Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.

Slides:



Advertisements
Similar presentations
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Advertisements

1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque.
EXPERIENCE FROM KEK Norihito Ohuchi 2009/11/9-101 Workshop on cryogenic and vacuum sectorisations of the SPL.
CRYO PIPING & INTER-MODULE CONNECTIONS Yun He, Daniel Sabol, Joe Conway External Review of MLC Daniel Sabol, MLC External Review 10/3/2012.
Cryomodule requirements Hitoshi Hayano, KEK for CFS consideration Asian Single Tunnel Design June 1-2,2010.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Heat load study of cryomodule in STF
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Stress and cool-down analysis of the cryomodule Yun He MLC external review October 03, 2012.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
Stress and Cool-down Analysis Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
Mechanical Design of Main Linac Cryomodule (MLC) Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Tim O’Connell, Ralf.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
What’s Inside a TESLA Cryomodule Tom Peterson Proton Driver Meeting February 9, 2005.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
S1 global: thermal analysis TILC09, April 19th, 2009 Serena Barbanotti Paolo Pierini.
Check the component list with FNAL solid model Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Overview of Main Linac Cryomodule (MLC)
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Overview of Main Linac Cryomodule (MLC) Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
Cryomodule Assembly Facility (CAF) at Fermilab Tug Arkan (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Ralf Eichhorn Cornell on behalf of Paul Bishop, Benjamin Bullock, Brian Clasby, Holly Conklin, Joe Conway, Brendan Elmore, Fumio Furuta, Andriy Ganshyn,
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
CERN – Zanon discussions
Stress and cool-down analysis of the cryomodule
at STFC Daresbury laboratory
HFM Test Station Main Cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Sensors in the S1-G Cryomodules (Updated )
High Q Cavity Operation in the Cornell Horizontal Test Cryomodule
Summary of the checking items of the Module-C design
Alignment of Main Linac Cryomodule (MLC)
Cryomodule Assembly Plan
CEPC-650MHz Cavity Cryomodule
CRYOMODULE FINAL ASSEMBLY
Magnetic shielding and thermal shielding
SNS PPU Cryomodule Space Frame
CRYOMODULE FINAL ASSEMBLY
Presentation transcript:

Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012

10/3/2012Yun HE, MLC External Review2 Outline  Requirements and challenges  Differential thermal contractions Material properties Axial differential thermal contractions among components at cold Beamline vertical thermal contraction at cold  Dealing with differential thermal contractions Position change between vacuum vessel and coldmass Position change between HGRP and beamline Position change between 40K shield and coldmass  Assembling steps

10/3/2012Yun HE, MLC External Review3 Requirements and challenges Requirements  Allowable transverse offset (x,y): 2mm for cavities, 1.6 mm for quads Allowable pitch: 1.5 mrad (1.2 mm over the length of cavity)  Alignment is performed at room temperature  Tolerances maintained throughout thermal cycling, vacuum pumping and transport Challenges  Different material coefficients of thermal expansion among interfacing components

10/3/2012Yun HE, MLC External Review4 Differential thermal contractions Temperature dependent material properties Axial differential thermal contractions among components at cold Beamline vertical thermal contraction at cold

Table from Norihito. Ohuchi’s talk, SRF2009 Table from Carlo Pagani’s paper, SRF2005 Material properties -- coefficient of thermal expansion MaterialTemp.∆L/L G10 warp300K- 2K-0.256% SS K-2K-0.319% Al300K-40K-0.350% Ti300K-2K-0.172% Nb-Ti300K-2K-0.169% Data from NIST Used material data from NIST for calculations Most of these values are higher than TTF used

10/3/2012Yun HE, MLC External Review6 Axial differential thermal contractions among components at cold Fixed point 9.8 m, vacuum vessel at room temperature 9.5 mm -- HGRP 19 mm – thermal shield 8 mm – beamline Axial displacement due to thermal contractions of materials at cold ComponentsMaterialTemperature∆L/L∆L HGRPTi300K-2K0.172%17 mm Thermal shieldAl K-40K0.350%34.5 mm Beamline (cavity)Nb/SS300K-2K0.146%14.5 mm 7.5 mm -- HGRP 15.5 mm – thermal shield 6.5 mm – beamline Sliding post 1 mm thermal contraction – cavity LHe vessel 0.8 m

