TASK TEAM ON WIGOS QUALITY MANAGEMENT (TT-WQM). Topics:  Activities and discussions of the task team  Proposal for WIGOS Quality Monitoring System ST-QM.

Slides:



Advertisements
Similar presentations
WMO WMO Integrated Global Observing System (WIGOS) CBS EXPERT TEAM ON AIRCRAFT-BASED OBSERVING SYSTEMS 1st Session (Geneva, September, 2013) Dr I.
Advertisements

WMO Outcomes & Recommendations of the Workshop on Radar Data Exchange WMO; Name of Department (ND)
WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)
© Crown copyright Met Office Breakout sessions Stuart Goldstraw, UK Met Office, Chair ET-SBO-1, July 2013.
WIGOS monitoring a pilot project WMO; Name of Department (ND)
World Meteorological Organization Working together in weather, climate and water WIGOS IMPLEMENTATION IN RA III José Arimatéa de Sousa Brito, Focal Point.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) Cg-17, Agenda Dr S. Barrell, Chair, ICG-WIGOS WMO; OBS.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
WE Surface-based Global Observing System for Weather Dr Alexandre Karpov Task POC.
Observing System Capability Analysis and Review Tool (OSCAR) Detailed functions WIGOS Project Office WMO; Name of Department (ND)
© Crown copyright Met Office Requirements, objectives and desired outcomes for the Workshop Stuart Goldstraw, CBS IOS ET-SBO Chair, 24 th April 2013.
© Crown copyright Met Office Actions Stuart Goldstraw, CBS IOS ET-SBO Chair 24 th April 2013.
WMO Collaboration with EUMETNET in WIGOS Implementation ICG-WIGOS-3 (Geneva, 14 February 2014) Miroslav Ondráš, Chief, WMO Observing Systems Division WMO;
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) Dr L. P. Riishojgaard, WIGOS Project Manager WMO Secretariat, Geneva WMO; OBS.
WMO WIGOS from the CAS Perspective Sandro Fuzzi National Research Council, Italy WMO: Research Dept.
Development and Implementation of the WIGOS Data Quality Monitoring System (WDQMS) Doc. 4.4 ICG-WIGOS Task Team on the Plan for the WIGOS Pre- operational.
WMO Cliquez pour ajouter un texte GLOBAL CRYOSPHERE WATCH CryoNet Asia Workshop in Beijing, China - Report - CryoNet Team Meeting, Reykjavik, Iceland
WMO Report of Chair, TT-WRM-1 (Doc. 4.2) (R. Stringer, Chair, TT-WRM) WMO; OBS.
WMO Planning for the WIGOS Pre-operational Phase: Introduction Dr S. Barrell, Chair, ICG-WIGOS Cg-17 (Side event)
WMO WIGOS Regulatory Material - WRM Report to ET-SBO-1, 9-12 July 2013 Russell Stringer Chair, Task Team on WIGOS Regulatory Material (TT-WRM) Co-chair,
WMO Moving from the WIGOS Framework towards the Pre-operational Phase A. Makarau President of RA I.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) STATUS OF IMPLEMENTATION (Dr S. Barrell, Chair, ICG-WIGOS) WMO; OBS.
AWS relevant regulatory and non-regulatory material
WMO WIGOS Data Quality Monitoring System (WDQMS) I.Zahumensky.
WMO Technical Regulations & Regulatory Material (WIGOS-GCW relevant) (agenda item & 2.7.2) GCW Workshop (Boulder, Colorado, 7-9 December 2015) Dr.
