Power Supply of Front-End Electronic in RICH/TORCH Upgrade Rui Gao, University of Oxford LHCb Upgrade Electronics Meeting 14 th April, 2011, CERN.

Slides:



Advertisements
Similar presentations
Rui Gao, University of Oxford, U.K. on behalf of the TORCH Collaboration (University of Oxford, University of Bristol and CERN) DEVELOPMENT OF SCALABLE.
Advertisements

Burkhard Schmidt for the LHCb Collaboration The LHCb upgrade Outline: Present LHCb detector and trigger LHCb upgrade – main drivers Overview of the sub-detector.
E-link IP for FE ASICs VFAT3/GdSP ASIC design meeting 19/07/2011.
TDC in ACTEL FPGA Tom Sluijk Wilco Vink Albert Zwart Fabian Jansen.
LHCb Upgrade Overview ALICE, ATLAS, CMS & LHCb joint workshop on DAQ Château de Bossey 13 March 2013 Beat Jost / Cern.
1 Design of the Front End Readout Board for TORCH Detector 10, June 2010.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
Power supply planning for upgrade OT  Scintillating Fibre Wilco Vink On behalf of the SciFi group 19 May 2014.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
On behalf of the GBT team
Readout of DC coupled double sided sensors with CBMXYTER: Some first thoughts Peter Fischer, Heidelberg University.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
TOF for ATLAS Forward Proton Upgrade AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream and downstream of central detector to precisely.
VELO upgrade Front-end ECS LHCb upgrade electronics meeting 12 April 2012 Martin van Beuzekom on behalf of the VELO upgrade group Some thoughts, nothing.
FPGAs in the CMS HCAL electronics Tullio Grassi 21 March 2014.
A DIRC for GlueX April 7, 2006 S. Berridge, S. Spanier.
CARIOCA (Cern and RIO Current Amplifier). The CARIOCA chip has 8 binary output, therefore DIALOG has 16 PCH as input channels and has up to 8 LCH as output.
Filip Tavernier Karolina Poltorak Sandro Bonacini Paulo Moreira
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
1 DAQ for FVTX detector Implementation Mark Prokop Los Alamos National Laboratory.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
MaPMT Readout Workshop / Introduction MaPMT Workshop Imperial College 26/27 June 2003 Franz Muheim University of Edinburgh.
2/2/2009 Marina Artuso LHCb Electronics Upgrade Meeting1 Front-end FPGAs in the LHCb upgrade The issues What is known Work plan.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
J.Bibby--Oxford1 LHCb RICH MaPMT Electronics Workshops MaPMT Electronics Schemes. MaPMT Analogue.MaPMT Analogue. MaPMT Analogue-Digital 1.MaPMT Analogue-Digital.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Low Voltage Power Supplies I.Placement II.Size III.Power consumption IV.Cabling V.Regulators board blocs VI.Component selection VII.Schematics VIII.Firmware.
Calorimeter upgrade meeting - Thursday, 3 April CU (Calorimeter Crate Controller for the Upgrade) Board architecture overview Introduction  Short.
24/03/2010 TDAQ WG - CERN 1 LKr L0 trigger status report V. Bonaiuto, G. Carboni, L. Cesaroni, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti,
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
1/12/2010 R. CIARANFI 1 NEW NINO BOARD FOR RICH OLD AND NEW LOGISTIC NEW BOARD DESCRIPTION NEW MODULARITY 32 CH NEW FORM FACTOR FRONT END AREA AND DAQ.
TDC in ACTEL FPGA Tom Sluijk Hans Verkooijen Albert Zwart Fabian Jansen.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
CHEF 2013 – 22-25th April 2013 – Paris LHCb Calorimeter Upgrade Electronics E. Picatoste (Universitat de Barcelona) On behalf of the LHCb group.
Level-1 Data Driver Card (L1DDC) HEP May 2014 Naxos 08/05/2014HEP 2014, NAXOS Panagiotis Gkountoumis National Technical University of Athens.
Ken Wyllie, CERN LHCb electronics, 10th April LHCb Upgrade Electronics Meetings in 2014 (Thursday, 2pm): 12 th June 14 th August 9 th October 11.
Status of the Beetle front-end chip carrier for SRS Lorne Levinson Weizmann Institute of Science Rehovot, Israel L. Levinson, Weizmann Institute, Nov.
BASIC SKETCH OF ACTIVITIES FOR THE CERN LHCB-RICH TEAM (2012 – 2017) Team composition Present activities and consolidation plans RICH – CERN R&D and Upgrade.
CERN F. Alessio & R. Jacobsson CERN LHCb Electronics Upgrade Meeting, April 15, LHCb Upgrade Front End  Back End Readout Architecture Proposal.
Ken Wyllie, CERN Tracker ASIC, 5th July Overview of LHCb Upgrade Electronics Thanks for the invitation to Krakow!
Dirk Wiedner 16 th February OT/ITCALO MUON RICH1/TT RICH2 +TFC system.
Calorimeter upgrade meeting – LAL /Orsay – December 17 th 2009 Low noise preamplifier Upgrade of the front end electronics of the LHCb calorimeter.
High speed signal transmission Jan Buytaert. Topics Electrical standards: CML,LVDS, SLVS Equalization. Testbench of a readout slice. Vacuum feed-throughs.
Proposal of a digital-analog RPC front-end for synchronous density particle measure for DHCAL application R.Cardarelli and R.Santonico INFN and University.
Standard electronics for CLIC module. Sébastien Vilalte CTC
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
Daniel Belver IX Workshop on RPC and Related Detectors, Mumbai February 13-16th 2008 Performances of the Front End Electronics for the HADES RPC wall in.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Actel Antifuse FPGA Information – Radiation Tests Actel Antifuse FPGA – A54SX72A 72K gates 208 pqfp package 2.5v to 5.0v I/O tolerant $62 each for tested.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
LHCb Outer Tracker Upgrade Actel FPGA based Architecture 117 januari 2013 Outline ◦ Front end box Architecture ◦ Actel TDC ◦ Data GBT interface ◦ Data.
Current STS Readout Concept 1 FEB 8 STS-XYTER Electrical Interface SLVS/LVDS pairs/FEB ROB GBTx / VL Optical Interface 4 MM fibers /ROB DPB.
LHCb Outer Tracker Electronics 40MHz Upgrade
TORCH electronics 10 June 2010 Johan Fopma, University of Oxford
Markus Friedl (HEPHY Vienna)
Next generation rad-hard links
CPU1 Block Specifications
Introduction LOI Hardware activities and GBT Simulations
Overview of the project
DCH FEE 28 chs DCH prototype FEE &
Upgrade of the ATLAS MDT Front-End Electronics
Rich Occupancies and Bandwidth in Minimal Upgrade Layout
Front-end digital Status
Christophe Beigbeder/ ETD PID meeting
Presentation transcript:

Power Supply of Front-End Electronic in RICH/TORCH Upgrade Rui Gao, University of Oxford LHCb Upgrade Electronics Meeting 14 th April, 2011, CERN

RICH/TORCH Upgrade FE Electronics New devices: Hamamasu R7600/R11265 MaPMT, in RICH, and MCP in TORCH, Binary readout / TOF measurement, Higher readout rate, un-triggered readout, Use of GBT chipset, Use of DC-DC convertor. Cabling would be very similar to current RICH, Would re-use the current power supply module for RICH upgrade, same power supply for TORCH. 2 LHCb Upgrade Electronics, CERN, 14/04/2011

RICH Front End 64ch MaPMT Slave : 2x MAROC3 FPGA 16 e-port link to Master Master: 16 e-port 1xFPGA GBT chipset Scalable GBT transmitter DC-DC Convertor 2 MaPMT per slave 3 LHCb Upgrade Electronics, CERN, 14/04/2011 1/2/4/8/16 Slaves per Master DetectorMaPMTSlaveMasterGBT RICH RICH

Devices and Assumptions Hamamatsu R7600/R ch MaPMT, The MAROC3 64-ch, 250mW, Rad-hard or tolerant FPGA, 300mW, Discretes, 100mW per board, GBT user bandwidth 2.5~3.2Gbps, GBTX-1.5W, GBLD – 380mW, GBTIA-123mW, GBTSCA – unknown. Scalable GBT interface, primary GBT has both trans. and recv., add-on GBT has trans. only. Assumption Ave. Occupancy 1% ! 4 LHCb Upgrade Electronics, CERN, 14/04/2011

