Colorado: Planning and Environmental Linkages Integrated Planning Work Group Peer Exchange Washington, DC – January 27, 2009.

Slides:



Advertisements
Similar presentations
Welcome to Site Management Amy Thompson. Agenda I.Foundation Introductions Setting the Session Agenda II.Site Management Principles III.Site Management.
Advertisements

Pinellas by Design: A Blueprint for Updating the Countywide Plan Pinellas Planning Council May 18, 2011.
Transportation Planning Capacity Building Indiana MPO Conference October 15-17, 2003.
Opportunities Exist to Strengthen FHWAs Coordination Guidance and Oversight of the Tribal Transportation Program October 30, 2013.
Transportation Planning for Federal Land Management Agencies (FLMAs) SAFETEA-LU Training Webcast April 2006 SAFETEA-LU Training Webcast April 2006.
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
USDA Forest Service Research and Development Tribal Engagement Roadmap Consultation - January 10 to May 11, 2014 [DATE of PRSTN]
NEPA ASSUMPTION SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM.
HUD-VASH Case Management System Paul Smits, MSW Associate Chief Consultant, Roger Casey, PhD Director, Grant and Per Diem Program.
1 ITRC Mission ITRC is A state-led coalition working together with industry and stakeholders to achieve regulatory acceptance of environmental technologies.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Management.
Surface Transportation project delivery program
High Growth Counties: Opportunities for Pinal County Pinal County Comprehensive Plan Curt Dunham AICP Partners for Strategic Action, Inc. Comprehensive.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Western States Energy & Environment Symposium October 27, 2009.
The Public Health Revitalization Act A look at what this means for you and examples from Washington State. Michael Wallingford, MPA, REHS Colorado Directors.
Environmental Justice: Policies, Guidance, and Answers to Frequently Asked Questions FTA Region VII Civil Rights Training.
Certification/Qualification Program. Certification Program What is it? Who is involved? What should be considered? Where can a Certification Program work.
I n t e g r a t I n g C S S Practitioner Module 3 Module 3: CSS and Livability In Area Wide Planning.
Internal Auditing and Outsourcing
1 Cooperating Agency and Coordination Training Washington State Association of Counties Friday, November 22, 2013 Victoria Barr, Oregon/Washington State.
CTCN ORIGINS 2 COP 15 (Copenhagen): agreement to establish a “Technology Mechanism” COP 16 (Cancun): Technology Mechanism further elaborated (TEC and.
1 OAQPS Guidance on -- “Consulting with Indian Tribal Governments” November 28, 2007.
1 OAR Guidance on -- “Consulting with Indian Tribal Governments” May 21, 2012.
Overview of SAFETEA-LU Sections 6001, 6002, 3005, and 3006 TRB January 13, 2008 Shari Schaftlein FHWA Project Development & Environmental Review Washington,
Coordination of Section 106 and Long Range Planning July 2014 NCHRP 25-25/Task 87.
I Larry Heil, FHWA October 15, 2003 Environmental Streamlining.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Oregon Jobs and Transportation Act Section 18 Bill Ryan and Jennifer Sellers Geo-Environmental, ODOT Tech Services.
ADOT Multimodal Planning Division Planning Assistance for Rural Areas (PARA) Program Overview December 4, 2013.
Planning and Environment Linkages: Overview and Examples TRB Workshop on Environmental Analysis January 13, 2008 Michael Culp and Rob Ritter FHWA Office.
Report on the Evaluation Function Evaluation Office.
Planning and Environment Linkages Program OARC January 22, 2010 Noel Mehlo – FHWA Ohio Division.
ENVIRONMENTAL JUSTICE: FROM PLANNING TO PROJECT Ohio Planning Conference July 16, 2014.
Shelley Row, P.E. Director, Office of Transportation Operations FHWA National Meeting May 8, 2000 Washington, D.C.
The Community Collaboration Coaches Roles, Strategies, and Tools.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Measure Update.
Andrew Winga, P.E. – WisDOT Project Manager.  Background on numerous Transportation Studies  What is a Planning & Environment Linkage Study  Problem.
Linking Planning & NEPA Overview Mitch Batuzich FHWA Texas Division FHWA Texas Division April 17, 2007.
May 5, 2007 AASHTO Standing Committee on Highways.
Guide for Rural Local Officials Evaluating Your Input into the Statewide Transportation Planning Process Developed by the National Association of Development.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Sierra Water Workgroup Water Summit Kings Beach, California June 11, 2013 Barry Hill, Hydrologist Pacific Southwest Region USDA Forest Service.
PEL 101: The Tools for Adopting and Implementing a PEL Approach August 20, 2009.
What is a Link? Planning and Environmental Linkages for 2014 and Beyond Carmen M. Stemen, MUP Planning & Environment Specialist FHWA Ohio Division
The Safety Problem Is Global The Safety Solution Is Local and Personal Business of Saving Lives.
SAFETEA-LU: Environmental Provisions for Transportation Planning Michael Culp FHWA Office of Project Development and Environmental Review
Environmental Assessment in British Columbia Forum of Federations Conference September 14, 2009.
Center for Environmental Excellence by AASHTO September 29, 2007 AASHTO Standing Committee on Highways.
Section 4(f)/6(f) Categorical Exclusion Training Class.
Cooperating Agency Status Presented by Horst Greczmiel Associate Director, NEPA Oversight Council on Environmental Quality Washington, DC September 14,
SPC Advisory Committee Training - TAC Fall 2015 Institutional Research President’s Office 1 Abridged from the SPC Advisory Committee Training on October.
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
The Kern Regional Transportation Plan A Vision and Guidebook for Kern County in 2025.
Planning & Environment Linkages (PEL) July 20, 2011 PEL 101: The Tools for Adopting and Implementing a PEL Approach.
C06B Implementing Eco-Logical Kristin Schuster Michigan Department of Transportation.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
Puget Sound Partnership Action Agenda: Roadmap to Completion.
Raising the Bar: Improving the Roles of the State, MPO, and FHWA in Tribal Consultation Tribal Transportation Planning, Partnering and Consultation James.
Highlights of the “Procedural Guidance” Results of transportation planning process “inform” the NEPA process. Format of planning products for inclusion.
Director’s Order 12 contains information concerning review of other agency proposals.
Office of Major Project Development (OMPD) Overview November 2015.
Section 4(f) Categorical Exclusion Training Class.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
First Things First Grantee Overview.
Task Force Activities We are working together on a new approach that identifies sources of PCBs and dioxins, directly applies a plan for reduction and.
Creating a P.L Plan.
Public Engagement During Scoping Peer Exchange
Presentation transcript:

