Project Renovatio Joshua Fraser Alastair Fraser Ruofei Fu Chao Jiang Cheng Zhen Dacheng Zheng Tien Truong.

Slides:



Advertisements
Similar presentations
Variable Frequency Drives Bypass Options
Advertisements

Design for Prius C Plug-In Conversion
The Essential EssentialComponent. No Audio, Lighting or Video System operates without Electricity, but we take its delivery, distribution and control.
Project Renovatio Electric Motorcycle. The Project Convert Honda CBR600F2 to a Fully Electric Motorcycle.
Preparing for Power Outages Like any other part of the infrastructure, electrical power to the campus can fail, either as an isolated incident (e.g., tripped.
Project Renovatio Joshua Fraser Alastair Fraser Ruofei Fu Chao Jiang Cheng Zhen Dacheng Zheng Tien Truong.
Team: – Brad Jensen – Will Klema – Nate Schares Client: – PowerFilm, Inc. Advisor: – Dr. Ayman Fayed Solar-Powered Mobile Power Station (MPS)
Design and Computer Modeling of Ultracapacitor Regenerative Braking System Adam Klefstad, Dr. Kim Pierson Department of Physics & Astronomy UW-Eau Claire.
Air-Conditioning Control Systems
Michigan Tech’s E-Rush Presented by: Terry Gregoricka Adrienne Piron.
Team #2 Solar Car Project Senior Design
Graphic Symbol Location 1. DIN Terminal X52 The machine is powered by electricity using copper cable with 5 wires (3 phase wires + neutral wire +
RULES FOR THE 2013 SOLAR CAR CHALLENGE. Important Dates September 1 to January 31 - “Intent-to-Race” Form This notifies Race Officials of your team’s.
Why EcoStar?. Marc Ellison V.P. of Operations Save fuel expenses and maintenance labor by automatically eliminating unnecessary idling.
Capacitive Electric Load Leveling Systems Conceptual Design Review November 9, 2004 Erin Davis Fred Jessup Benton O’Neil.
Team Hybrid  Daniel Farley  John Hoyt  Sean Frost Hoyt.
A6: Team Rallye Potable Water Still Presented by: Full Group November 15, 2006.
Team Mejor – The Spyder Power Requirements and Distributions Dave Millar Brian Shula - 10/12/04.
Team Hybrid Hoyt MemberSubsystem Sean Frost Electric motor, motor controller, charge controller, charge accumulators Dan Farley Hydraulics system: Pumps,
Chapter 19 Charging Systems.
Critical Design Review Wind Turbine with Gearbox
Electrical Fundamentals
As presented to July Battery Management Systems for Electric Vehicles.
Electric Current and Circuits Review Current CURRENT: a flow of charged particles (electrons) through a conductor Current, I, is measured in amperes,
Motor Vehicle Level 3 Electronics and Electronic Components Resource 1.
Athletic Field Marking Device Anthony Cortese, Ryan Crump, Matthew Lawler, Patrick Shaughnessy (Team Leader), John Sudia.
Heliocentris Commercial Confidential 1 Integration of Industrial Fuel Cells in Technical Applications Using the NEXA ® Training System Dr. Claus Fischer.
Electrical Power Systems
Texas Integrated Energy Solutions. Development Team, Background, Objective, & Justification 2.
1 DESIGN OPTIMIZATION OF A SOLAR RACE-CAR WITH ENERGY MANAGEMENT APPROACH O.Ustun, M.Yilmaz, C.Gokce, U.Karakaya, R.N.Tuncay İstanbul Technical University.
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
WILLIAM KIEWICZ-SCHLANSKER LAFAYETTE COLLEGE LiFePO4 Battery Pack Per-Cell Management System.
MUEV Phase III By: Kevin Jaris & Nathan Golick. Introduction Petroleum is a finite resource. Demand for clean energy is driving the increase in the production.
Component Environmental Test Chamber Jeff Hughes 1, Peter Adam 1, Thong Vo 2 and Phong Ngo 2 1. Department of Mechanical and Material Engineering, 2. Department.
 ABS – Function, Design & Working  ABS types  Recent Advancements  Effectiveness & Limitations  Testing & Validation  Job of the Driver  Closing.
Status Report #5 Automatic Child Safety Gate: Corry Winslow Roger Battles Philip So Description: A telescoping gate with sensor technology through the.
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
EE330 Final Project Lithium Battery Monitor Evan Adkins and Brandon Umscheid.
Switches in Series A heating system is a practical circuit used in homes which has two switches in series. The thermostat switch opens (OFF) when the temperature.
Abilities for a Technological World Unit E. Students will develop abilities to use and maintain technological products and systems National Standard 12.
Solar Jackets’ Racer Battery Management System(BMS) Ali Bibonge Daniel Christopher Paul Martin Mark Slade Taverishima Tsegha December 7th, 2011.
THE PERFECT LIFTGATE BATTERY CHARGING SYSTEM FOR RYDER
Series and Parallel Wiring GET A CALCULATOR!!!!!.
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
The Design of an Electronic Bicycle Monitor (EBM) Team P118: Gary Berglund Andrew Gardner Emrys Maier Ammar Mohammad.
MSU SeaMATE ROV Explorer Class
Client: Department of Electrical and Computer Engineering at ISU Advisor: Professor R. Patterson III Team Members: Daniel J. Marquis (EE – 1 st ) – team.
Avoid _____________ _____________ _____________ _____________ _____________ _____________.
PHSAUTOMOTIVESALSPHSAUTOMOTIVESALS Electric Cooling Fans.
K UMU A ’ O C UBESAT Amy Blas March 7, W HAT IS C UBE S AT ? 10x10x10 centimeter cube Launched in lower earth orbit (LEO) Started last semester.
Electrical and Computer Engineering Midway Design Review Team 22: Driver Assist.
Group Members: Dan Brownlee Sean Harriman Andrew Robison James Evans Joshua Doores.
Solar Powered LED Blinds Group 28: Austin Estes and Kerr Oliva TA: Katherine O’Kane.
It all started simple…. One Alternator One Battery One Starter Motor.
Auto turn off battery charger Auto turn off battery charger.
Electrical and Computer Engineering Cumulative Design Review Team 22: Driver Assist.
Initial Pilot Ground School
PPT of topic § Electric Cars and Hybrid vehicles - Electric Cars
Starting System Circuit Operation and Testing
Hybrid Transaxle.
HV Battery Assembly.
Road signs Speed limit No right turn Slippery road No entry
Brendan Flood, Gerard deBlasi, John Fedak IV Lafayette College
WINDMILL (NO GEARBOX): CDR
Instrumented Beehive Team 1: CSE: Max Aukshunas, Manali Palwankar
Project Renovatio Joshua Fraser Alastair Fraser Ruofei Fu Chao Jiang
DfX and DFMEA.
Automotive Technology Principles, Diagnosis, and Service
Presentation transcript:

