Beam Losses and Machine Protection (real life) By Kay Wittenburg, Deutsches Elektronen Synchrotron DESY, Hamburg, Germany Experiences from HERA (accidental.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Quench levels and transient beam losses at HERA Beam losses in operation (transient, continuous). What beam losses lead to magnet quenches (for top energy.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
12/03/2013MPP Workshop Annecy Update on Beam Failure Scenarios Jan Uythoven Thanks to: T.Baer, R.Schmidt, J.Wenninger, D.Wollmann, M.Zerlauth, other MPP.
Demands and Requirements for the New Control System for GSI Future Accelerators An Overview U. Krause, S. Richter, P. Schütt.
CAS June Stored energy and risks Failures Protection systems Beam Instrumentation Case studies Conclusions Machine Protection Rüdiger Schmidt CAS.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Concept & architecture of the machine protection systems for FCC
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
Weaknesses of the LHC Machine Protection System Bernhard Holzer, CERN BE-ABP... what a MPS should do: 2 major tasks * protect the machine in case of hardware.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Interlock and Protection Systems for SC Accelerators: Machine Protection System for the LHC l The Risks l The Challenge l The LHC Layout l The Systems.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Accelerator Group for LHeC LHeC Meeting at CERN; October Questions raised by Max  does the e-ring fit into the tunnel?  can one bypass ATLAS and.
Beam Losses and Machine Protection (real life) By Kay Wittenburg, Deutsches Elektronen Synchrotron DESY, Hamburg, Germany Experiences from HERA (accidental.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
HERA Operation 2004 M. Bieler, -MPY- PRC, Mai Performance Improvements in Remaining Problems - Improvement Program - Schedule 2004.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Friday morning Dump fill due to the trip of the RQF.A78  intervention had been just planned for the morning on the circuit Access, interventions:  RQF.A56/78,
PostMortem Workshop January LHC “Post Mortem” Workshop: Introduction Initiative by Robin Lauckner, Adriaan Rijllart and myself, helped by many other.
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Chamonix 2006, B.Dehning 1 Commissioning of Beam Loss Monitors B. Dehning CERN AB/BDI.
1 Machine considerations and constraints for the Safe Injection Flag and Safe Beam Flag Jörg Wenninger AB-OP-SPS Introduction to ‘injection flags’ Machine.
Beam losses in the CLIC drive beam: specification of acceptable level and how to handle them ACE Michael Jonker.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
CLIC Interlock System study: from Principle to Prototyping Patrice Nouvel TE-MPE-EP TE-MPE Technical Meeting : 22/03/2012.
PAC Meeting, December 12, Prebys 1 The Problem.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
K H Meß AT-MEL, AB/CO Review, Post Mortem during Beam Operation P. Duval*), M. Lomperski*), K. H. Mess *) DESY.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
R.Schmidt and J.Wenninger - Lumi ‘061 Rüdiger Schmidt Jörg Wenninger CERN LUMI 06 in Valencia / Spain Friday 20 October 2006 Machine protection for PS2,
The Survey of the Power Supply Reliability at SSRF
RF acceleration and transverse damper systems
Challenges of Dual Harmonic RF Systems
The TV Beam Observation system - BTV
Introduction: FCC beam dumping system
The LHC - Status Is COLD Is almost fully commissioned
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
Friday 15th June 01:11 Injection.
MD2036: UFO dynamics studies and UFO fast detection
Disabling Rules.
Initial Experience with the Machine Protection System for LHC
Saturday 12:00 Fill 1992 in stable beams.
Remote setting of LHC BLM thresholds?
Machine Protection Xu Hongliang.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Interlocking of CNGS (and other high intensity beams) at the SPS
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Sunday/Monday & :30 Stable beams. Fill #1851.
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Thursday
Friday 15th February - morning
Presentation transcript:

Beam Losses and Machine Protection (real life) By Kay Wittenburg, Deutsches Elektronen Synchrotron DESY, Hamburg, Germany Experiences from HERA (accidental losses) Beam Dump: why?

Loss-Mechanisms 1)After an equipment failure (e.g. Power supply(ies) trip) the beam starts to oscillate (position or size) with an exponential growing amplitude. First losses occur after a time (length) which depends on the failure typ – then the beam “explodes” within a very short time. 2) Mislead beam. Might be very fast (< 1 turn). Reasons: Kicker, Operation, … t 0 X or Y Failure First losses Total Beam loss Aper- tur long short  t,  l

Note: A quench in HERA is not a disaster! It takes typ. 1-2 h to recover from cryogenic  = 189 Quenches More statistics HERA experience with

No quench Dump due to losses HERA BLM Alarm System

5 ms event, PS failure, HF failure 92 BLM Alarms

Old HERA Beam-Loss-Alarm- Topology ALIs Alarm loop-Zentrale Alarmloop DUMP BLMs + BPMs +Alarm-modules “Alarm-Loop- Interface” Internal Power- Supply- Alarm Galv. Trenn. HF failure input

Clean Dump due to HF alarm

start after 5 month shutdown

start after 5 month shutdown (Lumi upgrade) All by 5 ms PS failure events

What is a critical PS?

