N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.

Slides:



Advertisements
Similar presentations
Ch-11 Project Execution and Termination. System Testing This involves two different phases with two different outputs First phase is system test planning.
Advertisements

Requirements Specification and Management
Systems Analysis & IT Project Management Pepper. System Life Cycle BirthDeathDevelopmentProduction.
System Construction and Implementation Objectives:
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Shoper 9 Implementation in Chain Store March 2010.
University of Southern California Enterprise Wide Information Systems Instructor: Richard W. Vawter.
1 Samples The following slides are provided as samples and references for the Quarterly Reviews Additional slides will be added.
Software Project Transition Planning
System Implementations American corporations spend about $300 Billion a year on software implementation/upgrade projects.
©2003 Prentice Hall Business Publishing, Accounting Information Systems, 9/e, Romney/Steinbart 18-1 Accounting Information Systems 9 th Edition Marshall.
APPLICATION DEVELOPMENT BY SYED ADNAN ALI.
System Development Life Cycle (SDLC)
13.1 © 2007 by Prentice Hall 13 Chapter Building Systems.
Lecture Nine Database Planning, Design, and Administration
System Implementations American corporations spend about $300 Billion a year on software implementation/upgrade projects.
Development plan and quality plan for your Project
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
Release & Deployment ITIL Version 3
Picture 1 model: ICT lifecycle in a company 1. business needs & business strategy 2. ICT strategy - ICT assessment - ICT strategic plan - ICT implementation/tactical.
Effective Methods for Software and Systems Integration
Chapter 22 Systems Design, Implementation, and Operation Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 22-1.
Systems Analysis and Design: The Big Picture
Solution Overview for NIPDEC- CDAP July 15, 2005.
DBSi 5.0 Deployment Overview
Database System Development Lifecycle © Pearson Education Limited 1995, 2005.
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
Library Automation. Library automation Why automate? Why automate? The automation process. The automation process. The end result. The end result.
Satzinger Chp. 2 Part Part 4 of 4 2 Object-Oriented Analysis and Design with the Unified Process Testing Testing is critical discipline Testing activities.
Information Systems Development. Outline  Information System  Systems Development Project  Systems Development Life Cycle.
System Development Process Prof. Sujata Rao. 2Overview Systems development life cycle (SDLC) – Provides overall framework for managing system development.
- 1 - Roadmap to Re-aligning the Customer Master with Oracle's TCA Northern California OAUG March 7, 2005.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
End HomeWelcome! The Software Development Process.
Rapid Application Development. What is RAD……..?  Rapid Application Development (RAD) is a software development process.  first developed during the.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
CSI-MAXIMUS, Inc CSI Comprehensive Service & Support Implementing the CSI Way.
Project Management Process Transition & Closure Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Sage ERP X3 Standard Edition Methodology
Unit 17: SDLC. Systems Development Life Cycle Five Major Phases Plus Documentation throughout Plus Evaluation…
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
Chapter 7 Preliminary Construction The broad scope of implementation Preliminary construction in the SDLC Preliminary construction activities Preliminary.
BizForceOne by MegaSolutionCenter (MSC), USA BIZFORCEONE OPERATING SYSTEM BEST FIT IMPLEMENTATION.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
University of Toronto at Scarborough © Kersti Wain-Bantin CSCC40 testing and installation 1 for testing you need: test data and test cases test plans and.
SAP Methods Context PRM1_02.1 PwC Methods & Risk Management Lesson Objectives Participants will be able to: Understand how methods can mitigate project.
Presenter: Igna Visser Date: Wednesday, 18 March 2015
Supporting quality devices
Systems Analysis and Design
System Development Life Cycle (SDLC)
Developing Information Systems
Deck 12 Accounting Information Systems Romney and Steinbart
System Development Life Cycle (SDLC)
Description of Revision
Our Change Management Approach
Systems Design, Implementation, and Operation
Chapter 1 (pages 4-9); Overview of SDLC
CLINICAL INFORMATION SYSTEM
CIS12-3 IT Project Management
System Development Life Cycle (SDLC)
SYSTEMS ANALYSIS & DESIGN
Database Development Cycle
DEPLOYING SECURITY CONFIGURATION
Chapter 13 Building Systems.
{Project Name} Organizational Chart, Roles and Responsibilities
Our Process CMSC 345, Version 1/04.
Presentation transcript:

n A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project Management function in a custom or package software installation. Systems Project Management Approach

n Project organized into Phases; Activities within each Phase. n Project Manager’s Checklists reviewed and completed at the conclusion of each Phase. n Electronic Tools and Templates support use of standards. Systems Project Management Approach

n Project Phases: 1. Project Definition 2. Conference Room Pilot 3. Development / Programming 4. System Integration 5. Procedures and Training 6. Conversion and Startup Systems Project Management Approach

Project Definition n Activities –Develop Project Mission Statement –Organize Team, Define Roles, Obtain Commitments –Develop Training Plan –Develop Project Work Plan –Install Package Software –Conduct Project Team Training –Develop Project Standards and Procedures –Schedule Conference Room Pilot Planning

Project Definition n Project Manager’s Checkpoint –Review/Complete Project Definition Checklist –Review/Complete Software Installation Checklist –Review Procedures and Training Checklist –Review Project Administration Checklist Planning

Conference Room Pilot n Activities –Analyze/Document Requirements –Establish System Prototype –Define CRP Scope and Exercises –Conduct Conference Room Pilot –Log Issue Reports –Draft User Procedures –Review and Update Overall Project Work Plan n Project Manager’s Checkpoint –Review/Complete CRP Checklist –Complete Project Administration Checklist Exploring

Development / Programming n Activities –Develop Programming & Database Standards –Obtain Requirements Definition Approval –Walk Through High Level Designs –Perform Detailed Design –Code and Unit Test n Project Manager’s Checkpoint –Review Programming and Conversion Checklist –Complete Project Administration Checklist

System Integration n Activities –Assign/Resolve CRP Issues –Document System Test Plan –Build System Test Data Model –Conduct System Test –Adjust Custom Programming –Prepare System Hardware and Facilities n Project Manager’s Checkpoint –Complete Project Administration Checklist Testing

Procedures and Training n Activities –Finalize User Procedures –Develop User Training Materials –Conduct User Training –Develop Cutover Schedule/Script n Project Manager’s Checkpoint –Review/Complete Procedures and Training Checklist –Complete Project Administration Checklist

Conversion and Startup n Activities –Train Operations Staff –Load Manually Converted Data –Run Conversion Programs –Verify Master File Data –Balance/Reconcile Transaction Data –Monitor Transactions, Usage, Balances –Close First Period Books n Project Manager’s Checkpoint –Complete Programming and Conversion Checklist

n Conclusion: A successful implementation. –planned –organized –executed –documented Systems Project Management Approach