Geneva, November 2012ICG-WIGOS TT-WRM First Session WMO World Meteorological Organization Working together in weather, climate and water What is.
WIGOS Data Quality Monitoring System Pilot project for the Quality Monitoring Component WebEx meeting, 1 July 2015, 2 PM (GE) WIGOS Project Office & Observing.
World Meteorological Organization Working together in weather, climate and water ICG-WIGOS 5 Progress on WIGOS activities within CBS WMO Dr. Jochen Dibbern.
WMO ICG-WIGOS-4, February 2015, Geneva, Switzerland: 5. ICG-WIGOS Task Team Reports: 5.1 TT - WIGOS Technical Regulations Russell Stringer Chair, ICG-WIGOS.
REVIEW OF OUTCOMES FROM THE 2 nd WIGOS Workshop on Quality Monitoring and Incident Management ICG-WIGOS-5 WMO; OBS/WIGOS.
WMO WIGOS in support of GFCS ICG-WIGOS-3 (Doc 5.4) February 2014, Geneva Dr S. Barrell, Chair, ICG-WIGOS Dr. L. P. Riishojgaard, WIGOS-PO.
WMO WIGOS Pre-operational Phase Regional & National Perspectives Tyrone W. SUTHERLAND (BCT, EC FP for WIGOS)
4.3 Task Team on WIGOS Quality Management (TT-WQM)
ELIXIR SAB Feedback December 2014.
WIS -WIGOS 21 deliverables and 39 activities are planned for for WIS and WIGOS.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO A WMO perspective on GSICS Joint Meeting of the.
2nd Workshop on WIGOS Data Quality Monitoring and Incident Management (Geneva, December 2015) JCOMM Quality Monitoring and the role of JCOMMOPS Etienne.
© Crown copyright Met Office Report of the Chair Stuart Goldstraw, UK Met Office, Chair ET-SBO-1, July 2013.
Monitoring Tools Timo Pröscholdt WMO; DRA. Today  Report  Timeline  Outlook.
WIGOS Data Quality Monitoring System (WDQMS) And the Demonstration Project in RA I The Plan, Status and First Results Luís Nunes WIGOS Project Office.
WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)
WIGOS regulatory and guidance material
The Plan, Status and First Results
Concept Proposal for RA-III Regional WIGOS Centre
WIGOS Data Quality Monitoring System (WDQMS)
Stuart Goldstraw, Met Office, UK
1st Session of the Task Team on WIGOS Data Quality Monitoring System
OPAG on Integrated Observing Systems
ET-SBO Report to ICT-IOS-9
WIGOS Data Quality Monitoring System (WDQMS)
Regional Basic Observing Network Concept
Regional Basic Observing Network Co-chair, CBS/OPAG-IOS
The Plan, Status and First Results
WIGOS Pre-operational Phase
5. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP) 5.2 WIGOS Regulatory Material complemented with necessary.
OSCAR/Surface (User Perspective)
Regional Basic Observing Network Concept
WIGOS Data Quality Monitoring System (WDQMS)
Overview of the WMO Integrated Global Observing System (WIGOS)
Co-chair Introduction
WDQMS NWP Pilot Project
Monitoring System (WDQMS)
Regional WIGOS Center in RA-VI – EUMETNET Proposal and capabilities
WIGOS Pre-Operational Phase;
WIGOS regulatory and guidance material
The WIGOS Pre-Operational Phase
Document 5.4.1(4) Regional Basic Observing Network (RBON) Concept
Inter-Commission Coordination Group On WIGOS
4. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP)   4.4 Development and implementation of the WIGOS.
Presentation transcript:

