Fish and Wildlife Coordination Act (FWCA) Protecting and Conserving Fish and Wildlife Resources Ch. 4 Mod. 1 – HO#10.

Slides:



Advertisements
Similar presentations
Sharon Gross U.S. Fish and Wildlife Service The U.S. Invasive Species Management Plan.
Advertisements

Contract and Grant Provisions and Administration Section 105 (Page 30) Title I The Act.
National Park Service Mission To preserve unimpaired the natural and cultural resources and values of the National Park System for the enjoyment, education,
Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
SAFETEA-LU Efficient Environmental Review Process (Section 6002) Kelly Dunlap.
Division of State Lands’ Wetlands Program. Issues That Spawned State Wetlands Program (SB 3) Lack of detailed wetlands inventory information or guidance.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
U.S. Fish and Wildlife Service Ecological Services Utah Field Office.
San Joaquin River NWR Proposed Expansion Planning Process Summer 2011 Fall 2011 Spring 2012 Summer 2012 Public Input Public Input Prepare Draft Environmental.
Lecture(2) Instructor : Dr. Abed Al-Majed Nassar
Endangered Species Act
Module 15 Environmental Considerations Civil Works Orientation Course - FY 11.
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
The Brooks A&E Act National Oceanic & Atmospheric Administration Acquisition & Grants Office January 24, 2006.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
Our mission ead and execute environmental programs and provide expertise that enables Army training, operations, acquisition and sustainable military communities.
FGDC Standards Process Review Survey Results Summary Julie Binder Maitra FGDC Standards Coordinator April 13, 2010 Coordination.
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
Fish and Wildlife Service Mission Conserve, protect and enhance fish, wildlife, and plants and their habitats for the continuing benefit of the American.
Endangered Species Act Section 7 Overview Endangered Species Program, U.S. Fish and Wildlife Service 2001.
Endangered Species Act Section 7 Consultations. The Endangered Species Act Sec. 2:Purpose Sec. 3:Definitions Sec. 4:Listing, Recovery, Monitoring Sec.
The Endangered Species Act 1973, 1982, 1985, 1988 (ESA) Larsen Schlachter Per. 3.
Biological Opinions & Endangered Species Act Consultation – A “How To” Guide for Working with Agencies on ESA Issues MATTHEW A. LOVE Partner- Seattle,
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Wildlife Law Wildlife Conservation Authority: Legal Sources 1) statutory law –
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
Documenting the Participation of Fishing Vessel Crew Members in Alaska’s Commercial Fisheries Documenting the Participation of Fishing Vessel Crew Members.
Water Supply Planning Initiative State Water Commission November 22, 2004.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Technical Assistance Grants to Communities Pipeline Safety Trust Conference New Orleans November 20, 2008 Steve Fischer PHMSA/Office of Pipeline Safety.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
Endangered Species Act Counterpart Regulations for National Fire Plan Projects Bureau of Land Management Forest Service June 9, 2004.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
NOAA Science Advisory Board …advises the Secretary of Commerce for Oceans and Atmosphere on long- and short- range strategies for research, education,
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
US Army Corps of Engineers BUILDING STRONG ® Planning Principles & Procedures – FY11 AUTHORIZATION AND APPROPRIATION OR “It Takes Two to Tango"
Fish and Wildlife : Regulatory Framework and Challenges Cherise M. Oram STOEL RIVES LLP Hydrovision 2008 Ocean/Tidal/Stream Power Track 7D “Environmental.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
The Role of ICS and Management Prepared for: The Interagency Section 7 Streamlined Consultation Training Summit (February 18, 2004)
Stakeholders Meeting November 15,  Review the development and identification of State’s preferred alternative  Provide updates on SCH Project.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
© 2009 Barnes & Thornburg LLP. All Rights Reserved. This page, and all information on it, is the property of Barnes & Thornburg LLP which may not be reproduced,
USDA Natural Resources Conservation Service “Helping people help the land"
The European SEA Directive Simon Marsden School of International Business, University of South Australia Module 1: Basics of SEA.
Cooperating Agency Status Presented by Horst Greczmiel Associate Director, NEPA Oversight Council on Environmental Quality Washington, DC September 14,
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
SUPPLEMENTAL ENVIRONMENTAL PROJECTS. KEY CHARACTERISTICS OF A SEP Projects must improve, protect or reduce risks to public health or environment. Projects.
TOWARDS A COMMON GOAL Coordinating actions under the Clean Water Act (FWPCA) and the Endangered Species Act (ESA)
Division of Federal Program Activities Sikes Act Coordination Activities Fish and Wildlife Service.
Executive Order Environmental Stewardship and Transportation Infrastructure Project Reviews Priority Issues.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
Environmental Issues Update - Endangered Species 1.
Overview & Implementation January 30, Large geographic area (22,360 square miles primarily in VA, NC, and TN)
MRERP Missouri River Ecosystem Restoration Plan and Environmental Impact Statement One River ▪ One Vision A Component of the Missouri River Recovery Program.
Legislative History. First enacted in 1934  Enacted due to concerns over the loss of commercial and sport fisheries from water resource developments.
Michigan Dept. of Environmental Quality Water Resources Division
Nick Bonvoisin Secretary to the Convention on the
Presentation transcript:

