CSEPs Update Chris Warner. 2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group 

Slides:



Advertisements
Similar presentations
Non-code User Pays. 2 What we will cover Background Current Services Governance Arrangements What is working well What is not working as well.
Advertisements

Application of User Pays Principles to Existing Service Lines 22nd November 2006.
AQ Appeals and the BTU form Chris Warner. 2 AQ Appeals and the BTU form  Presentation reflects NGD’s view of UNC regime as drafted and is intended to.
Senior Stakeholder Forum 04/02/2014. Agenda UK-Link Programme Update –Including Data Cleansing Update Nexus Modification Update Faster Switching EU Reform.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
1 Modification 422 Creating the permission to release data to Meter Asset Provider organisations A presentation by the Community of Meter Asset Providers.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Draft Review Proposal 175 Encouraging Participation in the elective DM Regime Phil Broom 25 October 2007.
PN UNC Workgroup Supply Point Register 25 th October 2011.
MOD506 – Gas Performance Assurance Framework and Governance Arrangements.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
Nexus Workgroup CSEP Transition Topic June
Proposed Agreement For Identification And Administration Of Unregistered Sites Chris Warner Network Code Manager.
Gas Performance Assurance Framework 11 th January 2013 Confidential.
IGT Single Service Provision Requirements Update – 27 th March 2013.
UNC Review Group 0178 National Grid Distribution “Reclassification of SSP to Domestic only” Review Group Meeting – 22 February 2008 Chris Warner.
CSEPs Reconciliation “Read Window” proposal. 2 Background  I&C CSEPs (supply point AQ >73,200) are subject to reconciliation  IGTs are obliged to provide.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
PN UNC Workgroup iGT Services 7 th February 2012.
Industry data quality, ownership and governance Meeting with UNC 17 July 2014.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Project Nexus : Funding Arrangements Joel Martin - 30 April 2009.
ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous Workstream discussion ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Industry Dialogue on xoserve Services 14 th September 2007.
Connected System Exit Points Options for strategic regime change Chris Warner.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Gas Performance Assurance Framework 11 th January 2013.
23 February 2011 IGTRP0030 Potential impacts on Parties of changes to NExA Table.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream.
IGT and Shipper Workgroup meeting 28 th February 2011.
Customer Charge On behalf of all DNs 19 November 2010.
1 iGT Agency Services migration considerations As part of UK Link replacement programme (incorporating industry requirements) the new systems will need.
User Pays User Committee 12th November 2013
David Addison / Steve Deery
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
Modifications iGT 039 and GT 0440 re iGT Agency Services background
CSEP NExA Update Marie Clark ScottishPower 28th September 2006.
Market Trials ChMC 8th August 2018.
iGT Agency Services Background
Modification th July 2008.
Project Nexus Workgroup
Connected System Exit Points Administration Options
CSEPs Reconciliation Proposals
Chris Warner Network Code Manager
Chris Warner UNC Modification Panel 21 December 2017
Connected System Exit Points Administration Options
Modification 0468 – Unique Property Reference Number by Gas Transporters David Addison.
UNC Modification Proposal 0362
Project Nexus Workgroup
PN UNC Workgroup iGT Services
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Connected System Exit Points - Update
Project Nexus Workgroup
Deferral of Retrospective Updates Functionality
PN UNC Workgroup iGT Services
Modification 440 Project Nexus iGT Single Service Provision
PN UNC Workgroup (AQ topic)
DSC Change Committee Update
Presentation transcript:

CSEPs Update Chris Warner

2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group  Long term options (options 1, 2, 3)  Incremental improvements (option 4)  SPAA iGT Single Service Provision Scoping Group  Development of Option 3

3 Ofgem CSEP Group – Incremental improvements (option 4)  Change Order 1216  Issue: – date of registration in DNO Settlement Systems does not match that within iGT Supply Point Register – results in Supply Point mis-match  Resolution: – DNOs to allow registration in their Settlement Systems earlier in the connection process – enables co-ordination of iGT and DNO start dates where notification received from the iGT  Implementation: – Scheduled for 1 October 2009

4 Ofgem CSEP Group – Incremental improvements (option 4)  UNC Modification 0226 / Change Order 1262  Issue: – DNO unable to match iGT’s first LMN request to the DNO authorised connection (disconnect between engineering and commercial processes) – lack of nested CSEP data – results in Supply Point mis-match  Resolution: – iGT obligation to provide DNO reference number in LMN requests – DNO ability to receive and process data issued from nesting iGTs  Implementation: – Scheduled for 1 October 2009  Dependency: – iGT UNC obligation for ‘lead’ iGT to issue relevant DNO reference to all nesting iGTs and for nesting iGT to issue relevant data to DNOs

5 Ofgem CSEP Group – Incremental improvements (option 4)  Reconciliation  Implementation of change requests 1216 / 1262 and UNC Modification 0226 seek to address prospective registration activity  There is pre existing issue with a mismatch in iGT and DNO Settlement information  The key to the successful implementation of the changes is therefore the conduct of an exercise at implementation to reconcile all relevant portfolio information in DNO and iGT systems  Implementation plan will make provision for this

6 SPAA iGT Single Service Provision Scoping Group (1)  SSP  The CSEP NExA Governance group has discussed data quality issues between iGT’s and GDN’s.  This group has discussed a number of models to eradicate the incorrect gas allocation issue and those challenges faced by shippers and suppliers as a result of iGT’s varying approaches to Supply Point Administration and AQ Review.  As a result the SSP project has been set up by the SPAA Executive Committee to deliver the procurement of a single service provider for Independent Gas Transporters.

7 SPAA iGT Single Service Provision Scoping Group (2)  Progress so far  Cost Analysis  Comments Matrix  Alternative Options  Project plan for completion end 2012  Recommendations Report to SPAA EC in May 2009

8 SPAA iGT Single Service Provision Scoping Group (3)  SSP Issues and Benefits  Issues – Requires licence changes for either the Suppliers or the Transporters to ensure compliance – Funding  Benefits – Provide more timely and accurate data exchange between DN’s and iGT’s – Potential for reduced costs

9 Questions?