Project Renovatio Joshua Fraser Alastair Fraser Ruofei Fu Chao Jiang Cheng Zhen Dacheng Zheng Tien Truong

Project Overview -Gas to electric motorcycle conversion. -Electrical engineering team in charge of electrical components and wiring instructions. -Component sourcing finished, all necessary parts ready to be ordered. -DC/DC converter, coolant pump, headlight/taillight, G-force switch, relays, fuses -The goal is to have a fully functional electric motorcycle, able to be driven and operated safely.

System-Level Wiring Diagram NEXT PAGE

System Decomposition

Key Technologies ●In order to step down the voltage from the battery packs to a low voltage of 12 V for the low voltage system, a DC to DC converter is required. Only a maximum of 150 W will be pulled by the low voltage system, and the DC to DC converter is able to handle 200 W. ●In order to ensure that each battery drains equally over time, a battery management system is required to continually balance the battery voltages. ●There are many key safety mechanisms being employed, since such high voltages and currents can be very unsafe. Fuses will be in use for each wire in the low voltage system to have shutoff capability if something goes wrong. Also for the high voltage system, there will be a couple manual switches, as well as an automatic switch, that will cut power in case of emergency. ●The Arduino microcontroller is key in controlling the low voltage system. It will handle the braking switch, the lights, the main contactor, and will also monitor the status of several subsystems.