Colorado: Planning and Environmental Linkages Integrated Planning Work Group Peer Exchange Washington, DC – January 27, 2009

SAFETEA-LU Consideration of potential environmental mitigation activities Consideration of potential environmental mitigation activities Consultation with resource, regulatory and land management agencies, and Tribal governments Consultation with resource, regulatory and land management agencies, and Tribal governments Transportation planning studies Transportation planning studies

PEL Concept Considerations in planning process and use decisions in NEPA later Considerations in planning process and use decisions in NEPA later Ecosystem vs. project perspective Ecosystem vs. project perspective Early and better coordination Early and better coordination Progression from just NEPA focus Progression from just NEPA focus

Benefits of PEL Common sense Common sense Early and continuous coordination with agencies Early and continuous coordination with agencies Better decisions result in: Better decisions result in: Environmental stewardship Environmental stewardship Financial stewardship Financial stewardship Ultimately save time, money and effort Ultimately save time, money and effort Relationship-building Relationship-building

History of PEL in Colorado STEP UP STEP UP Linking Planning and NEPA (LPN) On-line Training Linking Planning and NEPA (LPN) On-line Training LPN Guidance LPN Guidance Statewide Transportation Plan Process Statewide Transportation Plan Process CDOT PEL Program Manager CDOT PEL Program Manager PEL Corridor Studies PEL Corridor Studies FHWA PEL Questionnaire FHWA PEL Questionnaire

STEP UP – Environmental Streamlining New Planning Process: New Planning Process: Identify environmental issues early Establish early and continued involvement by resource agencies Create a better link between transportation, environmental, and land use planning Evaluate and rank projects using environmental data Web-based GIS Tool Web-based GIS Tool

Linking Planning and NEPA Training On-line training On-line training Provides guidance to integrate planning and NEPA Provides guidance to integrate planning and NEPA How to incorporate planning process elements into project- level environmental review How to incorporate planning process elements into project- level environmental review

CDOT LPN Guidance For use by CDOT staff and regional transportation planning partners For use by CDOT staff and regional transportation planning partners Addresses how data, analysis, and products from planning can be incorporated into NEPA Addresses how data, analysis, and products from planning can be incorporated into NEPA Meets SAFETEA-LU requirements Meets SAFETEA-LU requirements

Statewide Transportation Plan Process Developed Corridor Visions, Goals and Strategies Developed Corridor Visions, Goals and Strategies Environmental Forum with Resource Agencies Environmental Forum with Resource Agencies Environmental Tabs Environmental Tabs Resource Management Plans Resource Management Plans

