7-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 7 Project Time Management.

Slides:



Advertisements
Similar presentations
Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Advertisements

Developing a Project Plan CHAPTER SIX Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 6: Developing a Project Plan
Project Management 6e..
Chapter 6 Time Planning & Networks
Developing the Project Plan
Where We Are Now Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved.
Project Management Project Management
Developing a Project Plan
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Developing a Project Plan
Advanced Project Management - CPH
1 University of Wales Bachelor of Science (Industrial Engineering and Management) Year 3 Copyright © 2012 MDIS. All rights reserved.Section
إدارة المشروعات Projects Management
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Chapter 4: Schedule, cost, and situation analysis (pt. 1) ISE 443 / ETM 543 Fall 2013.
Eleanor Roosevelt High School
Contract Time and Claims Construction Engineering 380.
9-1 Project Scheduling: Networks, Duration Estimation, and Critical Path Chapter 9 © 2007 Pearson Education.
Project Scheduling: Networks, Duration estimation, and Critical Path.
MGMT 483 Week 8 Scheduling.
9-1 Project Scheduling: Networks, Duration Estimation, and Critical Path Chapter 9 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
5/4/20151 NETWORK SCHEDULING TECHNIQUES. 5/4/20152 Network Diagrams  PMI defines the scheduling process as: “the identification of the project objectives.
Project Development Scheduling and Probability of Completion.
Project Scheduling: Networks, Duration Estimation, and Critical Path
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 15.
Project Scheduling: Networks, Duration estimation, and Critical Path
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Project Management. What is a Project? One Time Effort Identifiable Start/End Points Specific Objectives Multiple Tasks Resources from Across the Organization.
Importance of Project Schedules
Project Time Management
Project Time Management
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Where We Are Now. Where We Are Now Developing the Project Plan The Project Network A flow chart that graphically depicts the sequence, interdependencies,
Time Planning and Con trol Precedence Diagram.  Precedence Diagramming  An important extension to the original activity-on-node concept appeared around.
HIT241 - TIME MANAGEMENT Introduction
Software Project Management Task Sequencing Activity Sequencing Concepts PERT charts Critical Path Analysis.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6.
3.1 NETWORK Roger D. H. Warburton Determine Activity Dependencies & Critical Path © Kanabar / Warburton,
McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Developing a Project Plan Chapter 6.
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
PMP, CAPM, PgMP, PMI-SP, PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services.
Advanced Project Management Project Time Management Ghazala Amin.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Project Management Project Planning. PLANNING IN PROJECT ENVIRONMENT Establishing a predetermined course of action within a forecasted environment WHY.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
 Chapter 6: Activity Planning – Part 3 NET481: Project Management Afnan Albahli.
 Chapter 6: Activity Planning – Part 2 NET481: Project Management Afnan Albahli.
PROJECT MANAGEMENT week 5
PROJECT MANAGEMENT week 7
Chapter 4 MIS Project Management Lecturer Sihem Smida Sihem Smida Developing a project plan.
The Network Diagram. When to Do What?  Carrying out one activity after the other may result in project completion, but it will take the longest possible.
Project Management MGT 30725
& Urban Planning Civil Engineering Department
Project Management -- Developing the Project Plan
Project scheduling Chapter 10 Copyright ©2016 Pearson Education, Inc.
Chapter 6: Project Time Management
Developing a Project Plan
Developing a Project Plan
Project Scheduling: networks, duration estimation, and critical path
Project Time Management
Project Time Management
Project Time Management
Project Time Management
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
Project Time Management
Presentation transcript:

7-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 7 Project Time Management

7-2 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Developing the Project Schedule The project schedule is a chart that graphically depicts the sequence, interdependencies and start and finish times of the project. The project schedule also depicts the activities to enable the identification of the critical path. The project schedule allows for tracking time variances when the project is being executed.

7-3 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e From Work Package To Network

7-4 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Activity-on-Node (AON) Fundamentals A = Sequences B = Burst C = Merge D = Parallel 6–46–4

7-5 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Sequence the Activities

7-6 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Add the Durations

7-7 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Carry out the Forward Pass Maximum of Preceding Activities

7-8 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Carry out the Backward Pass Minimum of Succeeding Activities

7-9 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Calculate the Slack or Float

7-10 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Identify the Critical Path Free slack example

7-11 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Identify the Critical Path (cont.) The longest path through the activity network that allows for the completion of all project-related activities. The shortest expected time in which the entire project can be completed. Delays on the critical path will delay completion of the entire project.

7-12 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Extended Network Techniques to Come Closer to Reality Laddering Under the standard finish-to-start relationship, when an activity has a long duration and will delay the start of an activity immediately following it, the activity can be broken into segments. The network can be drawn using a laddering approach so the following activity can begin sooner and not delay the work.

7-13 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Example of Laddering Using Finish-to-start Relationship

7-14 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Extended Network Techniques to Come Close to Reality (Cont.) Lag A lag directs a successor activity to be delayed. Lead A lead allows acceleration of a successor activity.

7-15 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Hammock Activities An activity that spans a segment of a project. Duration of hammock activities is determined after the network plan is drawn. Hammock activities are used to aggregate sections of the project to facilitate getting the right amount of detail for specific sections of a project. 6–15

7-16 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Common Gantt Chart Relationships Moving the AON to a Project Schedule (See following slides)

7-17 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Finish-to-Start Relationship (FS)

7-18 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Start-to-Start Relationship

7-19 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Finish-to-Finish Relationship

7-20 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Air Control Project— Gantt Chart

7-21 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Options for Accelerating Project Completion When resources are not constrained… Crashing The most common method for shortening project time is to assign additional staff and equipment (resources) to activities (crashing the project schedule) Outsourcing project work Scheduling overtime Do it twice, fast and then correctly

7-22 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Options for Accelerating Project Completion (cont.) When resources are constrained… Fast tracking Sometimes it is possible to rearrange the logic of the project network so that critical activities are done in parallel (concurrently) rather than sequentially Critical-chain project management Reducing project scope Compromising quality

7-23 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Options for Accelerating Project Completion (cont.) When cost is the issue… Reduce project scope Have the owner take on more responsibility Outsource activities or the whole project Brainstorm cost-savings options

7-24 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Resource Allocation Methods

7-25 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Project Scope Integration

7-26 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e Key Terms activity Activity-on-Arrow (AOA Activity-on-Node (AON) burst activity concurrent engineering crashing critical path dangler fast-tracking free slack Gantt chart hammock activity heuristic laddering lag relationship lags levelling merge activity parallel activity parallel/sequence activities path resource-constrained project resource-constrained scheduling resource smoothing sensitivity slack/float (total) splitting time-constrained project