Fish and Wildlife Coordination Act (FWCA) Protecting and Conserving Fish and Wildlife Resources Ch. 4 Mod. 1 – HO#10

Fish and Wildlife Coordination Act 2 FWCA Training Course FWS National Conservation Training Center, Shepherdstown, West Virginia ECS3132 For Course Information:

Fish and Wildlife Coordination Act 3 Resources Water Resources Planning Under the Fish and Wildlife Coordination Act (1980) – ( stutzman.pdf) FWCA text Updated (2011) – habitatconservation/fwca.html

Fish and Wildlife Coordination Act 4 One of the major authorities for evaluation of fish and wildlife issues associated with water resource projects. P.L , 1958 Pre-dates NEPA and Endangered Species Act (NEPA was initially proposed as FWCA amendment) Introduction

Fish and Wildlife Coordination Act 5 Introduction NEPA ESA FWCA Other

Need Fish and Wildlife Coordination Act 6

7 Legislative History Act of Promote the Conservation of Wildlife, Fish and Game, and for other Purposes  Authorized the Secretaries of Agriculture and Commerce to provide assistance to Federal and State agencies to protect, rear, stock, and increase the supply of game and fur-bearing animals  Study the effects of domestic sewage, trade wastes, and other polluting substances on wildlife.  Directed the Bureau of Fisheries to use impounded waters for fish-culture stations and migratory-bird resting and nesting areas  Required consultation with the Bureau of Fisheries prior to the construction of any new dams to provide for fish migration.

Fish and Wildlife Coordination Act 8 Legislative History (cont.) Promote economic development and maintain a viable and thriving economy Insure maintenance or restoration of productive habitats and environmental quality Basic problems Congress wanted to address: P.L , Fish and Wildlife Coordination Act 1958 Amendments

Fish and Wildlife Coordination Act 9 Legislative History (cont.) “The fish and wildlife resources of the nation are tremendously important, not only to the physical and spiritual well-being of our people, but to our national economy as well... Commercial fisheries are of major importance to our nation.” Senate report No on the 1958 amendments:

Fish and Wildlife Coordination Act 10 Legislative History (cont.) Gave the Act its current name. Authorized fish and wildlife to be a project purpose. Allows land acquisition and use of project lands and waters for fish and wildlife conservation. Provided for transfer of funds to the FWS Amendments:

Fish and Wildlife Coordination Act 11 Purposes 2. “…wildlife conservation shall receive equal consideration and be coordinated with other features of water resource development programs…” 1. Recognize the vital importance of wildlife resources in relation to water resource development programs in the United States.

Fish and Wildlife Coordination Act Definition of “Wildlife” and “Wildlife Resources” “…include birds, fishes, mammals, and other classes of wild animals and all types of aquatic and land vegetation upon which wildlife is dependent.”

Fish and Wildlife Coordination Act 13 Act Provisions - Fish and Wildlife conservation receives equal consideration with other projects features (co-equal objective of projects!) - Mandatory consultation with wildlife agencies - Full consideration of wildlife agency recommendations - Actions agencies may include recommended means and measures they find to be justified

Fish and Wildlife Coordination Act 14 Coordination Section 2 (a)  Applies to proposals to modify a water body for any purpose  Requires that agencies shall consult with the FWS and State wildlife agency regarding impacts to fish and wildlife.  Applies to projects constructed, permitted, or licensed by a Federal agency.

Fish and Wildlife Coordination Act 15  Requires early coordination with federal and state resource agencies to insure true integration of fish and wildlife opportunities, problems, and potential measures.  Coordinate study problems/ opportunities so FWS can participate on PDT and in alternative formulation.  Initiate during Recon phase, but generally no funding transfer until Feasibility and through project construction. When Does Coordination Occur

Fish and Wildlife Coordination Act  Federal impoundments less than 10 surface acres.  Activities primarily for land management programs by federal agencies (FS, NPS, BLM).  Federal loan, grant and technical assistance actions that do not require a federal permit or license to modify water bodies.  Tennessee Valley Authority. Exemptions to the FWCA

Fish and Wildlife Coordination Act 17 Funding Section 2(e)  Federal construction agencies authorized to transfer funds to FWS from investigation, engineering, or construction appropriations. Funds to be used for all or part of investigations required to carry out the coordination and reporting requirements of Section 2 of the FWCA.

