1 Blackout 2003 See:

Slides:



Advertisements
Similar presentations
August 14, 2003 Blackout Summary Based on Interim Report of the
Advertisements

1 Joint U.S.-Canada Power System Outage Investigation Interim Report Causes of the August 14 th Blackout in the United States and Canada.
1 Power Blackout of 2003: Lessons Learned Verizon Technical Support Services-Power Systems Charlie Romano-Director
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
December 1, 2003 Bill Parks Office of Electric Transmission and Distribution U.S. Department of Energy Presentation to the Federal Energy Regulatory Commission.
Peter Chung (ID: pwc140030) Class: EMS in Software Engineering Course: Advanced Requirements Engineering (CS/SE 6361), Fall 2014.
U.S./CANADA Power Outage Task Force n Generator trips n :05:44 Conesville 5 [375 MW] n :14:04 Greenwood 1 [785 MW] n :31:34 Eastlake.
Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
NERC Compliance An NWP Perspective
The Mathematics of the Great U.S. Blackout August 14, 2003 Ralph Fehr, P.E. Engineering Consultant.
August 14, 2003 Blackout Final Report
REN-Rede Eléctrica Nacional,S.A. Can the California and New York crisis occur in Europe ? Rui Pestana IST - 25th October 2003.
1539pk 2003 MAJOR POWER GRID BLACKOUTS IN NORTH AMERICA AND EUROPE Copyright © P. Kundur This material should not be used without the author's consent.
NORTHERN REGIONAL GRID SYSTEM CONTINGECY AND RESTORATION.
April 15 and May 15, 2003 ERCOT System Disturbances ERCOT TAC Meeting June 4, 2003.
1 U.S. Energy Information Administration, Annual Energy Review All energy input US average = 90.3 MWh per person, per year. Corresponds to 10.3 kW.
Transmission Transporting Energy by Wire Matthew Stoltz Basin Electric Power Cooperative 1 1.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
1 If I were to give grades today… > 80A A B B B C C C D D D-1
WECC and NERC Protection Criteria and Standards
Getting the electricity from the plant to the light switch
August 2003 Blackout Review Brant Eldridge Executive Manager - ECAR.
August 14 th NE Blackout and Common Roots of Blackouts Damir Novosel, PhD President KEMA Inc., T&D Consulting BLACKOUT AMERICANO E ITALIANO:
1 Voltage Stability and Reactive Power Planning Entergy Transmission Planning Summit New Orleans, LA July 8, 2004 Entergy Transmission Planning Summit.
Averting Disaster - Grid Reliability Issues and Standards National Energy Restructuring Conference April 1, 2004 Washington, DC.
Review of BPA Voltage Control Conference
Security of Supply Issues: Technical & Economic Aspects Chen-Ching Liu Advanced Power Technologies Center University of Washington.
Houston Area Dynamic Reactive Project March 11,
Recommendations from 2011 Southwest Outage Heather Polzin, FERC Office of Enforcement Dave Nevius, Senior Vice President, NERC Member Representatives Committee.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
By: Amanda Torres BLACKOUTS:What causes them and how to reduce… Energy is the main source that keeps this world alive. When energy blows out it causes.
VISUALIZATION WHY WE NEED SYNCHROPHASOR TECHNOLOGY IN OPERATIONS John Ballance – EPG Presented to ERCOT Phasor Technology Workshop – November 16, 2012.
1 U.S. Energy Information Administration, Annual Energy Review All energy input US average = 90.3 MWh per person, per year. Corresponds to 10.3 kW.
United States Grid Security and Reliability Control in High Load Conditions Christopher Lanclos—Mississippi Valley State University Research Alliance in.
1 August 14, 2003 Blackout MAC Meeting October 8, 2003 Paul Murphy IMO.
PS ERC 1 Power System Control: Enhancing the Human-System Interface The Mathematics of August 14 th 2003: How Complex? Tom Overbye Dept. of Electrical.
1 Local Area Planning Update to TRANSAC – Sept 16, 2015 Mitigation Update, Uncertainty Scenarios, VAR Margin Study.
Need for protection Power system must be kept in operation continuously without major breakdowns This can be achieved in two ways: 1.Implement a system.
1 Stability Issues in Entergy System Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
CIP Version 4 The Basics. CIP Version 4- Background Centers around expanded criteria for Critical Assets – FERC thought Risk Based Methodologies used.
Todos los derechos reservados para XM S.A E.S.P. Luis Alejandro Camargo S. Wholesale Market Manager XM S.A. E.S.P. Colombian Market Stress Experiences.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
Aug, 2005 THE US BLACKOUT AUGUST 14, Aug, 2005 NORTH AMERICAN GRID INTER-CONNECTS THE INDIAN GRID AT PRESENT IS ALSO SIMILAR WITH THE SOUTHERN REGION.
1 MOSC Presentation Grid Collapse 2003 September 22/2004 Information is preliminary subject to ongoing investigations Certain material is from NERC and.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
Carmen A. Medina-apparently recovering from pneumonia-but you can also find her on recoveringfed.com and follow her on
N-1-1 Contingency Analysis & Relay Protection 4 th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
Before Faraday Electricity was generated via electrostatic means used moving electrically charged belts, plates and disks to carry charge to a high potential.
Managed by UT-Battelle for the Department of Energy 1 United States Grid Security and Reliability Control in High Load Conditions Presented to Associate.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Power Grid A network of power transmission systems Usually more than one path between points on a network.
September 18, 2007 Regional Disturbance
Barrilla Junction Area Transmission Improvements Project
Grid Operations Update
Grid Integration of Intermittent Resources
Introduction To Reactive Power
Joint U.S.-Canada Power System Outage Investigation
US Power Grid Three grids cover the contiguous 48 states and parts of Canada and Mexico and are known as the Western Interconnection, the Eastern Interconnection,
Power Transmission.
Impacts and Actions Resulting from the August 14, 2003 Blackout
Transformers No not these guys…...
ECEN 615 Methods of Electric Power Systems Analysis
TONBRIDGE POWER GREEN LINE
Module T1 Transmission Power Point Slide Set b.
ECEN 615 Methods of Electric Power Systems Analysis
Presentation transcript:

1 Blackout 2003 See:

2

3 WHAT HAPPENED ON AUGUST 14, 2003??? 1. 12:05Conesville Unit 5 (rating 375 MW) 2. 1:14Greenwood Unit 1 (rating 785 MW) 3. 1:31Eastlake Unit 5 (rating: 597 MW) INITIATING EVENT 4. 2:02Stuart – Atlanta 345 kV 5. 3:05Harding-Chamberlain 345 kV 6. 3:32Hanna-Juniper 345 kV 7. 3:41Star-South Canton 345 kV 8. 3:45Canton Central-Tidd 345 kV 9. 4:05Sammis-Star 345 kV SLOW PROGRESSION

4 WHAT HAPPENED ON AUGUST 14, 2003??? 1. 12:05Conesville Unit 5 (rating 375 MW) 2. 1:14Greenwood Unit 1 (rating 785 MW) 3. 1:31Eastlake Unit 5 (rating: 597 MW) INITIATING EVENT 4. 2:02Stuart – Atlanta 345 kV 5. 3:05Harding-Chamberlain 345 kV 6. 3:32Hanna-Juniper 345 kV 7. 3:41Star-South Canton 345 kV 8. 3:45Canton Central-Tidd 345 kV 9. 4:05Sammis-Star 345 kV SLOW PROGRESSION 10. 4:08:58Galion-Ohio Central-Muskingum 345 kV 11. 4:09:06East Lima-Fostoria Central 345 kV 12. 4:09:23-4:10:27Kinder Morgan (rating: 500 MW; loaded to 200 MW) 13. 4:10Harding-Fox 345 kV 14. 4:10:04 – 4:10:4520 generators along Lake Erie in north Ohio, 2174 MW 15. 4:10:37West-East Michigan 345 kV 16. 4:10:38Midland Cogeneration Venture, 1265 MW 17. 4:10:38Transmission system separates northwest of Detroit 18. 4:10:38Perry-Ashtabula-Erie West 345 kV 19. 4:10:40 – 4:10:444 lines disconnect between Pennsylvania & New York 20. 4:10:412 lines disconnect and 2 gens trip in north Ohio,1868MW 21. 4:10:42 – 4:10:45 3 lines disconnect in north Ontario, New Jersey, isolates NE part of Eastern Interconnection, 1 unit trips, 820 mw 22. 4:10:46 – 4:10:55New York splits east-to-west. New England and Maritimes separate from New York and remain intact :10:50 – 4:11:57Ontario separates from NY w. of Niagara Falls & w. of St. Law. SW Connecticut separates from New York, blacks out. FAST PROGRESSION (cascade)

5 Immediate causes of the 8/14/03 blackout 1:30Loss of East Lake generator (over-excitation) 2:02Loss of Stuart-Atlanta (tree contact) 2:02MISO system model becomes inaccurate 2:14-3:08Loss of software in FE control center 3:05Loss of Harding-Chamberlain (tree contact) 3:32Loss of Hanna-Juniper (tree contact) 3:41Loss of Star-S.Canton (tree contact) 4:06Loss of Sammis-Star (high overload looked like fault to “zone 3” of the protection system)

6 Why did MISO system model become inaccurate? From pg. 46: kout-2003-final-report-august blackout-united-states-and- canada-causes-and

7 Why did MISO system model become inaccurate? From pg. 47: kout-2003-final-report-august blackout-united-states-and- canada-causes-and

8 Why did MISO system model become inaccurate? From pg. 48: kout-2003-final-report-august blackout-united-states-and- canada-causes-and

9 Why so much tree-contact? u Trees were overgrown because right-of- ways had not been properly maintained. u Lines expand and sag due to heat; more prone in summer with high temperature & low winds; more prone with high current. u Each successive line trip requires that the power it was carrying be transferred to flow elsewhere, resulting in increased power on remaining lines.

10 Another influence: insufficient reactive power Another contribution to the blackout was insufficient reactive power in the Cleveland area, i.e., the reactive power (vars) in the Cleveland area generation was insufficient to meet the reactive power demand of its motors. Conditions that make a system prone to this include: u High load, especially induction motors (air conditioners) u Loss of generation in load-intensive area and/or loss of transmission into that load-intensive area This results in voltage decline in the load-intensive area, and because P~VI, when voltage V declines, current I must increase in order to maintain the same power P. When I goes up, lines load up more heavily.

11 Another influence: Backup protection u Relays sense V/I and trip if it is too low; good approach because fault conditions are low voltage, high current. u Relays are directional; trip only for faults “looking” in one direction. u Zone 1 trips instantly; trip zone for primary protection u Zone 2 has small delay. Zone 3 has large delay; these are trip zones for “backup” protection Zone 1, no delay Zone 2, small delay Zone 3, large delay

12 Why did the cascade happen (events 10-23) u Oscillations in voltages and currents, and/or very high currents caused many transmission line zone 2,3 protection systems to see what appeared to be faults & trip the line. u Underfrequency u Under-voltage u Overexcitation u Out-of-step u Over-voltage u As a few generators tripped, load>gen imbalance caused underfrequency and lower voltages. u Generators tripped for 1 of following reasons:

13 Units tripped and areas outaged Areas Affected by the Blackout Service maintained in some area Some Local Load Interrupted The blackout shut down 263 power plants (531 units) The blackout outaged parts of 8 states & Ontario. Total cost: ~10 billion $. Half of DOE annual budget Twice NSF annual budget

14 Final List of Main Causes u There was inadequate situational awareness at First Energy (FE). FE did not recognize/understand the deteriorating condition of its system. u FE failed to adequately manage tree growth in its transmission rights-of-way. u Failure of the interconnected grid’s reliability organizations (mainly MISO) to provide effective real-time diagnostic support. u FE and ECAR failed to assess and understand the inadequacies of FE’s system, particularly with respect to voltage instability and the vulnerability of the Cleveland-Akron area, and FE did not operate its system with appropriate voltage criteria. No long-term planning studies w/ multiple contingencies or extreme conditions No voltage analyses for Ohio area and inappropriate operational voltage criteria No independent review or analysis of FE’s voltage criteria and operating needs Some of NERC’s planning & operational requirements were ambiguous