TCCA Aircraft Certification

Slides:



Advertisements
Similar presentations
TYPE CERTIFICATES FOR IMPORTED AIRCRAFT Cooperative Development of Operational Safety & Continuing Airworthiness COSCAP.
Advertisements

METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
Radiopharmaceutical Production
ITU Forum on "Human Exposure to Electromagnetic Fields (EMFs) in Latin America" Session 1: The other side of ICT convergence: EMF exposure and issues Montevideo,
Installation Requirements Paperwork Trail Difficulties
MAJOR REPAIRS AND ALTERATIONS
Industry Priorities for the Next TSO-C127 Revision
EQUIPMENT VALIDATION.
Presented by Stephen Slotte FAA Transport Standards Staff
General Authority of Civil Aviation 1 Air Carriers & Operators In Saudi Arabia Saudi Arabia has made a decision to liberalize the Civil Aviation Market.
Certification of Transport Medical Equipment
DoD Information Technology Security Certification and Accreditation Process (DITSCAP) Phase III – Validation Thomas Howard Chris Pierce.
Process Specification Guidelines FAA/NASA Workshop 6 August 2002.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
FAA FAA Advisory Circular Presented at 9/16/03 Workshop (Chicago, IL) Background – Purpose of the advisory circular – Related regulations & guidance materials.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
ISO 9001 Interpretation : Exclusions
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Safety Report Treatment of Safety-Critical Systems in Transport Airplanes Office of Research and Engineering.
PROPOSALS THE REVIEW OF THE 1958 AGREEMENT AND THE INTRODUCTION OF INTERNATIONAL WHOLE VEHICLE TYPE APPROVAL (IWVTA) IWVTA Informal Group WP th Session.
BRC Food Safety Quality Management System Training Guide
MethodGXP The Solution for the Confusion.
1 Avionics Workshop Ottawa, Ontario Nov.2003 Installation Approval of Non-required Avionics Equipment ISSUE TCCA Regional aircraft certification engineers.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
HWG-10 Presentation to the FAA Aging Aircraft Workshop Presentation By: Jon Haag Chairman of HWG-10.
Commercial Parts Considerations CAANZ Delegate Conference, Oct 2009 Neil Burton Senior Design Engineer Altitude Aerospace Interiors.
Regulatory Reform Program Proposed Design Approval Rules CASR Parts 21 and 146 Ian Kearsley Manager Engineering Support Section This presentation is.
WAEA SFW Connectivity Update – Universal Sheraton - March 25, 2010 Presented by Jonathan Norris VP Cabin Design Office Aircraft Networks, Certification.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
System Wiring Policy Greg Dunn FAA, Transport Airplane Directorate, Airplane & Flight Crew Interface Seattle, Washington November 6, 2001.
Federal Aviation Administration Plane Sense R1 11/05/2012.
Federal Aviation Administration RTCA Update 0 Federal Aviation Administration Pat Cahill AJP-632; Fire Safety Team Wm. J. Hughes Technical Center Federal.
System Wiring Policy Greg Dunn FAA, Transport Airplane Directorate, Airplane & Flight Crew Interface Seattle Washington.
Functional Check Flight Symposium ANAC Presentation Homero Montandon – Test Pilot Airworthiness Branch Vancouver – Canada, 7 and 8 Feb
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Transient Suppression Devices November 7, 2002 Georgios Roussos Seattle ACO
1 Common Standard Wiring Practices Documents ATSRAC Task 7 Working Group presented by Don Andersen HWG7 Co-chairman.
Federal Aviation Administration RTCA Update 0 Federal Aviation Administration Pat Cahill AJP-632; Fire Safety Team Wm. J. Hughes Technical Center Federal.
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
Enhanced Airworthiness Program for Airplane Systems (EAPAS) Presented by: Massoud Sadeghi FAA - Aging Systems Program Manager EAPAS Workshop November 2002.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
Advanced Science and Technology Letters Vol.47 (Architecture and Civil Engineering 2014), pp Electromagnetic.
© Copyright 2005 TEM Consulting, LP - All Rights Reserved Presentation To EAC Aug. 23, 2005 Hearing, Denver, CORev 1 – 08/16/05 - HSB Considerations In.
ATSRAC TASK 6 W IRE S YSTEMS H ARMONIZATION W ORKING G ROUP.
Federal Aviation Administration Downloaded from Plane Sense R1 11/05/2012.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
ERT 421 Good Manufacturing Practice for Bioprocess Engineering Test 1: answer scheme.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
Construction Inspection for Field Office Activities Welcome by SCE Introductions Name Position (SCT, SC, DC, CET, ETC) Location Instructors 1.
Technology Services – National Institute of Standards and Technology Conformity Assessment ANSI-HSSP Workshop Emergency Communications December 2, 2004.
Responsibilities of Test Facility Management, Study Director, Principal Investigator and Study Personnel G. Jacobs Belgian GLP Monitorate Zagreb, 17 December.
Workshop on conformity assessment procedures and certification of medical devices INT MARKT Kyiv, November 2011 Conformity assessment of medical.
X-Ray Personnel Security Screening Systems Update Presented to TEPRSSC October 1, 2003 Gaithersburg, MD.
IEEE NPEC SC2 Equipment Qualification Electromagnetic Compatibility Compliance Type Test-Design Considerations- Installation and Mitigation Standard/Guidance.
HIRF Regualtion Jean-Christophe LAMY 15/12/2015 MR
HIRF Regualtion Jean-Christophe LAMY 15/12/2015 MR
EMC & COMPLIANCE ENGINEERING
Guide Strawman Approach 27 April 2017
Flooding Walkdown Guidance
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
Installation of Non-Required Equipment
Aeronautic & Traceability By Alain Pétrement (Société Air France)
Certification of Rotorcraft and FHA Process
Accredited Standards Committee C63® - EMC
Product and Process Validation JAN ROOVERS ASSOCIATES, INC.
DOE Review of the LCLS Project October 2006
The Control of Electromagnetic Fields at Work Regulations 2016
Presentation transcript:

