SISIFO-GAS A COMPUTERIZED SYSTEM TO SUPPORT SEVERE ACCIDENTS TRAINING AND MANAGEMENT WGRisk Workshop March 29-31, 2004 Köln, Germany César Serrano.

Slides:



Advertisements
Similar presentations
System Development Life Cycle (SDLC)
Advertisements

What is Software Design?. Systems Development Life- Cycle Planning Analysis Design Implementation Design.
Case Tools Trisha Cummings. Our Definition of CASE  CASE is the use of computer-based support in the software development process.  A CASE tool is a.
Manufacturing Productivity Solutions Management Metrics for Lean Manufacturing Companies Total Productive Maintenance (T.P.M.) Overall Equipment Effectivity.
Integration of Quality Into Accident Investigation Processes ASQ Columbia Basin Section 614 John Cornelison January 2008.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Chapter 19: Network Management Business Data Communications, 4e.
PSAEA – CNRA Conference on OEF (Köln, 29-31/05/2006) The relationship between risk analysis and event analysis – PSA based Event Analysis P. De Gelder.
Marakas: Decision Support Systems, 2nd Edition © 2003, Prentice-Hall Chapter Chapter 1: Introduction to Decision Support Systems Decision Support.
©2003 Prentice Hall Business Publishing, Accounting Information Systems, 9/e, Romney/Steinbart 18-1 Accounting Information Systems 9 th Edition Marshall.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
HORIZONT 1 TWS/Graph HORIZONT Software for Datacenters Garmischer Str. 8 D München Tel ++49(0)89 / TWS/Graph The.
Segment Two: Business Requirements Drive the Technical Updates January 26-27, 2012 Idaho ICD-10 Site Visit Training segments to assist the State of Idaho.
MODULE “STRATEGY DEVELOPMENT”
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Coat paper or board using a coating.
Introduction to Computer Technology
Structure Commander Technical Presentation. Copyright (C) MCS 2013, All rights reserved. 2 STRUCTURE COMMANDER Introduction Product Overview.
Front Page …..is an Asset Management tool designed to record and aid the analysis of activities affecting Production capability and costs. …..promotes.
E-LABORATORY PRACTICAL TEACHING FOR APPLIED ENGINEERING SCIENCES W O R K S H O P University of Oradea, Romania February 6, 2012 G E N E R A L P R E S E.
March “Experience Gained from the Mexican Nuclear Regulatory Authority in the Probabilistic Safety Assessment Level 2 Development for Laguna.
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
No: 1 CEMSIS 1 WP3 - Use of pre-developed products Key issues N. Thuy EDF R&D.
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
1 NKS R ResearchSeminars Competence & Education Exchange of information Safety advancements 21 March …
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 3 Receive and store logs in a woodyard.
Chapter 6 : Software Metrics
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) 1 International Workshop On Level 2 PSA and Severe Accident Management Hosted by:
Turbine Crane CRANES TURBINE NEA39. Turbine Crane PLANT STATUS! PV Daily Status Report.
1 Introduction to Software Engineering Lecture 1.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Provide a continuous supply of.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Produce chemical compounds by.
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Probabilistic Safety Analysis Technology (PSA) TACIS R3.1/91.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Produce super- calendered paper.
APPLY FUNCTIONAL MODELING TO CONSEQUENCE ANALYSIS IN SUPERVISION SYSTEMS Present by Xinxin Zhang 1 Morten Lind 1, Giulio Gola 2,
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 2 Prepare and supply washed and.
Framework of a Simulation Based Shop Floor Controller Using HLA Pramod Vijayakumar Systems and Industrial Engineering University of Arizona.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Generate chlorine dioxide for.
International Atomic Energy Agency M. El-Shanawany IAEA Technical Support & Capacity Building Programme M. El-Shanawany Department of Nuclear Safety &
Differences Training BAAN IVc - BaanERP 5.0c: Development BaanERP 5.0c Tools.
Free-range views of the properties based on various criteria Maintenance with automatic appointment- and event-driven triggering and printout Covering.
IAEA International Atomic Energy Agency Technical Meeting on the Demonstration of Operational and Long Term Safety of Predisposal Management Facilities.
Human Reliability HUMAN RELIABILITY HUMAN ERROR
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Temelin NPP Risk Panel A PSA and Safety Monitor Application Workshop Information.
IAEA International Atomic Energy Agency New IAEA Safety Guide (information) Human Factor Engineering for NPP (DS492) Alexander Duchac SAS,NSNI.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 2 Produce cut cores for the pulp.
Low Power and Shutdown PSA IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
Initiating Event Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Understand the fundamental process.
Embedded System Design and Development Introduction to Embedded System.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making “Overview of Level 2 PSA” Workshop Information IAEA Workshop City, Country.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
An overview of I&C Systems in APR 1400 Parvaiz Ahmed Khand December 28, 2007.
Advanced Higher Computing Science The Project. Introduction Worth 60% of the total marks for the course Must include: An appropriate interface using input.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 2 Produce bales of waste paper using.
Manufacturing Productivity Solutions
System Design and Modeling
Developing Information Systems
Regulatory Control Training Workshop
Test Case Test case Describes an input Description and an expected output Description. Test case ID Section 1: Before execution Section 2: After execution.
IAEA Technical Support & Capacity Building Programme M. El-Shanawany
PSS verification and validation
TOS Control – main idea and scheme
Presentation transcript:

