Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Progress and Plan for Superconducting RF Cavity RF Group.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
D.Proch, Thin film Workshop, Legnaro, Oct SC RF cavity technology: the possibility of mass scale production, a global review Remarkable production.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
ANL-FNAL Collaboration Meeting: Superconducting RF ANL: Mike Kelly, Scott Gerbick, Bill Boettinger (NE) FNAL Collaborators: Kerry Ewald, Cristian Boffo,
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ TILC08 – Tohoku University 3-6 March 2008 Sendai - Japan G. Wormser.
ATLAS Intensity and Efficiency Upgrade ATLAS USERS MEETING Speaker: Mike Kelly Physics Division May 15, 2014.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Mechanical Issues SPL cavities/cryomodules Workshop CERN 30 Sep. 2009
Present status of TTF-cryomodules short overview Bernd Petersen DESY MKS March, 7, 2005 Main design features of TESLA-cryomodules Design changes for XFEL-cryomodule.
ILC ACCELERATOR AND DETECTOR TECHNOLOGY IN INDUSTRY SUPERCONDUCTING PARTICLE ACCELERATOR FORUM OF AMERICA KENNETH O. OLSEN June 12, 2013.
Work toward Stainless Steel SRF Helium Vessels at Fermilab Tom Peterson (presenter), Information from Jeff Brandt, Serena Barbanotti, Harry Carter, Sergei.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Advanced Energy Systems, Inc. Prototype Cavity Fabrication & Test Presented by Ilan Ben-Zvi, BNL for Michael Cole, AES.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
1.3GHz Input Coupler for ILC
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Spoke test in vertical cryostat IPNO-UU Meeting on spoke test program, 2 nd -3 st October 2013 IPNO Team.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
Overview on DESY Infrastructure and up date/ grade Activities schedule status and plans Axel Matheisen DESY.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Status and Perspectives of the SPL R&D R. Garoby – 6/12/2012 SPL Seminar 2012 December 6-7, 2012 CERN.
Developing the Collaboration P McIntosh STFC Daresbury Laboratory.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
RF SC CAVITIES –a story AMICI Industry days – Padova April 2017.
WP High Beta Cavities Delivery
CERN – Zanon discussions
Field Emission Minimization for LCLS-II
Cryomodule test stand at ESS site
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Preparation of functional/engineering specifications for HL-LHC
WP5 Elliptical cavities
ILC R&D Board Meeting: SRF Cavities Status and Plans
at STFC Daresbury laboratory
Superconducting Cavities: Development/Production
HL-LHC-UK: UK contribution to HL-LHC Crab Cavities and evolution
Superconducting RF Crab Cavities
Highlights from EU Global Design Effort
Michael Pekeler RI Research Instruments GmbH Friedrich-Ebert-Str. 1
IHEP Cryomodule Status
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Prototype cryomodule development
Daresbury ESS In-Kind Contributions
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Double-Spoke Cavities
Challenges and Deadlines for Production
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production

RI Research Instruments GmbH Advanced Technology Equipment and Turn-Key System Supplier for Research, Industry and Medical worldwide Linear Accelerators RF Cavities, Coupler, Auxiliaries Superconducting Accelerator Modules Electron and Ion Sources Beam Diagnostic Elements and Particle Beamlines Accelerator Equipment for Particle Therapy Specialized Manufacturing Projects RI Research Instruments is continuing the business of the former ACCEL Instruments and former Siemens activities in rf accelerator and specialized manufacturing. 51% of shares by Bruker EST, Inc. and management holding a significant equity stake of the company. Project management, engineering and manufacturing with a staff of about 150 people RI Research Instruments GmbH (blue coulored area) in the Technologiepark Bergisch Gladbach near Köln