10/3/2012Yun HE, MLC External Review7 Vertical beamline displacement at cold 500 mm 140 mm ComponentsMaterialTemperature∆L/L∆L HGRP/LHe vessel Ti300K-2K0.172%0.9 mm PostG10300K-2K0.256%<0.3 mm 40K 5K Moved up by ~1.2 mm

10/3/2012Yun HE, MLC External Review8 Dealing with differential thermal contractions Position change between vacuum vessel and coldmass Position change between HGRP and beamline Position change between 40K shield and coldmass

 Longitudinal: middle post is fixed, while the side posts are slid able  Vertical: Bellows section allows displacements of beamline at cold Beamline port on end flange of warm-cold transition will be higher by 1.2 mm, so the bellows will be bent at room temperature  Coupler design allows a transverse offset up to10 mm Couplers will be offset at room temperature thus will be straight at cold 9 Brass bushing allows side post to slide on vacuum vessel top flange Replace it with roller bearings? Dealing with position change between vacuum vessel and coldmass 10/3/2012Yun HE, MLC External Review

10/3/2012Yun HE, MLC External Review10  Cavity flexible support Allows 1 mm displacement  A bellows section in chimney of cavity  Key alignment of component supports Allows beamline components to slide longitudinally relative to HGRP  Bellows in HOM absorbers HOM loads are made of stainless steal but the bellows in the HOM loads will take the difference between the length changes of the cavities and HOM loads and the HGRP  Alignment results from Injector Cryomodule WPM measurements Cavity string was aligned to 0.2 mm after cool-do wn Dealing with position change between HGRP and beamline

11 Fixed post Sliding post Left/right posts can move relative to shield in axial direction during cool-down At room temperature, side post is  offset to vac vessel port center  Concentric to shield opening At cold, side post is moved due to HGRP contraction, became  concentric to vac vessel port center  Slightly offset to shield opening center 10/3/2012Yun HE, MLC External Review Dealing with position change between shield and cold mass (posts)

10/3/2012Yun HE, MLC External Review12 Assembling steps

10/3/2012Yun HE, MLC External Review13 Assembling steps -- assemble beamline, weld 2K-2 phase line  Assemble beamline in the clean room on rail support;  Leak check and keep beamline in UHV Level components in horizontal direction (Roll) with sine-plate within ”/10”; No need to align them in other directions as bellows in HOM absorbers allow for adjustment once the beamline string is mounted to precision machined HGRP supports  Weld 2K-2 phase pipe to chimneys of cavity/magnets LHe vessels;

10/3/2012Yun HE, MLC External Review14 Assembling steps -- assemble beamline, mount to HGRP/posts  Mount beamline string onto HGRP which is supported by three posts on assembly frame;  Install tuners Connect supports Weld chimney between HGRP and 2K-2 phase pipe

10/3/2012Yun HE, MLC External Review15 Assembling steps – insert cooling lines, instrumentation wires,40K shield  Install 2K, 5K cooling pipes;  Install 40K shield upper sheets and 40K cooling pipes;  Connect jumpers to 5K, 40K intercepts;  Instrumentation wires  Install 40K shield lower sheets;  Magnetic shields;  MLI

10/3/2012Yun HE, MLC External Review16 Assembling steps – insert cold mass into vacuum vessel  Rail cold mass into vacuum vessel;  Mount alignment brackets to support post;  Jack up brackets to relieve the cold mass weight from rails;  Align post position with respect to the vacuum vessel fiducial points Rails for cold mass insertion Alignment bracket Vacuum vessel reference arm, with precision machined conical centering surface for a TH-sphere or reflector

Position of posts can be adjusted via rods/screws 1710/3/2012Yun HE, MLC External Review Assembling steps – align cold mass to vacuum vessel references Adjust positions of posts relative to vacuum vessel reference arms; Lock the position of middle post and the position of side posts in horizontal direction; Install cryogenic valves; connections of valves to pipes Support post Support bracket Reference surfaces for TH spheres