SISIFO-GAS A COMPUTERIZED SYSTEM TO SUPPORT SEVERE ACCIDENTS TRAINING AND MANAGEMENT WGRisk Workshop March 29-31, 2004 Köln, Germany César Serrano

WGRisk Workshop, Mar-2004 SISIFO-GAS 2 TABLE OF CONTENTS INTRODUCTION BACKGROUND TECHNICAL DESCRIPTION CHARACTERISTICS DEMO INTRODUCTION BACKGROUND TECHNICAL DESCRIPTION CHARACTERISTICS DEMO

WGRisk Workshop, Mar-2004 SISIFO-GAS 3 INTRODUCTION I - 1/3 SEVERE ACCIDENT TRAINING SEVERE ACCIDENT MANAGEMENT Property of: SISIFO-GAS DATABASE ON-LINE PLANT DATA GRAPHIC INTERFACE DECISION MODULES MAAP4

WGRisk Workshop, Mar-2004 SISIFO-GAS 4 TECNATOM ENGINEERING SERVICES COMPANY COVERING THE FOLLOWING AREAS: TRAINING AND SIMULATION: PWR AND BWR FULL-SCOPE, MULTI- FUNCTIONAL SIMULATORS,….. PLANT OPERATION SUPPORT: EOP AND SAMG’S DEVELOPMENT AND TRAINING, MAN-MACHINE INTERFACE,….. INSPECTION (STRUCTURAL INTEGRITY), TESTING (NON-DESTRUCTIVE) AND MATERIALS. DESIGN AND MANUFACTURING, EXPERIMENTAL FACILITIES TECNATOM ENGINEERING SERVICES COMPANY COVERING THE FOLLOWING AREAS: TRAINING AND SIMULATION: PWR AND BWR FULL-SCOPE, MULTI- FUNCTIONAL SIMULATORS,….. PLANT OPERATION SUPPORT: EOP AND SAMG’S DEVELOPMENT AND TRAINING, MAN-MACHINE INTERFACE,….. INSPECTION (STRUCTURAL INTEGRITY), TESTING (NON-DESTRUCTIVE) AND MATERIALS. DESIGN AND MANUFACTURING, EXPERIMENTAL FACILITIES TECNATOM CAPACITIES I - 2/3

WGRisk Workshop, Mar-2004 SISIFO-GAS 5 IBERDROLA Ingeniería y Consultoría (IBERINCO) ENGINEERING AND CONSULTING SERVICES COMPANY COVERING THE FOLLOWING AREAS: CONSULTING AND STUDIES: SITE/IMPLEMENTATION, SAFETY SYSTEMS ASSESSMENT,…. PROJECT ENGINEERING: DESIGN MODIFICATIONS, FINAL SAFETY STUDY UPDATING, RADIOLOGICAL PROTECTION,….. OPERATION ENGINEERING: LICENSE AND SAFETY ANALYSIS, PSA, SUPPORT TO NUCLEAR FUEL MANAGEMENT, WASTE MANAGEMENT. MAINTENANCE ENGINEERING IBERDROLA Ingeniería y Consultoría (IBERINCO) ENGINEERING AND CONSULTING SERVICES COMPANY COVERING THE FOLLOWING AREAS: CONSULTING AND STUDIES: SITE/IMPLEMENTATION, SAFETY SYSTEMS ASSESSMENT,…. PROJECT ENGINEERING: DESIGN MODIFICATIONS, FINAL SAFETY STUDY UPDATING, RADIOLOGICAL PROTECTION,….. OPERATION ENGINEERING: LICENSE AND SAFETY ANALYSIS, PSA, SUPPORT TO NUCLEAR FUEL MANAGEMENT, WASTE MANAGEMENT. MAINTENANCE ENGINEERING IBERINCO CAPACITIES I - 3/3

WGRisk Workshop, Mar-2004 SISIFO-GAS 6 BACKGROUND BEGINNING ( ):HALDEN PROJECTHALDEN PROJECT APPLICATION ( ):COFRENTES NPPCOFRENTES NPP BEGINNING ( ):HALDEN PROJECTHALDEN PROJECT APPLICATION ( ):COFRENTES NPPCOFRENTES NPP B - 1/5

WGRisk Workshop, Mar-2004 SISIFO-GAS 7 BACKGROUND B - 2/5 OECD HALDEN REACTOR PROJECT TITLE: “DEVELOPMENT OF AN EXTENSION OF THE CAMS SYSTEM TO SEVERE ACCIDENTS MANAGEMENT” ORIGINAL DEVELOPMENT : COMPUTERISED ACCIDENTS MANAGEMENT SUPPORT (CAMS)ORIGINAL DEVELOPMENT NEW CONTRIBUTION, EXTENSION TO SEVERE ACCIDENTS FOR GENERIC BWR AND PWR:NEW CONTRIBUTION –DIAGNOSIS AND FITTING MODULES DEVELOPMENT –INTERFACE WITH THE TRACKING/PREDICTIVE SIMULATOR (MAAP4) OECD HALDEN REACTOR PROJECT TITLE: “DEVELOPMENT OF AN EXTENSION OF THE CAMS SYSTEM TO SEVERE ACCIDENTS MANAGEMENT” ORIGINAL DEVELOPMENT : COMPUTERISED ACCIDENTS MANAGEMENT SUPPORT (CAMS)ORIGINAL DEVELOPMENT NEW CONTRIBUTION, EXTENSION TO SEVERE ACCIDENTS FOR GENERIC BWR AND PWR:NEW CONTRIBUTION –DIAGNOSIS AND FITTING MODULES DEVELOPMENT –INTERFACE WITH THE TRACKING/PREDICTIVE SIMULATOR (MAAP4)

WGRisk Workshop, Mar-2004 SISIFO-GAS 8 Plant Data Data Acquisition Signal Validation Man-Machine Interface PSA Module Strategy Generator Critical Function Monitor CAMS - ORIGINAL DEVELOPMENT APROS Tracking/Predictive Simulator Non-Severe Accident State Identification B - 3/5

WGRisk Workshop, Mar-2004 SISIFO-GAS 9 CAMS - NEW DEVELOPMENT Plant Data Data Acquisition Signal Validation Diagnosis Module MAAP 4 Tracking/Predictive Simulator Severe Accident Fitting Module Man-Machine Interface PSA Module Strategy Generator Critical Function Monitor B - 4/5

WGRisk Workshop, Mar-2004 SISIFO-GAS 10 BACKGROUND B - 5/5 COFRENTES NPP APPLICATION (1096MWe, BWR/6 GE DESIGN, MARK-III CONTAINMENT) TAKING AS STARTING POINT THE HALDEN GENERIC MODULES, THE DEVELOPMENT OF THE SPECIFIC DIAGNOSIS / FITTING MODULES FOR THE PLANT WAS CARRIED OUT. THE MAAP4 CODE WAS SELECTED AS TRACKING/PREDICTIVE SIMULATOR DUE TO THE LARGE EXPERIENCE OF USE INTO THE PSA/IPE. NEW CAPACITIES: –INTERACTIVE GRAPHIC CAPACITY –DATABASE WITH MAAP SEQUENCES (PROGNOSIS) –MAN-MACHINE INTERFACE: SCADA-FACTORY LINK COFRENTES NPP APPLICATION (1096MWe, BWR/6 GE DESIGN, MARK-III CONTAINMENT) TAKING AS STARTING POINT THE HALDEN GENERIC MODULES, THE DEVELOPMENT OF THE SPECIFIC DIAGNOSIS / FITTING MODULES FOR THE PLANT WAS CARRIED OUT. THE MAAP4 CODE WAS SELECTED AS TRACKING/PREDICTIVE SIMULATOR DUE TO THE LARGE EXPERIENCE OF USE INTO THE PSA/IPE. NEW CAPACITIES: –INTERACTIVE GRAPHIC CAPACITY –DATABASE WITH MAAP SEQUENCES (PROGNOSIS) –MAN-MACHINE INTERFACE: SCADA-FACTORY LINK

WGRisk Workshop, Mar-2004 SISIFO-GAS 11 TECHNICAL DESCRIPTION FUNCTIONAL DIAGRAM T - 1/7 SCADA DIAG. M FITT. M MAAP 4 DATAMAAP GRAPHIC INTERF. SIEC COFRENTES NPP WINDOWS 95WINDOWS NT SOFTWARE REQUIREMENTS

WGRisk Workshop, Mar-2004 SISIFO-GAS 12 T - 2/7 DIAGNOSIS MODULE THE PURPOSE OF THE DIAGNOSIS MODULE IS TO DETERMINE THE PLANT STATE TO BE USED INTO THE FITTING MODULE AND IN THE PREPARATION OF THE ENTRY DATA TO THE SIMULATOR CODE DATA PLANT IDENTIFICATION –LIST OF RELEVANT SIGNALS, PARAMETERS AND SYSTEMS THAT COULD INFLUENCE THE ACCIDENT EVOLUTION DETERMINE THE PLANT STATE (INITIATOR EVENT, SYSTEMS AND BARRIERS OF RETENTION) THROUGH LOGIC RULES: –MANAGEMENT OF THE INSTRUMENTATION DATA AND THEIR VARIATION –LOGIC RULES DEFINED AS LOGIC TREESLOGIC TREES –PARAMETER PROCESSING STRUCTURE USING FUZZY LOGIC DIAGNOSIS MODULE THE PURPOSE OF THE DIAGNOSIS MODULE IS TO DETERMINE THE PLANT STATE TO BE USED INTO THE FITTING MODULE AND IN THE PREPARATION OF THE ENTRY DATA TO THE SIMULATOR CODE DATA PLANT IDENTIFICATION –LIST OF RELEVANT SIGNALS, PARAMETERS AND SYSTEMS THAT COULD INFLUENCE THE ACCIDENT EVOLUTION DETERMINE THE PLANT STATE (INITIATOR EVENT, SYSTEMS AND BARRIERS OF RETENTION) THROUGH LOGIC RULES: –MANAGEMENT OF THE INSTRUMENTATION DATA AND THEIR VARIATION –LOGIC RULES DEFINED AS LOGIC TREESLOGIC TREES –PARAMETER PROCESSING STRUCTURE USING FUZZY LOGIC TECHNICAL DESCRIPTION

WGRisk Workshop, Mar-2004 SISIFO-GAS 13 VESSEL FAILURE EARLY BYPASS NO BYPASS LATE BYPASS 1 HOUR AFTER VESSEL FAILURE DRYWELL BYPASS DRYWELL BYPASS NO YES NO YES NO YES NO YES TDW - TVESSEL >1 HOUR NO YES LOGIC RULES - DRYWEL BYPASS T - 3/7

WGRisk Workshop, Mar-2004 SISIFO-GAS 14 T - 4/7 FITTING MODULE THE PURPOSE OF THE FITTING MODULE IS TO CONTROL THE MAAP4 CODE EXECUTION COMPARING THEIR RESULTS WITH THE DATA PLANT (SIEC) PROCESSED THROUGH THE DIAGNOSIS MODULE EVALUATION OF THE DIFFERENCES: –SYSTEMS STATUS –PARAMETERS OF THE SOURCE TERM CATEGORY LOGIC TREE (PSA- LEVEL 2, STC) DETERMINE THE STC THROUGH LOGIC RULES: –LOGIC RULES DEFINED AS LOGIC TREESLOGIC TREES –PARAMETER PROCESSING STRUCTURE USING FUZZY LOGIC ADJUST THE INPUT MAAP4 CODE TO REPRODUCE THE SEQUENCE FITTING MODULE THE PURPOSE OF THE FITTING MODULE IS TO CONTROL THE MAAP4 CODE EXECUTION COMPARING THEIR RESULTS WITH THE DATA PLANT (SIEC) PROCESSED THROUGH THE DIAGNOSIS MODULE EVALUATION OF THE DIFFERENCES: –SYSTEMS STATUS –PARAMETERS OF THE SOURCE TERM CATEGORY LOGIC TREE (PSA- LEVEL 2, STC) DETERMINE THE STC THROUGH LOGIC RULES: –LOGIC RULES DEFINED AS LOGIC TREESLOGIC TREES –PARAMETER PROCESSING STRUCTURE USING FUZZY LOGIC ADJUST THE INPUT MAAP4 CODE TO REPRODUCE THE SEQUENCE TECHNICAL DESCRIPTION

WGRisk Workshop, Mar-2004 SISIFO-GAS 15 EVENT-V STC 61 YES RPV VENTED NO STC 2 YES RPV FAILURE CONTAINMENT FAILURE TIME CONTAINMENT FAILURE TIME NO YES NO STC 59STC 60 C NO CF LATE CF EARLY CF B STC 53 LATE CF EARLY CF NO CF A LOGIC RULES - STC T - 5/7