RI Company Organization

Core Competences and Markets Products / Services  Linear Accelerators  RF Cavities, Couplers  SRF Accelerator Modules  Electron and Ion Sources  Beam Diagnostic Elements  Particle Beamlines  Precision Manufacturing Equipment Markets  Fundamental Physics  Applied Research  Medical/ Particle Therapy  Inspection  Energy/Nuclear  Advanced Technology Industry physics layout – engineering – design – manufacturing – assembly – testing – service broad technology portfolio - more than 20 years long track record Quality Management certified according to DIN EN ISO 9001:2008, KTA Technologies  RF, Accelerator  Superconductivity  Cryogenics  Vacuum  Specialized Manufacturing  Surface Treatment  System Integration  Integrated System Control

Customers and partners in «Big Science»

RI’s specialized manufacturing technologies (1/2) Manufacturing technologies:  Turning (CNC)  5-axis milling (CNC)  Metal working  Surface technology (cleaning, etching, coating)  Joining technology (EB, TIG, vacuum brazing)  Heat treatment  Assembly (partly in cleanroom) and testing  RF, vacuum cryogenic  Quality control Electron Beam Welder (1/2) Brazing Furnace (1/2) Manufacturing Premises

RI’s specialized manufacturing technologies (2/2) RF testing and assembly of linear accelerator systems Assembly of superconducting rf structures in clean room condition (ISO 4)

Overview of RI activities in accelerator technology: Superconducting RF SNS 10 cm TESLA/ILC/XFEL

Superconducting cavity production

Superconducting cavities - prototypes Frankfurt CH mode cavity, 357 MHz Second CH mode prototype for Frankfurt University contracted end of last year One more CH mode cavity for Darmstadt University contracted this year Chemical preparation, High pressure rinsing, assembly in our clean room Vertical test at University Frankfurt. Max. Surface Field = 25 MV/m

16 QWR (88 MHz) cavities for GANIL Cavities (4 mm thick sheet) and helium vessel Tight tolerances, especially after helium vessel welding, no bellows on helium vessel

Production of CEBAF upgrade cavities Procurement of niobium cavity manufacturing, bulk chemistry RF tuning (fundamental mode and HOM couplers). Order for 86 pieces 1.5 GHz 7-cell cavities received in July 2009 Niobium at RI in November Original schedule: First article to be delivered in June 2010, last cavity to be delivered middle of 2011 Achieved schedule: First article delivered July 2010, 84 cavities delivered in November 2010, one year after niobium supply, 2 last cavities delivered in March 2011 (lack of niobium material, additional material had to be ordered for the last two cavities). Schedule improved by 2 shift operation on turning, milling and electron beam welding machines.

XFEL cavity production project Order for 300 cavities received from DESY in September 2010 RI scope: Mechanical manufacturing of cavity, respecting the pressure vessel code Complete Surface preparation and helium vessel welding Shipping to DESY under vacuum and “ready for vertical test” Extensive documentation and QA is crucial and will ensure that cavities are manufactured and treated according to detailed DESY specification. No performance guarantee DESY: Cavities will be cold RF tested at DESY (vertical test) with helium vessel already welded After successful test, DESY will ship the cavities under vacuum to CEA for module assembly Niobium and helium vessel supplied by DESY

XFEL cavities / subcomponents

RI infrastructure for XFEL

500 MHz accelerator modules Technology transfer from Cornell University, USA 2000: 2 SRF modules for NSRRC,Taiwan 2000: 2 SRF modules for CORNELL,USA 2000: 2 SRF modules for CLS, Canada 2003: 3 SRF modules for DLS, Great Britain 2005: 3 SRF modules for SSRF, PR China 2010:3 SRF modulesfor PAL,Korea 2012:1 SRF modulefor DLSGreat Britain Cavity production Cavity surface preparation Cavity vertical test Coupler production Coupler conditioning Ferrite style HOM loads Module assembly Installation on customer site Commissioning Valve boxes and transfer lines SRF Electronics Interlock and data acquisition system

Cavity preparation and test Exemple

Factory testing, shipping, installation

RI Research Instruments GmbH Advanced technologies, turnkey systems Project management, engineering and manufacturing Integrated system control, software Highly motivated, qualified people Project oriented, integrative, flexible Intensive, multinational cooperation's Global player in an expanding worldwide business