Data Centre Masterclasses The King of Green Data Centres is the one that does not need to be built. Chris Butler, on365 Product Manger for Enterprise Management.

Slides:



Advertisements
Similar presentations
Challenges in optimizing data center utilization
Advertisements

Optimaliseer de complete infrastructuur binnen uw datacenter met DCIM
Matt Warner Future Facilities Proactive Airflow Management in Data Centre Operation - using CFD simulation to improve resilience, energy efficiency and.
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC All rights Reserved. PI for Energy Monitoring and Facilities Management in World Class.
1 A Schneider Electric Software for Pre-Design of Industrial and Tertiary Building Electrical Distribution.
Computer Room Provision in Atlas and R89 Graham Robinson.
1 Colocation Datacenter – Tenant Portal - Kolding IBA - the E-Designer line 3. November 2014 Morten Moeller.
APC by Schneider Electric – Strategies for managing distributed IT environments.
Cooling Product Positioning
Overcoming the challenge of virtual blindness Colin Richardson on365 Ltd.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Introduction - PI for Facilities Regional Seminar Series Madrid Jesús.
© 2010 OSIsoft, LLC. – Company Confidential 1 Empowering Business in Real Time Regional Seminar Series Presents: Enrique Herrera Industry Market.
Data Centre World Expo 2009 Designing, building and operating high density data centres Kevin Sell Head of Technical Facilities, Telstra International.
Unit 206: Domestic hot water systems
By: Enter Your Name School/Dept.:. What new instructional strategies did I implement in my classroom/practice during the course of the PDU? Please add.
CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration Data Centers.
Gary C Akers Technical Manager. * No wall clutter. * Reduced risk of clashes. * Aesthetically pleasing. * Site benefits. * Environmental benefits. * Cooling.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Critical Facilities, Data Center,& IT Regional Seminar Series Mike.
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Using PI for Energy Monitoring and Facilities Management in World.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Symmetra ® LX – redundant UPS High performance, redundant.
IPAC Energy Efficient Data Centers and Management Tools.
High Density Cooling Air conditioning for high density applications
Schneider Electric 1 Foundational BUSINESS OVERVIEW Rev 2 Virtualization and physical infrastructure – Integrations with Microsoft and VMware.
Cloud Computing Kwangyun Cho v=8AXk25TUSRQ.
Air Conditioning and Computer Centre Power Efficiency The Reality Christophe Martel Tony Cass.
APC InfraStruxure TM Central Smart Plug-In for HP Operations Manager Manage Power, Cooling, Security, Environment, Rack Access and Physical Layer Infrastructure.
Cullen College of Engineering RFID-Based Solutions for Piping Technology Piping Tech & UH July, 2007.
Data centre air management Case studies Sophia Flucker.
LANsense.
Neil Sanderson 24 October, Early days for virtualisation Virtualization Adoption x86 servers used for virtualization Virtualization adoption.
Fantastic Fridges alias Refrigeration and Air Conditioning your name your company.
Copyright © 2004 Insight Technology, Inc. All Rights Reserved. 1 Performance Insight for Oracle 5.2 V.S Oracle Enterprise Management
ThinDesk, Inc.. What is Thin Computing?  IT Industry is buzzing about Green IT, Virtualization both in the Data Centre and on the Desktop, Public / Private.
NEW SESIS PROFESSIONAL DEVELOPMENT: A PROMISING PRACTICE READINESS FOR CHANGE: PROGRESS IN THE PROCESS MAY 5, 2014 Andrew J. Ecker Lower Hudson RSE-TASC.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November.
ELECTRICITY COST OF CHILLER AND COOLING TOWER PUMPS KILLING YOU? We Have The RIGHT Solution just for YOU! + =
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
Creating SmartArt 1.Create a slide and select Insert > SmartArt. 2.Choose a SmartArt design and type your text. (Choose any format to start. You can change.
System Components Let’s take a look at the Spacepak System Components.
Key Customer ChallengesCustomer Pain Points How You can Help the CustomerProductsSolutionsServices Increasing Density Difficult to maintain 300 cfm per.
Energy Savings in CERN’s Main Data Centre
All content in this presentation is protected – © 2008 American Power Conversion Corporation Row Cooling.
Analysis and Forming of Energy Efficiency and Green IT Metrics Framework for Sonera Helsinki Data Center HDC Matti Pärssinen Thesis supervisor: Prof. Jukka.
This courseware is copyrighted © 2016 gtslearning. No part of this courseware or any training material supplied by gtslearning International Limited to.
Monitoreo y Administración de Infraestructura Fisica (DCIM). StruxureWare for Data Centers 2.0 Arturo Maqueo Business Development Data Centers LAM.
InfraStruXure Systems Alex Tavakalov
[Eco 2 System] A Fundamental Twist To Data Centre Cooling Ecological Friendly & Economical.
The Genome Sequencing Center's Data Center Plans Gary Stiehr
WELCOME. Glycol Refrigeration A most basic definition of refrigeration is taking heat from someplace we don’t want it and moving it to someplace where.
© 2007 Eaton Corporation. All rights reserved. Avaya Products & Eaton Capabilities Andy McDonald April 2008.
Dell EMC Modular Data Centers
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
The Data Center Challenge
Integrating a Data Center into an Engineering Laboratory Building
Using Heat to Increase Cooling George Hannah BEng (Hons) CEng MIMechE
Greening Your Information Systems
CERN Data Centre ‘Building 513 on the Meyrin Site’
Data Center Service Brian Messenger 11/15/2016.
Dresdner Bank & Wyndham International: The Business Case for Server Consolidation Chapter 3 Case 2.
ATLAS Thermosiphon Electrical Distribution and Run Modes
Insertable B Layer Cooling System
Insert Product Photograph Here
DAT381 Team Development with SQL Server 2005
Plug & Play CHP? Is Your Pocket About to be Picked?
Objective Use financial modeling of your data center costs to optimize their utilization.
Represented By:. “Provides Professional Services in Power Supply & Air Conditioning Business” PRESENT AGENDA.
What’s new ArcGIS 10.1 for Server The Server Framework
Presentation transcript:

