GLAST LAT ProjectBeam Test Meeting 1/21/2006 L. Latronico1 Beam test activity in Italy Integration & test activities –1x1 tower completed and under test.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectBeam Test SW F.Longo1 PS Simulation Recent activities –Pipeline runs 0 and 40 Electrons and 0 0 and 90.
Advertisements

CU Beamtest Workshop III, June 28-30, 2006 C. Cecchi – S. Germani – M. Pepe Offline Monitor for CU Beam Test Claudia Cecchi Stefano Germani Monica Pepe.
GLAST The GLAST Balloon Flight experiment was performed with the collaboration of NASA Goddard Space Flight Center, Stanford Linear Accelerator Center,
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 S. Ritz 1 GLAST Large Area Telescope: Instrument Design Steven M. Ritz Goddard.
GLAST LAT ProjectCU Beam Test 11/8/2005 L. Latronico1 Glast LAT Calibration Unit Beam Test at CERN Overview of Tasks 11/8/2005.
GLAST LAT Project IA weekly meeting, February 3, 2006 ACD subsystem Alex Moiseev 1 ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT ProjectDOE/NASA CD3-Critical Design Review, May 12, 2003 S. Ritz Document: LAT-PR Section 03 Science Requirements and Instrument Design.
The CU Beam Test at CERN Status Report and highlights from workshop II Luca Latronico LAT C&A Meeting May
PID, trigger and DAQ for the GLAST beam test (preliminary study) Nicola Mazziotta INFN Bari Dec. 6, 2005.
GLAST LAT Project Collaboration Meeting 8/30/ Beam Test Plan - SLAC End Station A Secondary Beams Gary Godfrey August 30, 2005 GLAST Collaboration.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
Luminosity Monitor MWPCs, test beam 22 results. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
GLAST LAT Project Test Beam Meeting, June 6, 2006 S. Funk 1/6 PS Positron Simulations Stefan Funk June 6, 2006.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
SoLID EC Update Zhiwen Zhao 2012/05/22. Beam test update Coverage for PVDIS Road map.
1 GLAST-LAT Calibration Unit Shipment to SLAC Plan Review Luca Latronico Alessandro Brez Michele Pinchera
The GLAST Large Area Telescope – Design, construction, test and calibration Luca Latronico (INFN-Pisa), Gloria Spandre (INFN-Pisa) on behalf of the GLAST.
PANDA Anton A. Izotov, Gatchina A.A.Izotov, Gatchina, PANDA Forward TOF Walls. Side TOF walls in dipole Magnet SiPM/PMT187.
PrimEx collaboration meeting Energy calibration of the Hall B bremsstrahlung tagging system using magnetic pair spectrometer S. Stepanyan (JLAB)
Lead Fluoride Calorimeter for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory October 31 st 2008.
Geant4 simulation for Balloon Flight Jan. 16, 2001 Software Workshop at SLAC Tsunefumi Mizuno.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
Aa GLAST Particle Astrophysics Collaboration Instrument Managed and Integrated at SLAC/Stanford University The Gamma-ray Large Area Space Telescope (GLAST)
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
GLAST LAT ProjectGlast Collaboration Meeting 2005 R. Bellazzini1 Glast beam test at CERN Glast Collaboration Meeting 2005.
Gamma-ray Large Area Space Telescope 15th INTERNATIONAL WORKSHOP ON VERTEX DETECTORS September , 2006 Perugia, Italy GLAST Silicon Tracker beam.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
Calorimetry for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory Workshop on General Purpose High Resolution.
The experimental setup of Test Beam HE EE ES BEAM  A slice of the CMS calorimter was tested during summer of 2007 at the H2 test beam area at CERN with.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
first results from EMCal test beam
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
10/10/2005 Alex Moiseev 2006 LAT Beam test 1 Suggestions to 2006 LAT prototype beam test plan Alex Moiseev, NASA/GSFC.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
1 GLAST LAT Project CalSoft Face-to-Face Meeting April 15 – 16, 2004 Benoît Lott GSI Analysis Status Degrader 58 Ni Beam Fragments Target EM miniCAL GSI’s.
Status of E14 G.Y.Lim IPNS, KEK. E14 Experiment Step-by-step approach to precise measurement of Br( K L    ) KEK-PS E391a J-PARC E14 (Step-1) J-PARC.
Geant4 Tutorial, Oct28 th 2003V. Daniel Elvira Geant4 Simulation of the CMS 2002 Hcal Test Beam V. Daniel Elvira Geant4 Tutorial.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
Selected Pictures Luca Latronico - INFN on behalf of the beam test team GLAST Collaboration Meeting Stockholm 8/29/2006 GLAST Large Area Telescope: Calibration.
06/2006I.Larin PrimEx Collaboration meeting  0 analysis.
GLAST LAT Project Instrument Analysis Meeting– Feb 28, 2006 Tsunefumi Mizuno TowerTrend_ ppt 1 Tracker Parameters Trending Monitor GLAST I and.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
FTOF Status Anton A. Izotov, Frascati
Analysis of    production ► Data taking ► Reaction identification ► Results for double polarization observable F ► Summary Based on data taken in the.
Report of GLAST Balloon Flight October Annual meeting of Astronomical Society of Japan T. Mizuno and other GLAST Balloon Team
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
Rainer Stamen, Norman Gee
GSI Test Preparation Visit to GSI october 12 Installation plan agreed
Simulation Tools for Test Beam
Gamma-ray Large Area Space Telescope ACD Final Performance
Comparison of GAMMA-400 and Fermi-LAT telescopes
The interaction region for FIRST (status report)
Gamma-ray Large Area Space Telescope
Single-CAL Test and Calibration
Samples of Hall B Results with Strong Italian Impact
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope Instrument Science Operations Center
Scintillator HCAL: LOI issues
Overview Goal Study GEM variables in SVAC ntuple
Integration and Test Organization Chart
Status Report and highlights from workshop II
Overview of Beam Test Benoit, Ronaldo and Eduardo Nov 8 , 2005 thanks to Steve and Bill for helping to consolidate all the information.
Presentation transcript:

GLAST LAT ProjectBeam Test Meeting 1/21/2006 L. Latronico1 Beam test activity in Italy Integration & test activities –1x1 tower completed and under test –CAL CPT rerun and understood –runs taken with different CAL configurations for NRL study on shaped readout noise (extra noise induced by readout if next event is triggered few microsecond after readout) DAQ –External triggering not working: GASU and test box back at SLAC for check or replacement Ancillary systems –Started discussion on test plan implications on ancillary systems and test setup (see slide 3) Data simulations and analysis –Exercise production started almost everywhere using both beamtest06 and standard Gleam –Evaluation of achievable target precision for specific measurements based on beam knowledge under way (compare to slide 4 table) CU beam test Workshop at INFN-Pisa on march –It will be a working meeting –Possibility to extend visit to work in specific areas (DAQ merge, data- stream merge, integration and mechanics procedures, ACD location, simulation tutorials, analysis groups)

GLAST LAT ProjectBeam Test Meeting 1/21/2006 L. Latronico2 Data Acquisition GASU Ext trigger box VME PS HouseKeeping PC Rotation stand – will extend to 1x4 TKR CAL (inside) Bay (outside) TEM/TPS Ethernet cables to DAQ and monitor PC Easy to rotate – Carmelo rotated a 150Kg tower in less than a minute (180 degress clock and counter-clock wise for fun)

L. Latronico Page Number ParticleEnergyAreaAncillary systemsInterestNotes  50MeV- fewGeV PSSi-Tagger CAL for tagger calibration Anticoincidence scint. before CU Beam dump to stop e- from hitting CU PSF TKR, CAL recon Statistics required dependent on 1/E brems. spectrum Need to change beam energy to avoid degrading resolution High energy limited by bending power and hall depth e-,  GeVPSCerenkov EM/Had separation CAL recon Is there an energy range where Cerenkov are inefficient? We will need to calibrate TRD anyway at PS so we might as well use it for PID Coarse sampling for  Low energy hadrons (p, , K) Up to few GeV (dependi ng on beam) PSTOF for p (hard-to-fit and calibrate in T9 area due to limited space) Cerenkov for  EM/Had separation Backgnd rejection Are p really needed or can we live with  ? p require reverse beam polarity / need to identify proper target e+Up to few GeV (dependi ng on beam) PSCerenkov TRD Backgnd rejection (e + annihilation in ACD/thermal blanket) require reverse beam polarity / need to identify proper target 1-2 mm Al from ISP different from 2.5 g/cm 2 from ACD/thermal blanket/TKR sidewalls  can provide variable Al spacers e-,  GeV SPSCerenkov TRD EM/Had separation CAL recon ACD backsplash need to evaluate beam composition to determine if TRD must be in trigger (if very few electrons) coarse sampling for  All PS runs will require anticoicidence scintillators after CU to screen backsplash from rear wall

L. Latronico Page Number From LAT-TD (under revision) Comparison with current expectations: need to decide if p are really needed not clear how many e+ we can have, but for most studies e- will do as well (e+ came from the original SLAC setup) it will be hard to have 10GeV tagged , unless we keep the deviated e- in the CU and maybe only study TKR (hard to separate  and e in the CAL)