CDOT PEL Program Manager Develop effective working relationships with FHWA, CDOT and MPOs Develop effective working relationships with FHWA, CDOT and MPOs Form the link between transportation planning and project delivery to advance NEPA analysis into the planning process Form the link between transportation planning and project delivery to advance NEPA analysis into the planning process Assure environmental data are available to planning staff and their consultants and are appropriately utilized and interpreted Assure environmental data are available to planning staff and their consultants and are appropriately utilized and interpreted Be available to furnish expertise and institutional knowledge Be available to furnish expertise and institutional knowledge

PEL Corridor Studies Arapahoe Road – Denver, 2007 Arapahoe Road – Denver, th Avenue – Denver, th Avenue – Denver, 2008 Parker Road – Denver, current Parker Road – Denver, current US 50 West – Pueblo, current US 50 West – Pueblo, current US 24 East – Colorado Springs, current US 24 East – Colorado Springs, current

FHWA PEL Questionnaire Consistent with 23 CFR 450 Appendix A Consistent with 23 CFR 450 Appendix A Submitted with PEL Study Document Submitted with PEL Study Document Consists of 13 Questions: Consists of 13 Questions: Corridor Vision/Purpose and Need Corridor Vision/Purpose and Need Range of Alternatives and Screening Criteria Range of Alternatives and Screening Criteria Agency and Public Coordination Agency and Public Coordination Resources Resources Relationship to Future NEPA Document Relationship to Future NEPA Document

Barriers Money Money Database development Database development Different perspectives between land use, transportation and environmental planning Different perspectives between land use, transportation and environmental planning Coordination with various disciplines (engineers, environmental, regulatory agencies, etc.) Coordination with various disciplines (engineers, environmental, regulatory agencies, etc.) Time and staffing Time and staffing Carry forward into NEPA Carry forward into NEPA

Statewide Environmental Forum Bring together Local Transportation Officials 10 rural areas 5 “urban” areas Resource and Regulatory Agencies Goal: Better understanding of the resources and issues Best meeting ever!

CDOT’s Statewide Environmental Forum

Results Question 1: Was this an effective tool for sharing information between agencies about programs and activities? 87% said yes. Question 2: Was there sufficient time for conversations? 30% said yes. A majority of evaluations requested between 5 and 15 minutes more for each conversation Question 3: Did you feel you were able to effectively communicate with other parties? 91% said yes. Question 4: Should CDOT host similar events in the future as transportation plans are developed? 89% said yes.

What’s Next? Developing a more refined process of moving from planning through NEPA Developing a more refined process of moving from planning through NEPA Ensuring that planning decisions are recognized in a NEPA study Ensuring that planning decisions are recognized in a NEPA study Education and outreach on planning process Education and outreach on planning process Current CO PEL efforts include: Current CO PEL efforts include: Partnering agreement with Transportation Environmental Resource Council (TERC) Partnering agreement with Transportation Environmental Resource Council (TERC) PEL web-based decision tool PEL web-based decision tool PEL training PEL training Charting CDOT transportation and environmental planning processes Charting CDOT transportation and environmental planning processes

Questions for You Success with alternatives elimination in planning? Success with alternatives elimination in planning? Moving into NEPA and how much is revisited? Moving into NEPA and how much is revisited? How much time between a planning study and NEPA? How much time between a planning study and NEPA?

FHWA letter responding to a PEL Study SUBJECT: 56 th Avenue: Havana Street to Pena Boulevard Planning and Environmental Linkages (PEL) Study Process Dear Mr. Mutz: This letter is in response to your request for FHWA concurrence regarding the Planning and Environmental Linkages (PEL) study initiative undertaken by the City and County of Denver, CDOT, and URS Corporation on the 56 th Avenue Corridor Study project. We appreciate and commend the efforts the team has undertaken to conduct this corridor planning study in a manner consistent with the FHWA PEL guidance which outlines a process similar to that required by NEPA. The benefits of this streamlining effort will undoubtedly be realized in terms of time and cost savings on future NEPA studies conducted within the corridor planning study limits. The completed PEL Questionnaire submitted to FHWA on December 16, 2008 provides a good summary of the work completed in PEL study and the information that will be needed once projects enter into the NEPA process…….

Colorado PEL Contacts Name/TitleArea Michelle Scheuerman – CDOT Planning Section Manager Statewide Planning us Tracey MacDonald - CDOT Statewide Planning Unit Manager Statewide Planning and STEP UP Sheble McConnellogue - PEL Program Manager CDOT PEL Program us Bill Haas - FHWA Metropolitan Transportation Planner CO PEL Program Stephanie Gibson - FHWA Environmental Program Manager Environmental Policy and PEL Questionnaire Suzette Mallette - NFRMPO Regional Transportation Planning Director STEP UP Alison Deans Michael USFWS/CDOT Liaison U.S. Fish and Wildlife/CDOT Liaison