LA MS AL GA FL Enterprise White Castle Bear Creek Muldon Chattanooga Atlanta Thomaston Albany Elba SC Aiken Elba Express North System South Louisiana South System 7 Compressor Station Storage Field LNG Compressor Station Storage Field LNG Pearl River Franklinton Gwinville Logansport Bienville Onward Pickens Rankin Toca Shady Side Louisville Bay Springs York Gallion Selma Elmore Auburn Holy Trinity Pavo Reform McConnells Providence Tarrant Pell City DeArmanville Bell Mills Rome Ellerslie Ocmulgee Hall Gate Wrens Hartwell Riceboro Brookman 8” West Point Line abandonment. Franklinton unit outage return to service April of 2015 White Castle unit outage return to service

SNG North System Maintenance Review March/April/May LA MS AL GA Logansport Bienville Bear Creek Storage Onward Pickens Rankin Louisville Muldon Storage Reform McConnells Providence Tarrant Pell City DeArmanville Bell Mills Rome Compressor Station Storage Field Compressor Station Storage Field Huntsville Chattanooga Atlanta 8 Southern will be conducting other general maintenance during this period Bear Creek unit maintenance one unit at a time Through June of 2015 Hydro-test on NMLL to Gadsden Branch loop and Branch line maintenance April to June timeframe Pigging on West Point Loop Line April of 2015 Bear Creek Spring Shut-in test to DIQ and DWQ allocated 64% AL Remediation on 24” NMLL through Hydro-test on 2ndNML to Pipeline remediation on NMLL to Pipeline maintenance on NML April to June Pipeline relocation on NML to Muldon Shut-in test to DIQ and DWQ allocated 36% Remediation on NML/NMLL/2ndNML to Pressure test /remediation 2ndNML to Remediation on NML to Remediation NMLL to Relocation of 6” Rome Calhoun line April/June

SNG South System M aint. Review March/April & May MS AL GA Enterprise Gwinville Selma Auburn Ellerslie Thomaston Ocmulgee Hallgate Wrens Elmore York Gallion Bay Springs Compressor Station Storage Field LNG Compressor Station Storage Field LNG Atlanta Elba Hartwell Elba Express Aiken Holy Trinity Albany Pavo 9 Brookman Riceboro Southern will be conducting other general maintenance during this period Hydro-test SMLL to Remediation on Montgomery Columbus line to Remediation on 12” Jacksonville line to Hydro-test SMLL May timeframe Enterprise station/Rose Hill outage to ” Macon Branch line maintenance to

SNG South Louisiana System Maintenance Review March/April & May Shadyside White Castle Franklinton Toca Gwinville LA MS Compressor Station Storage Field Compressor Station Storage Field West Leg East Leg White Castle, Shadyside Unit Maintenance April and May West Leg Capacity impact up to 150 MMcf/d 10 Pearl River Southern will be conducting other general maintenance during this period Remediation on Duck Lake to Franklinton May/September

North System remainder of the year Item #29-remediation on the 14” Logansport line segment between Logansport and Bienville compressor stations the month of June. Item #30-pipeline relocation on the North Main loop line east of Tarrant compressor station to Item #31-Remediation on North Main loop line west of Tarrant compressor station to Item #32-Remediation on North Alabama line to Item #33-Pipeline relocation of the Chattanooga Branch and loop line. April to June timeframe. 11

North System remainder of the year cont. Item # 34-Maintenance on the North Main line east of Tarrant compressor station to Item # 35-Maintenance on the North Main line west of Tarrant compressor station to Item # 36-Maintenance pigging on the Marietta Branch line east of Bell Mills compressor station. June to November timeframe Item # 37-Hydro-test the TCI loop line west of Tarrant compressor station to Item # 38-Hydro-testing on the 2 nd North Main line east of McConnells compressor station. Capacity could be reduced as much as 285 MMcf/d - September/October timeframe 12

North System remainder of the year cont. Item # 39-Remediation on the 2 nd North Main line west of Tarrant compressor station. Capacity could be reduced as much as 355 MMcf/d. September/October timeframe Item # 40-Remediation on the 2 nd North Main line east of Tarrant compressor station. Capacity could be reduced as much as 245 MMcf/d. September/October timeframe Item #41-Relocation on the Chattanooga Branch line during the last half of the year. Item #42-Fall Storage field Shut-in-tests. Muldon to Bear Creek to

South System remainder of the year Item #43-maintenance pigging on the 30” Riverdale line north of our Thomaston compressor station in Georgia during the month of September. Item # 44-Hydro testing on the Huber #1 line east of Wrens compressor station to Item # 45-Upgrade work at Thomaston compressor station. Capacity reduced up to 330 MMcf/d. Mid August/October timeframe. Item #46-Remediation on the Brunswick line south of Ocmulgee compressor station. April/May timeframe Item # 47-Upgrade work at Brookman compressor station to Item # 48-Upgrade work at Riceboro compressor station to

South Louisiana System remainder of the year Item # 49-Maintenance at White Castle and Shadyside compressor stations. West Leg capacity impact up to 150 MMcf/d - September/October timeframe 15

Gas Control Contacts Adam Krustchinsky – Manager (713) – 420 – 3265 (office) (713) – (cell) Kalman (Kal) Dankovich – Outage Coordinator (713) – 420 – 7522 (office) (713) – 420 – 7305 (Gas Control) Jimmy Reese – Lead Controller (713) – 420 – 7310 (office) (713) – 420 – 7305 (Gas Control) Daniel Mitchell – Lead Controller (713) – 420 – 5874 (office) (713) – 420 – 7305 (Gas Control) 16