Presentation is loading. Please wait.

Presentation is loading. Please wait.

KEK, 阪大RCNPA, 阪大理B, 京大理C, 原研先端研D,

Similar presentations


Presentation on theme: "KEK, 阪大RCNPA, 阪大理B, 京大理C, 原研先端研D,"— Presentation transcript:

1 KEK, 阪大RCNPA, 阪大理B, 京大理C, 原研先端研D,
福井大E, 防衛大F, AlbertaG, UBCH, BNLI, FNALJ,IHEPK, INRL, UNMM, SUNY Stony BrookN,TRIUMFO 関口哲郎,大橋永治,小林正明,小松原健,笹尾登C,新川孝男F, 杉本章二郎,玉川洋一E,常見俊直,中野貴志A,能町正治B, 野村正C,藤原庸博C,溝内健太郎C,村松憲仁D,吉岡瑞樹, 吉村喜男,他 BNL-E949 CollaborationA,B,C,D,E,F,G,H,I,J,K,L,M,N,O March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

2 59th JPS Annual Meeting, Kyusyu Univ.
1. Physics Motivation (Flavor Changing Neutral Current: FCNC) l Vtd Second order: Top quark dominant Vtd vertex Theoretical uncertainty Good decay to measure |Vtd| in K+ system March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

3 59th JPS Annual Meeting, Kyusyu Univ.
1.1 Search for Two events were observed from BNL-E787. Observation SM prediction Mean value is twice higher, but consistent within error. March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

4 59th JPS Annual Meeting, Kyusyu Univ.
2. BNL-E949 Experiment 2.1 Search Region BNL-E949: Successor to BNL-E787. Aim: Collect more signal events. March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

5 59th JPS Annual Meeting, Kyusyu Univ.
2.2 E949 detector Stopped K+ experiment Delayed Coincidence Wait 2ns after K+ enters detector 2 ns March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

6 59th JPS Annual Meeting, Kyusyu Univ.
2.2 E949 detector Pulse analysis with Waveform Digitizer March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

7 59th JPS Annual Meeting, Kyusyu Univ.
2.2 E949 detector Upgrades in E949 detector March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

8 59th JPS Annual Meeting, Kyusyu Univ.
2.4 Data Taking Physics run: 2002, February ~ June ~12 weeks ~1/3 of E787 data March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

9 59th JPS Annual Meeting, Kyusyu Univ.
3. Background Study Analysis Strategy Main Background Blind Analysis Real data Likelihood Analysis March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

10 59th JPS Annual Meeting, Kyusyu Univ.
3.2 Likelihood Analysis T. Junk method: [NIM A434, 435 (1999)] Calculate confidence level (C.L.) with a small statistic (Poisson stat.). Predefined Background Functions: March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

11 59th JPS Annual Meeting, Kyusyu Univ.
3.3 Background and Sensitivity Background summary Background Events Beam Total Sensitivity Total Acceptance (10-2) NK (1012) Sensitivity (10-10) Ready to open the BOX ! March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

12 59th JPS Annual Meeting, Kyusyu Univ.
4. Opening the BOX An event is observed near upper kinematic limit. E=128.9 MeV P=227.3 MeV/c R=39.2 cm Other variables are fine. S/N ratio for this event March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

13 59th JPS Annual Meeting, Kyusyu Univ.
4.1 Branching Ratio Calculation Combine E787 and E949 data 0.07 0.006, 0.02 Background Prob. 0.48 0.98, 0.88 0.9 50, 7 Si / bi 2002A 1995A, 1998C Candidate NK E949 E787 March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

14 59th JPS Annual Meeting, Kyusyu Univ.
5. Summary March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

15 59th JPS Annual Meeting, Kyusyu Univ.
Backup Slides March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

16 59th JPS Annual Meeting, Kyusyu Univ.
Event Display 2002A March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

17 59th JPS Annual Meeting, Kyusyu Univ.
Pulse Shape in Stopping counter March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

18 59th JPS Annual Meeting, Kyusyu Univ.
Event Display No.2 1998C 1995A March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

19 59th JPS Annual Meeting, Kyusyu Univ.
E949(02): Combined E787&E949. E949 projection with full running period. March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

20 59th JPS Annual Meeting, Kyusyu Univ.
How much impact on |Vtd| ? 68% interval Central value 90% interval Picture by G. Isidori March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

21 59th JPS Annual Meeting, Kyusyu Univ.
How many events do we need ? E949 proposal: ~10 events give ~30% relative error ~40 events give ~16% relative error CKM proposal: ~100 events give ~10% relative error March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

22 59th JPS Annual Meeting, Kyusyu Univ.
Likelihood Analysis The definition of X The Poisson probability for Si + bi or bi to give di March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

23 59th JPS Annual Meeting, Kyusyu Univ.
Likelihood Analysis Then obtain the confidence level. March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

24 59th JPS Annual Meeting, Kyusyu Univ.
Likelihood Analysis March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

25 59th JPS Annual Meeting, Kyusyu Univ.
Typical Second Pulse Time for Signal and Background March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

26 59th JPS Annual Meeting, Kyusyu Univ.
Momentum Spectrum of some K+ decay modes March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

27 59th JPS Annual Meeting, Kyusyu Univ.
Background Sources Background Source Reasons Target cut Photon missing Kinematics mismeasure - Photon Veto - Phase Space cut Beam related March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

28 59th JPS Annual Meeting, Kyusyu Univ.
Bifurcation Method March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

29 59th JPS Annual Meeting, Kyusyu Univ.
Correlation check Loosen two cuts simultaneously or independently Compare observation and prediction outside the box. Prediction March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

30 59th JPS Annual Meeting, Kyusyu Univ.
Correlation Check 2 Compare Observed and Predicted in each loosened box 10.4 5.2 3.2 1.3 0.31 Predicted 11 5 4 1 Observed 21.8 14.5 9.1 1.4 0.35 25 16 12 62.4 31.1 12.4 4.9 1.1 53 22 9 3 March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

31 59th JPS Annual Meeting, Kyusyu Univ.
Correlation Check 3 (Statistical treatment) Fitting to the Observed / Predicted with constant 0.40 0.67 0.17 Total Background c Background Correlation seems to be small. March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.

32 59th JPS Annual Meeting, Kyusyu Univ.
End of Backup Slides March 28, 2004 59th JPS Annual Meeting, Kyusyu Univ.


Download ppt "KEK, 阪大RCNPA, 阪大理B, 京大理C, 原研先端研D,"

Similar presentations


Ads by Google