TCCA Aircraft Certification EMI/EMC Requirements for Part 23/25 Airplanes Jean Cartier Avionics Workshop TCCA Aircraft Certification November 27, 2003

Avionics Modifications AEA 03-03 Item EMI/EMC Testing of Avionics Modifications

Statement of Issue AEA recommends TCCA to provide guidance material to ensure EMI/EMC testing of avionics installations are conducted in a manner appropriate to the type and criticality of equipment being installed and its potential effects on the aircraft

AEA Issues Level of EMC Testing for Non-required Equipment Installations DO-160D Section 20/21 Test Category/Data for Criticality of Equipment and Functions Compliance to HIRF Certification Standards Requirements for EMC Test Plans Acceptability of Equipment Test Data VS Installation Test Data

§ 23.1431(b) Electronic Equipment (b) Radio and electronic equipment, controls, and wiring must be installed so that operation of any unit or system of units will not adversely affect the simultaneous operation of any other radio or electronic unit, or system of units, required by this chapter. §23.1431(b) parallels the requirement of §23.1309(a) The intent of § 23.1431(b) is exactly the same as §25.1431(c) Issued 11/03/64 & CAR 4b.650, 31/12/53 Equipment required by this Chapter includes Parts 1 through 139 §23.1431(b): requirement addressees the victim/source effects on installed equipment/systems §23.1309(a): Each item of equipment, each system, and each installation: (1) When performing its intented function, may not adversely affect the response, operation, or accuracy of any (I) Equipment essential to safe operation; or…

Level of EMC Testing for NRE Installations General guidelines for EMC are provided in: AC 25-10 “Guidance for Installation of Miscellaneous, Non-required Electrical Equipment” MIL-STD 464 “Electromagnetic Environmental Effects Requirements for Systems” AC 43.13-1B “Guidance for Installation of Miscellaneous, Non-required Electrical Equipment” Chapter 11, Paragraphs 106/107 Ground Power may mask aircraft transient due to its large capacitive effect

Level of EMC Testing for NRE Installations (Cont’d) The following factors should be addressed as part of the EMC requirements: Verify by inspection that the installed equipment/system conforms to the specified installation drawings Development of the source/victim operational check matrix should consider potential EMI conditions between transmission and harmonic frequencies of required equipment such as radios and navigation systems, Etc… All reasonable combinations of control settings and operating modes should be assessed Communications and navigation equipment should be operated on low, mid-band, and high frequencies

Level of EMC Testing for NRE Installations (Cont’d) The following factors should be addressed as part of the EMC requirements (Cont’d): All electrically operated equipment and systems must be fully functional In-Flight EMC testing should be assessed to validate flight operated functions which cannot be assessed on-ground On-Ground EMC testing should be conducted with the equipment powered by the airplanes’s electrical generating system

Level of EMC Testing for NRE Installations (Cont’d) The following factors identify installation design considerations which may directly contribute to the quality of EMC between non-required and required A/C systems: Equipment location and installation Harness routing Shielding integrity Wiring segregation Potential ground loops Inter-channel communication interference Antenna Radiation

Level of EMC Testing for NRE Installations (Cont’d) The source/victim testing level for non-required equipment is the same as for required equipment. However, our concern is much less for the functionality of non-required equipment

RF Susceptibility (Radiated & Conducted) DO-160D Section 20 Test Category/Data for Criticality of Equipment and Functions RF Susceptibility (Radiated & Conducted) The purpose of section 20 is to determine that the equipment functions will not be adversely affected when the equipment and its interconnecting wiring are exposed to specified HIRF levels The declared equipment test category level should comply with the HIRF’s Special Condition (SC) requirements Applicable to systems which perform critical functions The test category levels is dependent upon the shielding effectiveness which is provided by the aircraft structural components.