Alarm timing during failure of a critical magnet power supply t 0 X oder Y Power supply failure Aper- tur BLM- Alarm ACCT- Alarm Improved and faster internal Power-Supply- Alarm Magnet- current- Alarm Total- loss Too late No faster BLM Alarms due to spiky background!

ALIs Alarm loop-Zentrale Alarmloop DUMP BLMs + BPMs +Alarm-modules “Alarm-Loop- Interface” Beam-Loss-Alarm-Topology Internal Power- Supply- Alarm Galv. Trenn. faster Active New ACCT-Alarm DCCT-Alarm Faster clock rate Magnet current- Alarm More Failure inputs: PS, HF, …

Improvements Beam-Dump: before: 570  s after: 10  s Alarm at 0 Turn by turn current of bunch #1 DCCT beam current

BPM SL345 had wrong readings. => local Bump at one Quad. => < 4 BLM- alarms

Story (1): Statement: In HERA each cold Quad has a BPM. Instruction: Install a BLM close to each BPM to cover all cold Quads. DONE Events: Quenches of one Magnet in the middle of the arc during ramp. Observation: No Orbit distortion, no beam losses. ????? After a few days, some tries, some quenches: Observation 2: The correction coils in this area showed higher values Calculations: The correction coils drive a local closed bump. WHY THE BPM and BLM DIDN’T SHOW ANYTHING???? Observation 3: There is no BPM (because there is a cold-box. No BPM foreseen) Observation 4: Therefore there is no BLM (see above) Analysis: The automatic Orbit correction makes the local bump by accident. Consequence: Now we installed a BLM! => flexible system

Alarm Zentrale failure: Threshold went from 5 to 30

Story (2): Due to a wrong cabling, the alarms of 20 BLMs were subtracted and not added Story (3): Fieldbus-commands for other modules on the bus were interpreted by the ALZ

Injection: 10 bunches injected into first Dipoles

Collimators went too far into the beam.=> Losses in the magnets behind. (no quench but happened in earlier years. Very high Collimator BLM thresholds) protons

Operating (1): Wrong rampfile was chosen by operator.

Operating (2): Fast switch-on of magnets. Alarm loop (A1) was still disabled

Diverse: Hitting a cable during drilling (no quench)

Experiments PS-manipulation coasting beam Operating diverse diverses Operating dump? Remarks: What was first? Transient recorders most helpful. Here: p-beam was lost 8 ms before e-beam. Quench

Dump of 19% coasting beam is not a problem in HERA.

Some loss induced quenches were not documented in the Logbook?!?!?

The End now open for discussion

Dear colleagues, In Session V we are planning a discussion on failure scenarios leading to accidental beam loss. We would kindly ask you for your help, since the number of possible failures scenarios is (nearly) infinite. There are some obvious type of failures: power converter fault, magnet quench, unsynchronised beam dump,..... More subtle failures were also reported. One example: due to a wrong delay set in the beam dump kicker electronics, a number in a register became negative, and the dump kicker did not fire. We would greatly appreciate your help for a discussion on all kind of failures and accidental beam losses: a) What are the most common failures leading to accidental beam loss that you know of? b) What kind of (atypical) failures did you experience? c) What diagnostics allowed to identify such failures? d) Other comments are welcome... In the session we would hope to compile a list of failures - as an input to machine protection systems for various accelerators. It would be very nice if you would stimulate the discussion by presenting one or two slides on your experience. Thanks a lot, and see you soon, Rüdiger Schmidt and Kay Wittenburg Events from BNL (RHIC) and SNS (R. Keller) Slides from B. Macek LHC requirements (R. Schmidt)

Dear Conveners, I will prepare a slide or two on our experience and will be guided by your 4 questions. It is an important topic for operation of high intensity accelerators that I am pleased to see is being addressed. Regards, Bob Macek I probably won't have an occasion to participate in your session, but here are my two cents worth of input on loss-relevant failure scenarios caused by the injection system (front end) of the SNS accelerator chain. 1) Our biggest worry was and is failure of one of the two chopper systems not providing chopper pulses (due to failure of the timing system or the chopper electronics). This would result in spraying beam on the Ring extraction septum. Possible protection: interlock based on wave pattern recognition, monitoring the actual chopper excitation currents. 2) Interference between the global control system (EPICS) and the dedicated timing system could lead to extending the ion source discharge and Linac pulse length or macroscopic duty factor. This is primarily a dump load concern, but I could imagine it resulting in higher beam loss as well if the rf system cannot cope with the additional average load. A cure for this effect might be very hard to find because the root cause is incompatibility between two systems. Best regards, Rod Keller

Solution 2: Proton and Positron ring in Lumi-Optic - BPM thresholds reduced to around 3 mm. Clean dump - no detectable current loss before dump triggered. Congratulations! Logbook comment to the test: “ In dem Quencharchiv steht die Schwelle in der Alarmloopzentrale auf 30 und es werden 30 anstehende Alarme angezeigt. Wenn das Setzen von 40 Monitoren noetig war, dann deutet dies darauf hin, dass in den Alarmkassetten nicht alle BPMs Scharf geschaltet sind (leider sind dies Jumper im Tunnel unter Beton). Naja, wenn 3/4scharf sind, geht das ja noch. “

< 4 BLMs Still 4 loss induced quenches in 2004: