Financial Management for Africa Centers of Excellence Project Presented by Patrick Umah Tete, World Bank on May 20, 2014 during the launch of the project.

Slides:



Advertisements
Similar presentations
Karnataka Watershed Development Project Financial Management Arrangements.
Advertisements

1 IFAD PROJECTS FINANCIAL MANAGEMENT SEMINAR NAIROBI, KENYA October 2008.
The First ASOSAI_EUROSAI Joint Seminar on “Challenges for ensuring transparency and accountability in public financial management ” Country Paper by the.
ICGFM 19th Annual Conference & Training; May 2005 Miami, Florida (USA) Public Sector in Bosnia and Herzegovina ENHANCEMENT OF INTERNAL CONTROL SYSTEMS.
PUBLIC SECTOR INTERNAL AUDIT IN THE REPUBLIC OF LITHUANIA Mr. Jonas Vaitkevičius Head of Internal Audit and Financial Control Methodology and Monitoring.
Disbursement Linked Indicator Approach. Origin Aim: To achieve better results Respects institutional autonomy and leadership, and still align institutional.
The Trade Finance Bank for Africa An overview of Afreximbank’s Approach to Corporate Governance Issues Presentation by Mr. George ELOMBI Executive Secretary.
Compliance Policy & Procedures An Overview for Staff Prepared by MSM Compliance Services Pty Ltd.
Yaoundé, November Presented by: Mamata Teindrebeogo, Amadou Doudou Seck World Bank.
TEMPLATE PRESENTATION BY THE CHAIR OF THE WORKING GROUP TO CONDUCT THE TECHNICAL REVIEW OF THE BUDGET FEBRUARY, 2015 QMPR.
Michael MARTINDec 16 th,2008 The role of the Austrian Court of Audit (ACA) in the system of the public budgeting program.
05/31/2012 Page 1 Financial Management: Timekeeping.
1 Portfolio Committee on Home Affairs Presentation on Internal Audit 19 April 2013 Building a New Home Affairs.
Use of Country Systems in Europe and Central Asia Use of Treasury System for implementation of Bank-financed projects.
Regional Accreditation Workshop For Latin America & Caribbean Region Panama City, Panama th Nov, 2011.
Understanding Financial Management
COST (European Cooperation in Science & Technology) An Introduction to the COST Grant System Dr. Mafalda Quintas (TD Science Officer) Ms. Andrea Tortajada.
Revitalization of the Long Beach City Auditor’s Office The First 90 Days and Beyond Laura Doud, City Auditor Presented to Long Beach Business Journal November.
Page 1 Presentation to the Portfolio Committee on Tourism Fundamentals of effective Internal Control 21 July 2010.
Presented by Patrick Umah Tete, World Bank on May 20, 2014 during the launch of the project in Abuja, Nigeria Financial Management for Africa Centers of.
City of Tshwane GDS August Reputation promise/mission The Auditor-General of South Africa has a constitutional mandate and, as the Supreme.
Matching Grants. Address humanitarian conditions that benefit a community in need Direct Rotarian involvement Match at least two countries (host and international)
Overview on Fiduciary Aspects, Procurement and Audit IFAD India Country Office.
World Bank Institute Regional Workshop for Anglophone Africa on Auditing and Financial Accountability Addis Ababa KEY ISSUES IN CREATING AN EFFECTIVE INTERNAL.
FINANCIAL MANAGEMENT & GOOD GOVERNANCE IN PF
The Role of Parliament in the budget process. Overview Actors in the budget process Stages in the budget process Budgeting for the medium term.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
International Symposium on the changing role of Parliament in the budget process: Experiences from PUIC Countries and EU Member States Cooperation between.
Relationship: PAC's, SAI's and Accountant General in Improving transparency and accountability process Contributions for discussion from Mozambique National.
ZHRC/HTI Financial Management Training Session 5: Development Partner Relations and I-TECH Per Diem Policies.
KENYA TOWA Project Governance and Anticorruption Financial Management Issues Fiduciary Forum 2008.
I C A S A Annual Report Supplementary Presentation Presented by Dr Stephen Mncube Chairperson, Councillors, CEO and CFO October 2012 Parliamentary.
University of Minnesota Internal\External Sales “The Internal Sales Review Process” An Overview of What Happens During the Review.
Managing Chapter Funds Brent Woods, Esq., CAE, SPHR NIGP Executive Director for Business Operations and Finance.
DAY 1: OVERVIEW The nature of internal auditing
Financial Management 1. What is Financial Management ? Managing of Financial Resources Optimum utilisation of resources Utilisation of funds for the right.
April Why a New Instrument? Change in client demand: Clients want Bank support for government’s own programs and increased focus on results. This.
ESTABLISHING A PERFORMANCE MANAGEMENT SYSTEM A Paper by Harry Hatry and Ritu Nayyar-Stone Presented by Joel Turkewitz.
SCOPA 23 September 2003 National Treasury. PFMA IMPLEMENTATION NATIONAL TREASURY r Accreditation of training courses r Roll-out of large-scale training.
Page 1 The statutory framework for financial oversight Select Committee on Finance, 13 April 2010 Annexure B.
Page 1 Portfolio Committee on Water and Environmental Affairs 14 July 2009.
HSAB Audit Findings Addressed Lisa Tennyson, Grants Administrator OMB July 2012.
MTCP 2 PROJECT IMPLEMENTATION MANUAL: Overview of Project Planning, Budgeting, Monitoring & Evaluation (PBME) and Governance.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Technical and Advisory Meeting for Center Leaders of African Centers of Excellence “Achieving Sustainable Development through Transformation of Higher.
Financial Management for Africa Centers of Excellence (ACE II) Project Presented by Patrick Umah Tete, World Bank on October 25, 2016 in Nairobi, Kenya.
PFM Advisor East AFRITAC
Introduction/Background Aim of the assessment was to assess the impact of the 3 institutions MOHCDGEC, PO-RALG and MOFP in the flow of funds from national.
Implementation of the IPS MDTF
Sound Financial Management
Financial Management for Africa Centers of Excellence Project Presented by Patrick Umah Tete, World Bank on May 20, 2014 during the launch of the project.
PROGRESS REPORT ON IMPLEMENTATION OF THE PUBLIC FINANCE MANAGEMENT ACT
Financial Management for Africa Centers of Excellence (ACE) Project Presented by Patrick Umah Tete, World Bank on November 17, 2016 in Abidjan.
Chief Financial Officer
Financial Management for Africa Centers of Excellence (ACE II) Project Presented by Patrick Umah Tete, World Bank on April 27, 2017 in Addis Ababa.
Financial Management for Africa Centers of Excellence Project
Presentation on the Joint Standing Committee on Financial Management of Parliament 07 September 2016.
PEFA 2016 Slides selected from the training materials of the PEFA secretariat.
State Beef Council Reviews Monitoring of QSBC expenditure compliance
SAPS Audit Committee 26 October 2016.
April 2011.
MCA-MALI FOSTERS GOOD GOVERNANCE & TRANSPARENCY
PEFA 2016 Slides selected from the training materials of the PEFA secretariat.
Budget Management and Financial Accountability: Overview
Presentation to the Portfolio Committee - Labour
30 January 2014 Department of Agriculture, Forestry and Fisheries (DAFF) Briefing to the Portfolio Committee.
Africa Centers of Excellence Project Financial Management
Africa Centers of Excellence (ACE II) Project Financial & Disbursement Management NAIROBI, May 13 14,2019.
Audit.
Portfolio Committee on Communications
Presentation transcript:

Financial Management for Africa Centers of Excellence Project Presented by Patrick Umah Tete, World Bank on May 20, 2014 during the launch of the project in Abuja, Nigeria

Overview of the session What is good Financial Management Practice for an ACE? Submitting Withdrawal Applications Project Implementation Plan Financial Management Contents Addressing ACE Financial Management Gaps Benefiting from Financial Management Disbursement Linked Indicators (DLIs)

Good FM Practice for ACE Have a work plan that shows how you plan to use ACE funds. Have a budget which costs the annual work plan. The budget should be approved before the year of its operation and monitored at least every quarter comparing actual expenditure with the budget and taking action on any significant variances. Accounts should be prepared monthly and every quarter, you need to send an Interim Financial Report to the Ministry of Education and World Bank within 45 days after the end of the quarter. Having a computerized accounting information system is an advantage compared to a manual accounting system as accounts are prepared efficiently with minimal errors.

Good FM Practice for ACEs Compliance with International Public Sector Accounting Standards or International Financial Reporting Standards is highly recommended. Having a good Financial Management Manual, Operations Manual and Project Implementation Manual provides financial discipline as it defines the mode of operation. Having an internal audit department that audits the ACE regularly based on a risk based approach and writes reports that are acted upon by management is a very strong internal control system. Having an audit committee made up of non executive members and meets at least every quarter to follow up on both internal and external audit issues and actions taken by management is also a very strong internal control system.

Good FM Practice for ACEs Regularly submitting withdrawal applications to the Bank to ensure the ACE is well funded to operate effectively. Having the annual financial statements prepared within 3 months after the end of the financial year and submitting them for audit. Appointing the external auditors in time to conduct the audit or communicating to the Supreme Audit Institution to plan for the audit is highly recommended. Submitting the audit report to the Ministry of Education and World Bank within 6 months after the end of the financial year.

Submitting Withdrawal Applications Do read the Disbursement Letter – example shared. Submit withdrawal application as guided by the Disbursement Letter, Project Appraisal Document and Project Implementation Plan. Accounts supporting disbursement reimbursements should be supported by Eligible Expenditure Programs (Salaries for ACE staff plus operating expenditure). During implementation, withdrawal applications should be submitted with interim financial reports showing how ACE funds are being used (comparing actual expenditure with the budget). Example to be shared. Should you have any challenges submitting withdrawal applications please get in touch asap with the Country Financial Management Specialist at the World Bank.

Project Implementation Plan – FM Contents It should refer to the accounting policies and procedures in the University or ACE or Government FM Manual (Institutional Manuals) to be used for the project . It should cover the gaps between the existing institutional FM Manuals and the Financing Agreements with the World Bank. These areas include: Detailing how the ACE funds (US$8 million) will be used. Should include an account for ACE revenue generated. How the financing covenants on ensuring satisfactory FM systems are maintained through out the project, Interim Financial Reports and annual audit reports are submitted on time to the Ministry of Education and World Bank will be complied with. Describe in detail the funds flow arrangements and the signatories for the ACE project. Reference to the PAD to be made. How ACE FM action plans will be addressed. How FM DLIs will be implemented.

Addressing ACE FM Gaps

Addressing FM ACE Gaps

Addressing ACE FM Gaps

Benefiting from FM DLI#3 These are: ACEs submitting timely withdrawal applications supported by financial reports showing how funds have been utilized. Universities under the university council having functioning audit committee that will amongst other assignments follow up audit issues related to the ACE. Universities having functioning internal audit units that will support the ACEs. ACEs publishing annual work plans, budgets, interim financial reports and audited reports on their websites to promote transparency and accountability.

Thanks for listening to me. Email contact: pumahtete@worldbank@org