Data Centre Masterclasses The King of Green Data Centres is the one that does not need to be built. Chris Butler, on365 Product Manger for Enterprise Management

Agenda Identify Data Centre Personnel and their issues -What they worry about - What questions are asked Resolutions IT Professionals - What questions are asked Resolutions

What do they worry about? Planning to modify or add to the installed physical layer of the Data Centre Checking the Health of the Data Centre The Data Centre Manager

What questions need to be answered? If I add or move a piece of equipment, what will happen? How much power & cooling am I using in the data centre? When am I going to run out of capacity The Data Centre Manager

The IT & Operations Manager What do they worry about? Availability of physical infrastructure to support servers and other IT hardware to meet the business needs Space, power & cooling

The IT & Operations Manager What questions need to be answered? Will this new server impact my SLA or capacity plan? What is the power & cooling requirement for this piece of equipment? What is the available kW power at the rack level?

Power Management, Monitoring and Data Logging –Sub Mains Incomer –Data Centre PDU Branch Circuit –Rack Level PDU Strips & Outlets –Data Centre Third Party Systems and Hardwar Cooling Solution and Systems Management. Monitoring and Data Logging –Data Centre Cooling and Air Conditioning Solutions (Point to Point) –Chillers –Condensers –Pumps Sets –Air Handlers –Hot and Cold Aisle Environmental Characteristics –Rack Level Environmental Characteristics What is needed to answer these questions?

BMS? IT Systems? Manually? How to gather & store the data

ISX Central & Capacity Manager Real time Capacity Planning

Questions presented to IT professionals? Physical placement? Hardware Assets? Maintenance?

ISX Central and Change Management Clear Instruction Visibility Change Management

Q&A