TASK TEAM ON WIGOS QUALITY MANAGEMENT (TT-WQM)

Topics:  Activities and discussions of the task team  Proposal for WIGOS Quality Monitoring System ST-QM –

Summary of activities of TT-WQM since ICG-WIGOS-3 Meeting TT-WQM-1 at WMO (Geneva), June 2014:  Update of Terms of Reference,  Concept of the WIGOS Workshop on Observational Data Monitoring,  Future Work Programme and Action Plan exchange concerning quality flags Review of Manual on WIGOS and the WMO Technical Regulation (WMO no 49), Volume 1, Part 1 – WIGOS

Summary of activities of TT-WQM since ICG-WIGOS-3 Workshop on Quality Monitoring and Incident Management at WMO (Geneva) December 2014 (chair Mr. Stuart Goldstraw, chair of ET-SBO). Proposal: Development of the WIGOS Quality Monitoring System (WQMS)

Regulatory material and QM practices Guidance material that should be considered:  Quality flags for data quality for the different observational networks  Emergency plans for gaps and errors in data:  communication of missing data or defunct programs  actions, that have to be taken in such cases  Introduction of statistical instruments for tests of inconsistent and erroneous data for all programs and for quality control of data (in order to describe the quality control of data outlined in the WIGOS manual, chapter ) ST-QM –

Regulatory material and QM practices Feedback loops are recommended between:  Observational data quality monitoring systems and data providers:  (Near) real time,  identify problems and take corrective actions,  provide guidance material (“lessons learned”)  Observational data providers and the user community:  In case, user expectations are not met,  Make solutions available from members for members  ICG-WIGOS should consider a recommendation about adding functionality for this area to the WIR. ST-QM –

Regulatory material and QM practices Exchange about experience between communities:  GAW:  regional calibration centres,  audits,  quality flags  EUCOS:  clear assignment of responsibilities in case of missing or faulty data  structured feedback loop for correction and resubmission of data Concept of implementing WIGOS QM on regional and national level? ST-QM –

REVIEWED TERMS OF REFERENCE OF TT-WQM The Task Team shall: a)Examine current quality management practices and procedures being used by WMO observing systems, including those co-sponsored by the organization. b)Report on QM practices and procedures used, with identification of areas for improvement. c)Based on a review of the current practices in the observational data monitoring system, formulate a recommendation on the way forward, including suggestions on: modernisation of the monitoring system, near-real time reporting, quality evaluation leading to quality improvement, fault management with feedback mechanisms, extension of the observational data monitoring to non-weather areas (i.e. beyond the GOS), where appropriate and possible, d)Undertake other activities related to WIGOS quality management as directed by ICG-WIGOS. e)Report at least annually to the ICG-WIGOS on progress made. f)Complete its tasks by December ST-QM –

Further comments:  Task team is not yet complete.  Expert on satellite monitoring?  Expert on hydrological observations? ST-QM –

Development of the WIGOS Quality Monitoring System Long-term scope:  WQMS defined and implemented for all component observing systems.  Extension of scope step-wise. Short to medium-term scope:  Update of the quality monitoring system of the WWW Programme and the GOS: Focus on surface-based sub-system and its monitoring by NWP centres.  QM of surface pressure, air temperature, wind, humidity and precipitation, includes: Automatic distribution of monitoring reports to data providers, and Automatic real-time/near-real-time practices and procedures for follow-up/corrective actions. ST-QM –

Deliverables Long term:  The WIGOS Quality Monitoring System (WQMS) established with:  WMO Lead Centres, Monitoring Centres and Regional Centres  A fault management system/ reporting system for QM Short to medium term:  A quality monitoring and fault management system in connection with ECMWF and perhaps other global NWP centres for GOS starting from selected pilots. ST-QM –

ST-QM –

ST-QM –

Tasks and Activities 1. Develop regulations/guidance on the WIGOS Global Quality Monitoring System (2016, TT-WRM) 2. Develop functional and technical specifications for a global Fault Management System (FMS) [S.Klink, TT-WQM]  Identify an off-the-shelf FMS that might be applied and assessed in the FMS pilots. (TT-WQM) ST-QM –

Tasks and Activities 3. Develop a proposal for the GOS Implementation of the WIGOS Global Quality Monitoring System (IPET-WIFI/SG-QM, ET-SBO) 4. GOS QM Pilots (SG-QM)  Pilot ( ECMWF, NCEP, others?) [R.Grumbine, D.Richardson] o Participating NWP centres to agree on: i.Information to exchange; ii.Format for exchange; iii.Feasibility and commencement. 5. Integration of GCOS networks into EUMETNET monitoring system (2015) [S.Klink] ST-QM –

Tasks and Activities 6. GOS FMS Pilots ( ET-SBO)  2 regional pilot FMS in association with the NWP Quality Monitoring Pilot 7. Develop guidance on the GOS WIGOS Global Quality Monitoring System (SG-QM, SG-RM) 8. Produce report to ICG-WIGOS on GOS Quality Monitoring and Fault Management System pilots ( TT-WQM) ST-QM –