Emission of RF Energy (Radiated & Conducted) DO-160D Section 21 Test Category/Data for Criticality of Equipment and Functions Emission of RF Energy (Radiated & Conducted) The purpose of section 21 is to determine that the equipment does not emit undesired RF noise in excess of the specified test category level. DO-160D section 21 provides guidance for selecting appropriate category levels The test category levels are declared by the equipment manufacturer

DO-160D Section 21 Test Category/Data for Criticality of Equipment and Functions (Cont’d) DO-160 provides guidance to assist the manufacture in selecting the appropriate test category. However, it is the responsibility of the installer to resolve any incompatibilities between the new installation and previously installed equipment The test category levels is dependent upon the shielding effectiveness which is provided by the aircraft structural components.

Compliance to HIRF Certification Standards The following are applicable guidance/advisory material: FAA Notice N8110.71 “Guidance for the Certification of Aircraft Operating in HIRF Environments” 4/2/98 AC/AMJ 20-1317 “The Certification of Aircraft Electrical and Electronic Systems for Operation in the HIRF Environment” – “Final Draft” March 1999 Users Guide for AC/AMJ 20-1317 “The Certification of Aircraft Electrical and Electronic Systems” SAE ARP5583 “Guide to Certification of Aircraft in a HIRF Environment” January 2003 DO-160D Section 20 “RF Susceptibility (Radiated and Conducted) 14/12/00 Change No. 1

Compliance to HIRF Certification Standards (Cont’d) The requirement for certification to HIRF is addressed by a Special Condition (SC), and is applicable to systems which perform critical (Level A) functions Compliance to the HIRF SC requires that the applicant submit the following: Compliance Plan outlining the method of compliance to HIRF Aircraft Hazard/Safety Analysis (FHA) and a HIRF/Lightning Criticality Assessment to substantiate the systems/equipment criticality levels and test data FHA: Functional Hazard Assessment PSSA: Preliminary System Safety Assessment (SAE ARP 4761)”Guidelines and Methods for Conducting the Safety Assessment Process on Civil Airborne Systems and Equipment” (Certification Environment for airplanes) (Severe Environment for rotorcraft)

Compliance to HIRF Certification Standards (Cont’d) The FAA/TCCA HIRF SC requirements are applicable only to systems which perform critical functions (Level A) The JAA HIRF SC requirements are applicable to systems which performs critical and essential functions (Levels A,B,C) The test category levels is dependent upon the shielding effectiveness which is provided by the aircraft structural components.

Compliance to HIRF Certification Standards (Cont’d) Also applicable to the HIRF SC is the requirement to provide Instructions for Continued Airworthiness (ICAW) in accordance with the requirement of §23/25.1529. The ICAW should include all necessary maintenance actions to assure that the continued integrity of structural shielding, wire shields, connectors, and equipment protection components are maintained FHA: Functional Hazard Assessment PSSA: Preliminary System Safety Assessment (SAE ARP 4761)”Guidelines and Methods for Conducting the Safety Assessment Process on Civil Airborne Systems and Equipment” (Certification Environment for airplanes) (Severe Environment for rotorcraft)

Need for EMC Test Plans An EMC test plan is required to document: The source/victim functional test matrix (Evaluation of all potential system victims must be assessed) The equipment/system installation conformity (A/C equipment/system configuration must be representative; model and part number of the installed equipment should be identified) The Pass/Fail criteria (as applicable) All reasonable combinations of control settings and operating modes (All foreseeable EMC worst case conditions should be considered)

Need for EMC Test Plans (Cont’d) An EMC test plan is required to document: (Cont’d) Communication and navigation equipment operating frequencies On-ground and In-flight test configurations The test plan should provide adequate detail to assure repeatability

Acceptability of Equipment Test Data VS Installation Test Data DO-160 Section 20 equipment test data would be acceptable providing that the test category levels comply with the HIRF SC requirements (Category W; 100V/M - 150mA) DO-160 Section 21 equipment test data would not be sufficient (section 21 qualification test data provides some degree of confidence to the installer that the equipment will be compatible with installed systems) However, EMC A/C installation test data would be required to demonstrate compliance to §23/25.1431

Conclusion All new installations must address the requirements of §23.1431(b)/§25.1431(c) Recommended guidance material is provided in AC 25-10, MIL-STD 464, AC 43.13-1B, and the HIRF users guide TCCA intends to address EMI/EMC concerns at the internal TCCA workshop