LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.

Slides:



Advertisements
Similar presentations
XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
Advertisements

Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
SLAC uTCA review 4-5 June 2012 Anders J Johansson Lund University Some slides from Zheqiao Geng and Tom Himel)
ESS LLRF System Anders J Johansson.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
Ron Akre, Dayle Kotturi LCLS April 20, 2006 Linac Coherent.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
Ron Akre, Dayle Kotturi LCLS February 8, 2006 Linac Coherent.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
Overview of the LLRF Activities at SLAC
Status of MicroTCA LLRF Development Zheqiao Geng On behalf of the LLRF AIP team 6/4/2012.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
Status of mTCA Stripline BPM Development June 4-5, 2012 Dan Van Winkle for BPM team: Sonya Hoobler, Tom Himel, Jeff Olsen, Steve Smith, Till Straumann,
LCLS-II Injector LLRF System – MicroTCA Based Design Zheqiao Geng 6/4/2012.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Dayle Kotturi Lehman Review May 10-12, 2005 Low Level RF Outline Scope Local feedback loop requirements Solutions Costs How this.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Stefan Simrock, DESY LLRF-ATCA Review, Dec. 3, 2007 Requirements for the ATCA based LLRF.
John Dusatko 2012 EPICS Timing Workshop The SLAC Timing System April 24, The Accelerator Timing System at SLAC: Experiences, Ideas & Future Plans.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
Zheqiao Geng 6/5/2012 Plan for Evaluating LLRF Deployment Solution at LCLS-II.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Anders Sunesson RF Group ESS Accelerator Division
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
MTCA use in Linac to replace CAMAC Tom Himel June 4,
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
WELCOME TO IHEP. RF Phase Control for BEPCII Linac Accelerator Wenchun Gao.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
Ron Akre, Dayle Kotturi Lehman October 24-26, 2006 Linac.
RF Phase Reference Distribution for the European XFEL Krzysztof Czuba Warsaw University of Technology, ISE For the RF Synchronization Team P. Jatczak,
K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Magnet Power Supplies K. Luchini Overview Hardware Software.
IIFC Meeting February 24-25, 2015, RRCAT P. R. Hannurkar, Akhilesh Jain, M. R. Lad RF Systems Division 650 MHz RF Power 1.
MO/LO Performance Summary and Maintenance Plans Tomasz Plawski Jefferson Lab OPS Stay Retreat, July 15th, 2015.
LLRF development of SSRF RF Group and Linac Group
ESS LLRF and Beam Interaction
Areal RF Station A. Vardanyan
MicroTCA Development and Status
RF Systems and Controls for the LERF CM Tests
CC LLRF SM18 test plan and BA6 infrastructure
Overview and System Design for ESS LLRF Systems
LLRF for ESS: Requirements and System design
352MHz Klystron Control for the 3MeV Linac test stand
WP02 PRR: Master Oscillator and RF Reference Distribution
LLRF Controls Outline Requirements External Interfaces Schedule Design
WP Coordinaten XFEL RF Operation
LLRF and Beam-based Longitudinal Feedback Readiness
Low Level RF Status Outline LLRF controls system overview
Sector 0 RF System Installation of components (Master Amplifier and PEP Phase Shifter) in October down time. Testing and commissioning during October.
LLRF Control System Outline Scope Requirements Design Considerations
Low Level RF Status Outline LLRF controls system overview
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
LLRF Control System Outline Scope Requirements Options considered
Linac Coherent Light Source (LCLS) Low Level RF Status
Low Level RF Design Outline Scope Requirements Options considered
Risk, Schedule, Deliveries
Linac Coherent Light Source (LCLS) Low Level RF Status
Low Level RF Status Outline Overview showing hardware instances
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Injector/Linac RF Status
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012

LCLS-II L1 and BC1 L1 (11-1) and BC1 (11-2 and Beam Phase Cavity PH02) L1 contains a single S-band station 11-1 (L1S) L1 contains a single S-band station 11-1 (L1S) LX contains a single X-band station 11-2 (L1X) LX contains a single X-band station 11-2 (L1X) Beam Phase Cavity PH02 Beam Phase Cavity PH02

Outline Introduction Requirements Scope Architecture and Design Test Results at LCLS Installation and Cabling Cost and Schedule Lessons Learnt from LCLS Summary Slide 3

Introduction RF controls of L1S and L1X are physically part of the LLRF system installed in the RF HUT at Sector 10 The design completely follows the design of LCLS-II Injector LLRF System Slide 4

Physics Requirements Slide 5 LCLS-II Linac Requirements - PRD

Scope of L1/BC1 LLRF System Slide 6 Phase and amplitude control of L1S and L1X, including field stability control and phase and amplitude settings Measurement of Beam Phase Cavity 02 (PH02) installed after BC1 Control infrastructure (VME, EVR and so on) and EPICS software

