Latest background observations in ALICE Latest background observations in ALICE A. Alici (INFN, Bologna), A. Di Mauro (CERN) LBS, 19/09/11.

Slides:



Advertisements
Similar presentations
Status on 62,63 Ni(n, ) Claudia Lederer Goethe University Frankfurt Cristian Massimi INFN Bologna.
Advertisements

Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Beam-plug under M2 and HCAL shielding studies Robert Paluch, Burkhard Schmidt October 9,
DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
Multiplicity analysis and dN/d  reconstruction with the silicon pixel detector Terzo Convegno Nazionale sulla Fisica di ALICE Frascati (Italy) – November.
June 9, Tetsuro Sekiguchi, KEK BNL-E949 Collaboration The E949 experiment The analysis The results Conclusions BNL, FNAL, UNM, Stony Brook Univ.
D. Elia, INFN BariALICE Offline Week - June Recent results from SPD beam test D. Elia, R. Santoro INFN Bari ALICE Collaboration - SPD Group.
Terzo Convegno sulla Fisica di ALICE - LNF, Andrea Dainese 1 Preparation for ITS alignment A. Dainese (INFN – LNL) for the ITS alignment group.
Francesco Noferini Centro Studi e Ricerche “Enrico Fermi”, Roma Bologna University & INFN Frascati Wednesday, 14 th November 2007 TOF contribution to the.
Beam Position Monitors MICE CM Harbin January, 2009.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Status on the VELO sensors in the vacuum chamber Gwen & Ray 08/14/2007.
Patrick Robbe, LAL Orsay, for the LHCb Collaboration, 16 December 2014
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
Jornadas LIP, Dez P. Martins - CFTP-IST The NA60 Silicon Vertex Telescopes Dimuon measurements Dimuon measurements Vertex telescope used in: Vertex.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
ALICE Trigger and Event Selection QA 1Kevin McDermott By: Kevin McDermott August 9, Michigan REU Student Program – Final Presentations.
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
Experimental background at the presence of pressure rise in RHIC Angelika Drees, Ubaldo Iriso-Ariz RHIC How to measure collision rates Vacuum and collision.
07-JUL-2003LEADE / JW1 Satellite bunches in the LHC Satellite “definition” Satellite luminosity Satellite detection & tolerances J. Wenninger AB/OP.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 8 March 2011 Time Meeting, BNL.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
Beam Background Simulations for HL-LHC at IR1 Regina Kwee-Hinzmann, R.Bruce, A.Lechner, N.V.Shetty, L.S.Esposito, F.Cerutti, G.Bregliozzi, R.Kersevan,
14 October 2010Eddy Jans 0 VELO-vacuum “problem” VELO Meeting On Sunday October 3 at 10h15 a sudden increase of a factor 6 of the pressure in the beam.
ALICE Condition DataBase Magali Gruwé CERN PH/AIP Alice Offline week May 31 st 2005.
V0L Hardware Status ALICE WEEK CERN, MARCH 2003 Ana Delia Becerril IFUNAM, México.
1 Status of the V0 electronics  Tests of photomultipliers  Signal treatment  Electronics  Milestones V0A V0C.
Cosmic Ray Run III Cosmic Ray AliEn Catalogue LHC08b 1.
ALICE Offline Week, CERN, Andrea Dainese 1 Primary vertex with TPC-only tracks Andrea Dainese INFN Legnaro Motivation: TPC stand-alone analyses.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
LHCf Report Takashi SAKO for the LHCf Collaboration 18-Dec-2009 CERN Main Auditorium.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
First measurements in Pb—Pb collisions at  s NN =2.76 TeV with ALICE at the LHC M. Nicassio (University and INFN Bari) for the ALICE Collaboration Rencontres.
Robert Cooper L. Garrison, L. Rebenitsch, R. Tayloe, R. Thornton.
W. Riegler, ECFA HL-LHC Experiment Workshop, Oct. 21st, 2014 The ALICE Upgrade.
Triple GEM Beam Test within PHENIX DC Upgrades Meeting 4/14/04 B. Azmoun PHENIX Brookhaven National Lab.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
Tomasz Malkiewicz T0 trigger and luminosity monitoring luminosity monitoring ALICE meeting at JYFL.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
Khaled Belkadhi (LLR-Ecole Polytechnique)1 DHCAL Test Beam Results using Full Train Reconstruction Khaled Belkadhi.
ALICE sensitivity to background and injection failures with the smaller aperture A. Di Mauro TREX meeting, 31/07/2014.
Summary of the technical stop activities on collimators (w17, 2012) O. Aberle – 07/05/12.
Heating and Outgassing from MKP- L Magnet M.J. Barnes & L. Sermeus Acknowledgements: M. Beck, H. Bartosik, G. Bregliozzi, C. Pasquino, G. Rumolo, L. Vega.
Gloria Corti, LHCb LHCb background on detector. Gloria Corti Page 2 Evaluating impact on experiment Increasing the inner coverage of the TT detector will.
DIS 2011, Newport News, April 2011Joakim Nystrand, University of Bergen 1 Small-x and forward measurements in ALICE Joakim Nystrand University of.
Pile-up vertex finding in heavy ion collisions
Time-zero evaluation using TOF, T0 and vertex detectors
Detector R&D Group Meeting MEMS Seismometer Development
Floating MD week 28 summary
Wednesday
Gamma-ray Large Area Space Telescope ACD Final Performance
Electron cloud & vacuum pressure observations: 2011 proton run
Charged particle production in Pb-Pb collisions at the LHC with the ALICE detector M Floris (CERN) for the ALICE Collaboration HP2012 – May 28, 2012.
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Summary: Workshop on CMS Beam Conditions, Radiation Monitoring and Luminosity Systems Oliver Stein, May 2013, CERN.
Update on ALICE-LHC interfaces & BCM
TDI with large gaps V. Baglin (21/10/11) CERN TE-VSC, Geneva
Summary of Week 16 G. Arduini, J. Wenninger
Phase 2 R&D – Brief Introduction –
Scrubbing progress - 08/12/2012
IP8 aperture measurements (07:30-10:30)
KEK, 阪大RCNPA, 阪大理B, 京大理C, 原研先端研D,
Tuesday 20 September 2011.
Tuesday – Morning and Evening
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Beam instrumentation and background monitoring
LHC BIF test setup - update
Preliminary Results of MD wk46 V. Baglin, G. Bregliozzi, P. Chiggiato,
Presentation transcript:

Latest background observations in ALICE Latest background observations in ALICE A. Alici (INFN, Bologna), A. Di Mauro (CERN) LBS, 19/09/11

ALICE status after TS All fills from 2090 to 2103 could not be used, ALICE was safe all the time Physics runs have been taken in fills 2104, 2105, 2110, 2117 and 2124; however, gaseous detectors (including the TPC) could not always be ramped up 2

Two weeks ago vacuum around P2 3 FILL 2093 FILL 2092 FILL 2090 FILL 2091 FILL 2094 FILL 2086

FILLS , V0-AND rate KHz

FILL KHz

Last week vacuum around P2 6 FILL 2124 FILL 2117 FILL 2110 FILL 2105 FILL 2104 FILL 2103 FILL 2101 RC improvment, TDI degradation in fill

FILL

FILL

FILL

10

FILL

FILL

FILL

FILL COMPARING FILLS 2117 AND > STRONGER CORRELATION OF V0AND WITH VGPB.123 ?

V0AND vs Bran 15

run see next slide bkgd/all (MinBias) L=1Hz/ub vs. vacuum pressure (VGPB.123.4L2) BKGD vs p (after TDI) before TS

run FILL 2029

p=1.1E-8 mbar r=140kHz BG side A 4.8% BG side C 0.3% FILL 2032

BG side A 4.3% BG side C 1.8% run L=1Hz/ub run L=1Hz/ub BG side A 4.6% BG side C 0.4% FILL 2010 FILL 2011 Effect of RC vacuum before TS

run L=0.6Hz/ub run L=2.4Hz/ub BG side A 9.6% (5.8% ) BG side C 12.3% (7.4%) BG side A 2.2% (5.3%) BG side C 2.4% (5.7%) FILL 2104 FILL 2105 Effect of RC vacuum after TS

Conclusions From fill 2110 observed improvement of vacuum and bkgd, still far from status before TS From fill 2110 observed improvement of vacuum and bkgd, still far from status before TS Conditions are still not “optimal”, V0AND ~ 300 KHZ i.e. 4-5 times larger Conditions are still not “optimal”, V0AND ~ 300 KHZ i.e. 4-5 times larger Target pressure for acceptable bkgd is ~3x10 -9 mbar 21

Backup slides 22

ALICE layout23 Beam 1 Beam 2 BCM C 7 sensors z = m, r=10 cm BCM-A 8 sensors z = + 6 m, r = 10 cm

The V0 detector24 Two arrays of scintillator counters (V0A and V0C). Time spectra allow beam-gas events rejection V0A SPD 340 cm 90 cm V0A r in =8 cm r out =100 cm V0C r in =8 cm r out = 76 cm ITS V0C

25 beam1 IP 340cm ~11.3ns 90cm ~3ns V0AV0C V0A+V0C ≈ 14.3ns V0A-V0C ≈ 8.3ns beam1 IP ~-11.3ns~3ns V0A+V0C ≈ -8.3ns V0A-V0C ≈ -14.3ns beam2 IP V0A+V0C ≈ 8.3ns V0A-V0C ≈ 14.3ns ~11.3ns~-3ns V0 timing features beam2 collisions Bkgd1 (BGA) Bkgd2 (BGC) CINT1-B Beam background from beam1 Beam background from beam2 satellites