Software Processes ●Control Systems Integration Module (CSIM) to collect data, relay it to the rider in an effective way and store in an efficient manner. o Android tablet, Arduino Bluno and CAN shield. ●Collecting data via a Central Area Network (CAN) bus on the Arduino Bluno. o Operates on a serial bus and uses a priority bit system. o Data collected from three systems  Two motor controllers and BMS.

Software Processes ●Motor Controllers o RPM o Motor Temperature o Motor Side Current o Battery Side Current o Battery Side Voltage ●BMS o Individual Cell Voltage (37 data points) o Sub-Pack Cell Voltage (12 cells) o Entire Pack Voltage (37 cells) o Pack Current o Pack Temperature (4 thermistors) o Minimum Cell Voltage o Maximum Cell Voltage o Calculated Remaining Power o Recharge Power

Test Plans Battery & BMS (Sensor, IR temp gun, DC load) 1st Week of April -Battery discharge and recharge rate and duration -Max temperature during charging/discharging DC/DC Converter (DC load, Spec Any, IR temp gun) 1st Week of April -Voltage stability under highest expected load -Max temperature under highest expected load Safety and Accessories (Power supply & Multimeter) 2nd Week of April -Safety switches correctly stop current -Relay turns on high voltage system -Lights operate

Test Plans Pre Full Assembly (Sensors, Power, IR temp gun) 3rd Week of April -Water pump and tubing operate without leaking -Motor operates with full control -Max motor temperature Post Assembly (Sensors, IR temp, Dynamometer) 3rd-4th Week of April -All systems operate on lift -Bike top speed and acceleration/torque -Bike distance on full charge -Motor temperature while riding -Water/rain susceptibility

Resolving Action Items ●How would the accelerometer gauge an accident instead of someone clutching the brakes? o The minimum trip threshold of the inertial crash is much greater than that can be applied by the brakes without throwing the rider. o Emergency shutdown for the electronics is necessary in the situation of a crash but we don’t believe the accelerometer will be necessary. ●Plans for waterproofing subsystems o Battery boxes will not be waterproof, so a protective polycarbonate shield will be installed around the batteries and electronics. Also will protect against debris picked up under the fairings.

Resolving Action Items ●What are the plans for providing overvoltage/overcurrent protection for the Arduino? o Relying on DC-DC converter to maintain its 12V output. o We are collecting data using the CAN bus and requires a low voltage and current. ●How to test G-force necessary for crash? o Accelerating the motorcycle at full current and braking as hard as physically possible without locking the wheels. This is still a stretch goal for us. ●Back-up plans for testing if equipment is not available? o Reserved a date with Rawhide Harley to use their dyno. o Rest of testing can be done using EECS lab equipment such as electronic load and multimeter.

Milestones ●Milestone 1: Isolation Testing o Ensure the input and output voltages, currents and power are met for each subsystem. o Deliverables: data measurements, documentation for test equipment and methods. ●Milestone 2: System Integration and Testing o Validate that the LVS and HVS work separately before integrating both. o Deliverables: data measurements, documentation of assembly and test methods. ●Final Demonstration o Showcase bike on a lift and a short video (possibly).

Project Schedule

Project Items ●On-going ● Component installation is waiting on parts to be ordered. All needed components have been sourced. ● Testing and evaluation will proceed when the parts are installed. Some isolation testing will be done. ● Motorcycle frame and additional infrastructure (battery boxes, extra framing) will be fully built by 4/1. ●Completed ●Created a testing and evaluation plan ● Familiarized with the system and objectives, and have a functional system decomposition ●Created a risk mitigation plan for all processes we could think of that could potentially be at risk ● Successfully sourced all of the needed components, and are ready to order and install

Challenges ●Getting everything done before their deadlines. With such a big project, it is difficult to hit every deadline with so many moving parts. But it is critical to hit the deadlines so that Electrical team can pass off the project to Computer team for final construction and wiring. ●Making the motorcycle as safe as possible. With such high voltages and currents it can potentially be dangerous if certain systems fail, or if any potential hazard has gone unnoticed.

Questions? ●Project Site: o project-renovatio.bitballoon.com project-renovatio.bitballoon.com