Bringing it all Together: Oil & Gas Operations after Acquisition and Diligence Gina M. Banai.

Slides:



Advertisements
Similar presentations
Well Permitting & Approvals
Advertisements

Erosion and Sediment Control General Permit (ESCGP-1)
Golf Course Construction Planning TRF 250 Golf/Sports Field Construction.
OCPS SCHOOL SITE SELECTION PROCESS
Hazard Mitigation Assistance and the Mineral Rights Policy Gene Gruber FEMA Region III Director, Mitigation Division.
BLM Bureau of Land Management Oil and Gas Permitting Process Expediting Oil and Gas Development in Western States Kent Hoffman.
Megan E. Smith, Esq. Buchanan Ingersoll & Rooney PC August 1, 2013 Pipeline Planning, Permitting, Construction and Operation: Introduction.
David K. Paylor Director, Department of Environmental Quality May 27, 2014 VEDP Lunch & Learn Environmental Permitting 101.
PENNSYLVANIA MARCELLUS SHALE With All the New Drilling, Gathering Pipelines Are Going In all Over – Is This a Problem?
The BC Oil & Gas Commission Proactively Participating in Project Decision Making Processes James O’Hanley Deputy Commissioner.
Earth Disturbance Programs  Chapter 102 –Erosion Control & NPDES Permits  Chapter 105-General Permits  Dirt & Gravel Roads Program.
DEP Information Meeting/Hearing Elcon Recycling Services LLC Falls Township Municipal Building Dec. 10, 2014.
Water Issues Related to Marcellus Gas Drilling Activity Water Issues Related to Marcellus Gas Drilling Activity Bryan Swistock Water Resources Extension.
National Geothermal Policy and Regulation R. Gordon Bloomquist, Ph.D. Washington State University Energy Program Salt Lake City, Utah 20 January 2004.
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
Presented by Northwest Savings Bank ©2011 Employment and Business Opportunities in Pennsylvania's Oil and Gas Industry.
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
Spectra Energy Partners Texas Eastern Transmission, LP Ohio Pipeline Energy Network Project (OPEN) Clean Water Act Section 401 Water Quality Certification.
(c) 2009, Sterling Environmental Engineering, P.C. 1 A PROACTIVE MUNICIPAL RESPONSE TO NATURAL GAS DEVELOPMENT December 2, 2009 Mark P. Millspaugh, P.E.
Clean Water Act Section 404 Basics Clean Water Act Section 404  Regulates discharges of dredged or fill material into waters of the U.S., including.
Energy Law and Policy Fall,  8/26:INTRODUCTION AND BACKGROUND  8/28:Energy jobs; Jim Halloran, PNC Bank.  9/4: History of energy regulation 
US Army Corps of Engineers BUILDING STRONG ® Coordinating U.S. Army Corps of Engineers Regulatory Permits with Species Conservation Plans November 16,
Marketable Securities
ADVANCED MINE SOLUTIONS CANADIAN MINING EXPERTISE ADVANCED MINE SOLUTIONS | Professional Canadian Mining Consultants _____________________________________________________________________________.
Permits. The Process Plans are developed by an Architect or Engineer and presented to the Municipality – State Environmental Quality Review (SEQR) declaration.
1. Identify Stakeholders 2. Establish the Criteria 3. Identify Potential Sites 4. Initial Screening/ Evaluations & Short List 5. Specific Site Study 6.
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
The Saskatchewan Natural Gas Advantage Licensing of Wells and Facilities J. A. Brian Mathieson, Director Petroleum Development Branch.
Bureau of Land Management Solid Minerals Programs June 12, 2013.
Interlocal Agreement – Transportation Impact Fees City Council Workshop July 9, 2013.
Norse Energy Corp., USA  As natural gas assumes a far more important role in America’s energy mix, Norse Energy is committed to exploring, developing,
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
E&P STORM WATER OVERVIEW Domestic Onshore Energy E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005.
Introduction to Construction General Permit Inspections.
© 2013 Copyright Buchanan Ingersoll & Rooney PC Upstream Oil and Gas Leasing and Acquisitions Lisa Pampena August 2013.
PETROLEUM LAND ADMINISTRATION OVERVIEW PRESENTATION BY CAPLA Regulatory Committee.
Environmental Issues Associated with Oil and Natural Gas Extraction, Transport and Processing in the Marcellus and Utica Shale Region of Ohio Joe Bonnell,
Permit Process.
Phased Environmental Impact Assessment (EIA) Process for Oil & Gas Development in New Brunswick Department of Environment January 2011.
Selecting the Right Site for New Nuclear Generation Southern Nuclear Operating Company Tom Moorer – Nuclear Development Environmental Manager.
Energy Exploration & Development On National Forest System Lands Barry Burkhardt
The Saskatchewan Natural Gas Advantage Availability of Crown Mineral Rights Ed Dancsok, P Eng., P Geo. Director Geology & Petroleum Lands.
Marin Coastal Permit Coordination Program. Why do we need a program? Called for in Watershed Plans: As many as 9 permits to consider for restoration.
NATURAL GAS LEASES Understanding Your Rights Protecting Your Interests Agricultural Law Resource and Reference Center Ross H. Pifer, J.D., LL.M., Director.
Proposed Dwayne Lane Dealership Reference Slides.
The Clean Water Act © Dr. B. C. Paul (Jan. 2000).
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Former DuPont Barksdale Works Project Update May 19, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Overview of the 401 WQC Process. Main Topics Relationship between Clean Water Act Sections 404 and 401 State permitting processes Specifics of Kentucky’s.
HYDROLOGIC DATA. BACKGROUND Analysis and synthesis of data is required to perform any hydrologic computation. The engineer needs to: Identify and define.
Storm Water Permitting. Oil And Gas Operator Concerns  Impacts of Storm Water Permitting on Operators who do business primarily – On Privately Owned.
Overview of Legal Issues in Marcellus Shale Development Penn State Ag Council Membership Meeting October 12, 2009 Agricultural Law Resource and Reference.
ESD 112 Land Acquisition. Review of Activities to Date Identified a variety of properties Conducted Board presentations/tours Conducted “level 1” due.
Introduction to BMPs U.S. Department of the Interior Bureau of Land Management May 2006.
* Environmental Sciences * Surface Water/Groundwater Permitting * Water Quality Sampling * Wetland Delineation * Cultural Resource Management * Civil/Municipal.
105 Updates and Top Challenges For SEPA RC&D Engineer’s Workshop Montgomery County Community College May 24, 2016.
© 2010 The Williams Companies, Inc. All rights reserved. Safe and Reliable.
Carolina North Carolina North Annual Report for Chapel Hill Town Hall September 29, 2010.
Suffolk County PDR Program Permits and Bi-Annual Review Andrew Amakawa Suffolk County Department of Economic Development and Planning.
Local Development (San Diego)  Development Services is responsible for managing the majority of the construction and development project review services.
Legislation Governing Horizontal Drilling in West Virginia §22-6 portion of West Virginia Environmental Resources law governing Oil and Gas Wells August.
Programmatic Agreements
Barriers and Challenges to Developing Renewable Energy Projects
Petroleum Accounting.
THE CORPS REGULATORY AUTHORITY
Concept Plan for Proposed Park Near Hopewell School
Utility Permitting Overview
Marcellus Well Pad Constructability
Presentation transcript:

Bringing it all Together: Oil & Gas Operations after Acquisition and Diligence Gina M. Banai

Exploration & Production Phases  Acquisition  Planning & Permitting  Construction  Drilling  Completions  Production  Midstream 2

3 Acquisition

4 The process of acquiring a Working Interest in Oil and Gas Leases for development □ Landowners □ Brokers □ Oil & Gas Operators □ Purchase in Fee Acquisition

5 Planning & Permitting

6 Well site location and design is typically based upon the following factors: □ Geology □ Landowner preference □ Current infrastructure in place  Roads, pipelines, etc. □ Environmental restrictions  Wetlands, streams Planning & Permitting

7 ESCGP-2 Permit □ Earth Disturbance General Permit □ Stream and wetland crossings Highway Occupancy Permit (HOP) Well Permit Joint Permit Application □ For larger scale projects- when certain criteria are in place the Army Corps of Engineers and DEP must both evaluate and approve plans Township Permits □ Sewage □ Grading Planning & Permitting

8 ESCGP

9 Well

10 Construction

11 Construction

12 Construction

13 Drilling

14 Drilling

15 Drilling

16 Drilling

17 Drilling

18 Completions

19 Completions

20 Completions

21 Flare

22 Production

23 Production

24 Production

25 Production

26 Production

27 Production

28 Midstream

29 Midstream

30 Midstream