Interface and Context Slide 7 LCLS-II Injector LLRF System: Provides reference, LO and clock to both L1S and L1X Station 11-1 (L1S): Controlled and measured by PAC, SSSB and PADs Station 11-2 (L1X): Controlled and measured by PAC, TWT amplifier and PADs Beam Phase Cavity PH02: Measured by PADs Timing System: Provides EVG fibers to LLRF BCS: Provides gate signals to SSSB of station 11-1 AC Power Supply System: Provides remotely controllable power switch to LLRF chassis Water Cooling System: Provides temperature stabilized cooling water to LLRF chassis Fast Feedback System: Provides phase and amplitude set points to L1S Physics Applications: Gets LLRF data and sets LLRF parameters Details will be described in the LCLS-II ESD: LCLS-II Linac LLRF System Requirements Specification (SLAC-I )

Architecture of L1S Control Slide 8 Green boxes and lines are for L1S control Reference, LO and Clock are provided by LCLS-II Injector LLRF System A PAC chassis is used to control the phase and amplitude of L1S Two PADs chassis are used to measure RF signals Critical cables are routed in the tunnel for temperature stabilities

Architecture of L1X and PH02 Control Slide 9 Green boxes and lines are for L1X and PH02 control Reference, LO and Clock are provided by LCLS-II Injector LLRF System An X-band PAC chassis is used to control the phase and amplitude of L1X Two X-band PADs chassis are used to measure RF signals Critical cables are routed in the tunnel for temperature stabilities

Components Design Slide 10 Design of S-band PAC, PAD and SSSB has been described in the PDR and FDR of LCLS-II Injector LLRF System – L1S needs 1 PAC chassis, 2 PAD chassis and 1 SSSB chassis Design of X-band PAC, PAD and TWT amplifier will follow the design for LCLS and FACET – L1X needs 1 PAC chassis, 2 PAD chassis and 1 TWT amplifier chassis Low Risk – X-band PAC and PAD will use the same digital boards used in S-band PAC and PAD. There was no failure reported from X-band PAC, PAD and TWT amplifier installed at LCLS Components Selection:  VME CPU: Motorola PowerPC mvme6100  PAC and PAD CPU: Arcturus uCdimm Coldfire 5282  OS: RTEMS  Control System: EPICS  EVR: Micro Research EVR230 and RTM  SSSB: Microwave Amplifiers Ltd, AM S kW Pulsed Amplifier Details will be described in the LCLS-II ESD: LCLS-II Linac LLRF System Design Specification (SLAC-I , in progress)

Test Results at LCLS Slide 11 Test results of LCLS L1S and L1X are applicable to LCLS-II due to the same design

Installation and Cabling Slide 12 Installation  L1S SSSB chassis will be installed in the existing rack of 11-1 in the klystron gallery  L1X TWT amplifier chassis will be installed in the existing rack of 11-2 in the klystron gallery  PACs and PADs of L1S and L1X (total 6 chassis) will be installed in the RF HUT at Sector 10. They will be arranged into four racks together with the chassis of LCLS-II Injector LLRF System  VME crate for centralized LLRF control will be installed in the RF HUT Cabling  1/2 inch superflex coax cable with N-type connectors will be used for RF signal picking up and delivery  Cables for critical signals (SSSB drive cable from PAC, ACC In/Out cables to PAD) will be directly connected to PAC and PAD chassis  Cables for diagnostic signals (klystron drive, klystron beam voltage and klystron out cables to PAD) will be connected to a patch panel on the top of the rack and then routed to the PAD chassis with thinner cables for easier cabling and better maintainability  Ethernet and timing cables will be taken care of by global control system  All cables will be clearly labeled with consistent format

Proposed Installation at RF HUT Slide 13

Cost and Schedule Slide 14 ItemM&S Cost ($K)Labor (hour) L1 LLRF Systems (PAD, PAC, SSSB, Cabling and Components) L1 LLRF Installation128 BC1 LLRF Systems (PAD, PAC, SSSB, Cabling and Components) BC1 LLRF Installation160 L1/BC1 LLRF: FDR by Aug L1 LLRF: Hardware ready for rack installation by Feb L1 LLRF: Rack installation finished by July 2016 L1 LLRF: Production software release by Aug BC1 LLRF: Hardware ready for rack installation by Sept BC1 LLRF: Rack installation finished by April 2015 BC1 LLRF: Production software release by April 2015

Lessons Learnt from LCLS Slide 15 L1S is the most critical station requiring high RF field stabilities. Klystron modulator should be upgraded and well tuned to achieve the stability Measurement of the RF reflection from accelerator structures will be helpful to understand the behavior of the system Intra-pulse feedback may be required to improve the field stability of L1S (not available with the PAD/PAC design)

Summary Slide 16 The L1/BC1 LLRF design presented in this talk is a copy of the working system of LCLS, so the risk is low

Thank you!