Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
Two-dimensional and wide dynamic range profile monitor using OTR/fluorescence screens for diagnosing beam halo of intense proton beam Y. Hashimoto, T.
BSRT Optics Design BI Days 24 th November 2011 Aurélie Rabiller BE-BI-PM.
WP 13 : Beam Diagnostics Conceptual Specifications Rhodri Jones (BE/BI)
(BI) Needs and Experience with Cameras in Radioactive Environment Stephane Burger BE BI-PM BI review on Radiation development and testing 22 nd of November.
AWAKE Electron Spectrometer Design Simon Jolly 4 th September 2012.
Laser news AWAKE performance meeting Overview There was a meeting on with the supplier of the laser system (AMPLITUDE) No new information.
Profile monitors, Injection Matching monitor, BSRT & BSRA LHC OP days - 19 th of January 2010 – Evian Stephane Bart Pedersen, Andrea Boccardi, Enrico Bravin,
9/25/031 First Tests of an Optical Transition Radiation Detector for High-Intensity Proton Beams at FNAL September 25, 2003 Vic Scarpine.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
Recent Progress in X-ray Emittance Diagnostics at SPring-8 S. Takano, M. Masaki, and H. Sumitomo * JASRI/SPring-8, Hyogo, Japan SES, Hyogo, Japan *
SPS Syncrotron Telescope Software specifications Aurélie Goldblatt BE-BI-PM
AWAKE Electron Spectrometer Simon Jolly, Lawrence Deacon, Matthew Wing 28 th January 2015.
SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo.
05/05/2004Cyrille Thomas DIAMOND Storage Ring Optical and X-ray Diagnostics.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
“Performance of BTVs during the CNGS commissioning” E. Bravin AB/BI NBI th International workshop on Neutrino Beams and Instrumentation 4-9 September.
The Stripping Foil Test Stand in the Linac4 Transfer Line
LARP Commissioning Plans for the LHC Synchrotron-Light Monitors Alan Fisher SLAC National Accelerator Laboratory LARP CM13 Port Jefferson, NY
Based on Lars’ progress report of LIU SPS BI Status of follow-up 13/10/2015Lars K. Jensen, V. Kain1.
BSRT CALIBRATION MD SUMMARY LSWG #6-15/09/2015 BSRT TEAM.
G. Ferioli, R. Jung - LHC-BI Review Workshop November 19&20 LHC Screen Profile Monitors G. Ferioli, R. Jung Introduction BTV LHC layout Monitor set-up.
Matching monitors for SPS and LHC E. Bravin 31 March 2011.
G. Trad on the behalf of the BSRT team LHC BI 2015 summary 13/11/2015.
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
Beam Halo Monitoring using Optical Diagnostics Hao Zhang University of Maryland/University of Liverpool/Cockcroft Institute.
NON-INTERCEPTING DIAGNOSTIC FOR HIGH BRIGHTNESS ELECTRON BEAMS USING OPTICAL DIFFRACTION RADIATION INTERFERENCE (ODRI) A. Cianchi #1,2, M. Castellano 3,
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
Challenges in Beam Instrumentation Rhodri Jones (BE/BI) LIU-2011 Event, 25 November 2011, CERN.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
SL/BI 16/05/1999DIPAC’99 -- JJ Gras -- CERN SL/BI -- Adaptive Optics for the LEP 2 SR Monitors G. Burtin, R.J. Colchester, G. Ferioli, J.J. Gras, R. Jung,
BSRT UPDATE LMC 02-OCT-2012 F.Roncarolo on behalf of the BSRT team W.Andreazza, E.Bravin, A.Boccardi, J-J.Gras, A.Goldblatt, M.Hamani, T.Lefevre, R.Jones,
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
MD377 Schottky diagnostic M. Wendt, M. Betz, T. Lefevre.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
Wir schaffen Wissen – heute für morgen PSI, March 2013 Paul Scherrer Institut PSI / DESY / KIT Mini-Workshop on Longitudinal Diagnostics for FELs.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
G. Trad on the behalf of the BSRT team Emittance meeting 04/11/2015.
LIU Day 2014 – M.Bodendorfer - LEIR model. LEIR model A plan for understanding/upgrading the LEIR performance limitations M.Bodendorfer BE/ABP & LEIR.
Installation new BTV HiRadMat from 2017
LHC Wire Scanner Calibration
Beam instrumentation MDs
The TV Beam Observation system - BTV
Beam Gas Imaging Kick-off meeting 30-Oct-2012
E-beam scanner experience at FNAL
MD2243: Coronagraph commissioning at 6.5 TeV
E. Bravin, A. Goldblatt, S. Mazzoni, F. Roncarolo, M. Palm
Summary of experience with Tevatron synchrotron light diagnostics
AWAKE proposals for BE/BI
Emittance growth AT PS injection
Status of the BI Work Package in the LIU-PSB frame
Beam instrumentation for the upcoming TIDVG#5
S.Burger BE-BI-PM HiRadMat Scientific Board 29th June 2017
Lebanese Teacher Programme 18/04/2017
ODR/OTR emittance station at ATF2 (KEK)
Proposals of new electron cloud monitor in the PS
Remote setting of LHC BLM thresholds?
High resolution profile measurements
Proton Beam Diagnostics
Status of muon monitor R&D and construction
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Measurement of the beam (transverse) emittances
Status of the BI Work Package in the LIU-PSB frame
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad

Contents SPS Beam Synchrotron Radiation (BSR) Monitor SPS Matching Monitor 3

SPS Synchrotron Light Monitor 4

SPS BSR Specifications Transverse profile measurements We don’t have detailed specifications. We assume we have to provide: −Continuous monitoring (as technically possible) at high energy (>300 GeV seen to work) ● Mentioned as beam quality check device before extraction −Bunch gating (if technically feasible) −Integrating over minimum number of turns −Size evolution during ramp 5

Proposed Technology 6 Magnets MBB and Sync. Light source: edges of the 2 dipoles beam Vacuum mirror Fold mirrors 1 and 2 steering mirror BSR SPS: BA5 distances (mm) light source to vacuum mirror14150 Vacuum mirror to 2d fold mirror450 2d fold mirror to motorized mirror600 mirror to camera4300 Synchrotron light used for imaging is emitted by the falling edge of MBB52130 and rising edge of MBB52150 Undulator for working below 270 GeV would require very short period structure - Investigating status of technology, but no conclusions yet

7 Imaging with 1 lens f=3300mm, achromat, optimized between 500 and 800nm Magnification = 0.27 Resolution expected to be ~120um (considering chromatic aberrations and diffraction) Beam size expected (450 GeV,emit=2um): H = 600um (450um with no dispersion control), V = 580um Gated camera Proxitronic HSF4, photocathode N type (LHC-BSRT) Spot diagram JML Lens: 18um (Zemax) CCD camera (gated and intensified) Motorized steering mirror Lens f=3300mm Optical table BSR tank assembly Shielding tube Camera sensitivity Proposed Technology A.Goldblatt

8 SR intensity vs radiation frequency Expected performances Acquisition rate: BTV acq. period 20ms – Gate trigger 5 ms LHC : max integration in 20 ms == 4 turns SPS: max integration in 20ms == GeV: LHC: we can measure pilot single turn every 20ms (== 225 turns)  SPS: should see single bunch integrated over 3 turns (separated by 290 turns) every 20ms LHC period: 89us SPS period: 23us Energy on extraction mirror per bunch per turn (integrated between 200 to 800nm wavelength range) PRELIMINARY SIMULATIONS G.Trad

9 Expected performances As shown: not so much light, especially below 300 GeV SPS optics knowledge ~10% (beta-beating meas. foreseen?) Relatively high horizontal dispersion (Dx=1.4m) −Need good knowledge of Dx and dp/p −Dy ~= 0, should be ok

Status of Development 10 Will use mostly mechanics already installed: -tank with extraction mirror -fold mirrors -enclosed optical bench, displaced of about 1.5m. -calibration system Elements which will be replaced: -steering mirror -cabling (already pulled) -optics (lens, camera, filters) -control The mechanical system will be ready for restart after LS1

Installation and Commissioning Plan Little mechanics involved We assume BSR SPS is not needed from day 1 (need parasitic commissioning with beam) 11

Budgetary Requirements 2014: 60 kCHF (camera+optics+HW) −Foreseen for 2013, basically not spent −Depends on tests with beam −Baseline ● Do not change tank ● Possible upgrade of optics and movable stages control Still to be sorted out: −Request for SPS Longitudinal Density Monitor ? −Digital Camera as long-term solution 12

SPS MATCHING MONITOR 13

SPS Matching Specifications Transverse Profile −turn per turn acquisition, single bunch −1e10 protons to 1e11 protons per bunch Accuracy: −Variation channel to channel of <1% −Absolute accuracy on beam size not so important – say 10% Resolution : −For good fit should be able to resolve to 1-2% of peak density, with 1e10 p+ per bunch injected Repeatability: −Turn-to-turn variation (relative accuracy) of <1% Monitors at low and high dispersion regions to disentangle dispersion mismatch 14 What is requested

Matching Proposed Technology 15 For after LS1: −Existing system based on cylindrical lenses and fast linear CMOS sensor capturing light from an OTR screen (located in LSS5) Long term: −Replace tank −Replacement chamber −New detector MCP/PM if upgrade needed (sensitivity issue) Beam

16 Matching Expected performances System commissioned in January 2013 −Calibration 1px == 64um −Reasonable S/N ratio only above 2E11p with the present system −Acquisition every second turn −Max 300 turns to avoid screen damage After LS1: −Changing the magnification to reach1px == 100um should improve the S/N −Turn by turn acquisition

Matching Status of Development 17 System already installed in SPS. Need −realignment −reinstall the acquisition electronics −more commissioning time to validate the instrument as operational Matching Monitor (inject and dump, MD time needed)

Matching Installation and Commissioning Plan (for after LS1) Is there a conflict between machines? −No Where are we limited by available manpower? ● Restart of all machines may result in manpower concerns −But: ● We believe matching monitor not required from Day1 (we need dedicated MDs anyhow) 18

Matching Budgetary Requirements No specific budget assigned yet to this project General cost breakdown up until 2019 − : 20kCHF − : 100kCHF 19

THANK YOU FOR YOUR ATTENTION!