RICH Voltages and Currents Hopefully never need 3.3v, The Actel rad-hard ProASIC3E use 1.5v core voltage, no need for 1.2v, Radiation not so bad – comments? VoltageDeviceEst. Current (mA) Slave/Master 1.2vFPGA (core), e-port drive & receiver 100 / vGBTX None / vFPGA I/O, GBTIA, GBLD, GBTSCA, Flash RAM, MAROC3 400 / v“Legacy” device s, FPGA I/O 20 / 20 5 LHCb Upgrade Electronics, CERN, 14/04/2011

RICH Power Consumption by Device Slave – 1379mW, Master 3084mW 6 LHCb Upgrade Electronics, CERN, 14/04/2011

RICH Power Consumption by Voltage Logic power only. 7 LHCb Upgrade Electronics, CERN, 14/04/2011

RICH Summary 16MaPMT (1024ch)/ GBT, need simulation results, RICH1 1kW, RICH2 2.2kW 4 Supply voltages, minimum 2. 8 LHCb Upgrade Electronics, CERN, 14/04/2011

TORCH Current baseline design 1cm-thick quartz plate at z=12m Rectangular quartz block: 7.44m wide in x (124 photodetectors each side) 6.12m high in y (102 photodetectors each side)... for a total of 452 photodetectors Square hole for beampipe in the center (26cm x 26cm) with mirrored edges Mirrored surfaces have reflectivity 0.9 Beampipe hole Quartz block Quartz standoff (detail on next slide) 7.44m 6.12m Still proof-of-concept work: 9 LHCb Upgrade Electronics, CERN, 14/04/2011

TORCH Front End MCP Slave : 2x TDC FPGA e-port link to Master Master: 4x e-port 1xFPGA 2 GBT chipsets Scalable GBT transmitter DC-DC Convertor 4 Slaves per MCP 198 MCP 792 Slaves 198 Masters GBT 10 LHCb Upgrade Electronics, CERN, 14/04/2011

Proof of Concept TORCH Front End 11 LHCb Upgrade Electronics, CERN, 14/04/2011

Devices and Assumptions Burle-Photonis XP85022 or customised 128x8ch MCP, The “Perfect TDC” 128-ch with analogue input stage (amplifier and discriminator), 6ps, 2W, Rad-hard or tolerant FPGA, 300mW, Discretes, 200mW per board, GBT user bandwidth 3.2Gbps, GBTX-1.5W, GBLD – 380mW, GBTIA-123mW, GBTSCA – unknow. Scalable GBT interface, primary GBT has both trans. and recv., add-on GBT has trans. only. Assumption Ave. Occupancy 0.5% ! 12 LHCb Upgrade Electronics, CERN, 14/04/2011

TORCH – Voltage and Current VoltageDeviceEst. Current (mA) Slave/Master 1.2vFPGA (core), e-port drive & receiver 100 / vGBTX x 2 None / vFPGA I/O, GBTIA, GBLD, GBTSCA, Flash RAM, TDC 1750/ v“Legacy” device s, FPGA I/O 20 / 20 Hopefully never need 3.3v, TDC may need “clean” analogue 2.5v, The Actel rad-hard ProASIC3E use 1.5v core voltage. 13 LHCb Upgrade Electronics, CERN, 14/04/2011

Power Consumption – by Device Slave – 5641mW, Master – 5794mW 14 LHCb Upgrade Electronics, CERN, 14/04/2011

Power Consumption – by Voltage Logic power only 15 LHCb Upgrade Electronics, CERN, 14/04/2011

Summary - TORCH 198 MCP – FE assembly, each gives 30W, 6.1kW in total 400 GBT, 4 Supply voltages, min 2. Simulation needed, According to Mat’s simulation result: 9GBT/MCP, 50W/ MCP, 1800 GBTs, 10kW. 16 LHCb Upgrade Electronics, CERN, 14/04/2011

Thanks!

Backup Slides 18 LHCb Electronics Upgrade, CERN, 14/04/2011

Commercial Rad Hard DC-DC Module An example: VPT-0510S ▫3.5-7v input output, 33w max ▫84-94% efficiency ▫100krads 19 LHCb Electronics Upgrade, CERN, 14/04/2011