Fish and Wildlife Coordination Act 18 Transfer Funding Agreement  Funds for FWS work are to be included in Corps budget.  Detailed Scopes of Work for FWS work.  Corps to keep FWS informed on studies, projects and funding for FWS involvement.  Funds are NOT transferred for ESA or NEPA activities.  New MOA Signed 22 Jan 2003.

Fish and Wildlife Coordination Act 19 Transfer Funding Agreement (cont.)  Corps consults first with FWS for fish and wildlife information. If mutually agreeable may be contracted. Both parties work together to select the contractor! Product of good relationships.  Close formal and informal coordination.

Fish and Wildlife Coordination Act 20 FWCA Reports  Planning Aid Letter (PAL) or Planning Aid Report (PAR) Not required, but can be provided at any time to document FWS input.  2(b) Report (Fish and Wildlife Coordination Act Report – FWCAR) Draft 2 (b) report normally included in Draft Feasibility/NEPA document. Final 2 (b) report in Final Feasibility/NEPA document.

Fish and Wildlife Coordination Act 21  PAL/PAR can document: Fish and Wildlife problems and opportunities. Concurrence or recommendations regarding assessment methodologies. Description of existing fish and wildlife resources (helpful for EA preparation). Initial evaluation of study alternatives. Does not constitute the final report of the DOI as required by Section 2(b) of the Act. Building block to the 2(b) report. FWCA Reports (cont.)

Fish and Wildlife Coordination Act  Section 2(b) Report Formal report pursuant to Section 2(b) of FWCA. Description of fish and wildlife resources. Future with and without project. Impacts of alternative plans. Recommendations for mitigation and development of fish and wildlife resources Position of FWS (pro or con). FWCA Reports (cont.)

Fish and Wildlife Coordination Act 23 FWCA Reports Based on surveys and investigations conducted by FWS and State to: Determine possible impacts to fish and wildlife FWCA Recommendations Determine mitigation measures that should be adopted Provide recommendations for restoration or improvement of wildlife resources

Fish and Wildlife Coordination Act 24 Consideration  Full consideration is to be given to recommendations of FWS/NMFS and State.  Reporting agency shall include justifiable means and measures for wildlife that should be adopted to obtain maximum overall project benefits.  No requirement that consulting federal agency must follow the advice of State or FWS (Corps decision), but must have a written response in the planning report.

Fish and Wildlife Coordination Act 25 Consideration (cont.)  Corp’s Responsibilities: In addition to including the 2(b) report in documents going to Congress, you must respond in writing to the recommendations of the Service.

Fish and Wildlife Coordination Act 26 Reporting Section 2(b)  Fish and Wildlife Coordination Act Reports Integral part of reports to higher authority: – Division/Headquarters – Congress – Agency/person  Authorizing construction  Approving modification or supplementation

Fish and Wildlife Coordination Act 27 SummarySummary  Provides opportunity for active FWS participation in water resource planning.  Fish and Wildlife issues become part of decision- making/public interest review process. The project planning process is to insure true integration of fish and wildlife issues, opportunities, problems, and features.  Complements NEPA and other environmental laws and places fish & wildlife issues in public review process.  Procedural and advisory law.

Fish and Wildlife Coordination Act 28 How Might the Coordination Process Work? vs.

Fish and Wildlife Coordination Act 29 POLARIZED: WHY?  History Old Feuds / adversarial relationship  Resource Focus (blinders) Mission recognition and differences  Trust “No Service buy in”  Customers and Stakeholders Understanding the cost of doing business Project purpose

30 PRE - NEPA “Thank you for your comments. We will take care of the problem.” i.e. No Service Involvement

31 POST – NEPA (e.g. 1970s) Peripheral Service Involvement Significant Communication Problems “ We plan the project… you plan the mitigation.”

32 Environmental Awareness (1980s) “Avoid and Minimize” Service is interactive Communication still a major issue

33 FEDERAL PROJECTS (1990s to today) Large number of Restoration Projects as Corps gets restoration mission. Seek Service support / partnership Still need to improve communication

Fish and Wildlife Coordination Act 34 CORPS/FWS ISSUE OLD RESOLUTION PROCEDURE

35 Project Management Business Process (PMBP) / Collaborative Planning Preferred Process

Fish and Wildlife Coordination Act Keys to Success  How to best negotiate to ensure equal consideration of fish and wildlife? Involve resource agencies as EARLY as possible Provide timely and adequate project information FWS / State DNR participation as a full and equal planning team member Maintain coordination as often as needed Follow the provisions of the FWCA, Corps guidance, and the National Transfer Funding Agreement

37 And finally…the key to successful projects lies in developing effective partnerships

38 Whoville River tributary Port of Whoville 1 mile to Atlantic Ocean