WGRisk Workshop, Mar-2004 SISIFO-GAS 16 T - 6/7 SCADA (FACTORY LINK) (SCADA - DATABASE - GRAPHIC INTERFACE) SCADA PROCESS IN REAL TIME DATA OF ALL MODULAR STRUCTURES REQUIRED (SIEC, MODULES, MAAP4 AND THE GRAPHIC INTERFACE) DATABASE OF ACCIDENT SEQUENCES ANALYSED WITH MAAP: –GENERAL DESCRIPTION –TIMING OF EVENTS –SYSTEMS/BARRIERS STATUS –SOURCE TERM RELEASED –OUTPUT VARIABLE PLOTS GRAPHIC INTERFACE SHOWING THE ACCIDENTS EVOLUTION AND WITH INTERACTIVE CAPACITIES TO BE USED WITH THE TRAINING MODE SCADA (FACTORY LINK) (SCADA - DATABASE - GRAPHIC INTERFACE) SCADA PROCESS IN REAL TIME DATA OF ALL MODULAR STRUCTURES REQUIRED (SIEC, MODULES, MAAP4 AND THE GRAPHIC INTERFACE) DATABASE OF ACCIDENT SEQUENCES ANALYSED WITH MAAP: –GENERAL DESCRIPTION –TIMING OF EVENTS –SYSTEMS/BARRIERS STATUS –SOURCE TERM RELEASED –OUTPUT VARIABLE PLOTS GRAPHIC INTERFACE SHOWING THE ACCIDENTS EVOLUTION AND WITH INTERACTIVE CAPACITIES TO BE USED WITH THE TRAINING MODE TECHNICAL DESCRIPTION

WGRisk Workshop, Mar-2004 SISIFO-GAS 17 T - 7/7 SOFTWARE REQUIREMENTS ACCIDENT ANALYSIS CODE: MAAP CODE (MINOR MODIFICATIONS) SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA): FACTORY LINK (RUN TIME LICENSE) EQUIPMENT CONNECTIVITY: PC ANYWHERE DATABASE IN ACCESS: DATAMAAP DIAGNOSIS & FITTING MODULES: –LOGIC RULES WITH C CODE –PARAMETER PROCESSING STRUCTURE WITH A FUZZY LOGIC BASED PROGRAMME OTHER INTERFACE PROGRAMMES SOFTWARE REQUIREMENTS ACCIDENT ANALYSIS CODE: MAAP CODE (MINOR MODIFICATIONS) SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA): FACTORY LINK (RUN TIME LICENSE) EQUIPMENT CONNECTIVITY: PC ANYWHERE DATABASE IN ACCESS: DATAMAAP DIAGNOSIS & FITTING MODULES: –LOGIC RULES WITH C CODE –PARAMETER PROCESSING STRUCTURE WITH A FUZZY LOGIC BASED PROGRAMME OTHER INTERFACE PROGRAMMES TECHNICAL DESCRIPTION

WGRisk Workshop, Mar-2004 SISIFO-GAS 18 CHARACTERISTICS OPERATIONAL MODES ON-LINE PROCESSES –TREATMENT OF THE PLANT DATA TO IDENTIFY POTENTIAL ACCIDENTAL SEQUENCES (INITIAL EVENTS INTO THE DIAGNOSIS MODULE) AND CONTROL THEIR EVOLUTION: MODULES CONTROL ACCIDENT MANAGEMENT MODE OFF-LINE PROCESSES –USER-FRIENDLY CAPACITIES DEVELOPED AROUND THE MAAP CODE TO IMPROVE THE KNOWLEDGE ABOUT THE SEQUENCES EVOLUTION: ACCIDENT TRAINING MODE OPERATIONAL MODES ON-LINE PROCESSES –TREATMENT OF THE PLANT DATA TO IDENTIFY POTENTIAL ACCIDENTAL SEQUENCES (INITIAL EVENTS INTO THE DIAGNOSIS MODULE) AND CONTROL THEIR EVOLUTION: MODULES CONTROL ACCIDENT MANAGEMENT MODE OFF-LINE PROCESSES –USER-FRIENDLY CAPACITIES DEVELOPED AROUND THE MAAP CODE TO IMPROVE THE KNOWLEDGE ABOUT THE SEQUENCES EVOLUTION: ACCIDENT TRAINING MODE C - 1/11

WGRisk Workshop, Mar-2004 SISIFO-GAS 19 MAIN SCREEN C - 2/11

WGRisk Workshop, Mar-2004 SISIFO-GAS 20 MODULES CONTROL THE ON-LINE RECEPTION OF THE MOST SIGNIFICANT PLANT DATA IS DISPLAYED AS PUNCTUAL VALUES (9 SCREENS) AND/OR PLOTS THE DATA ARE PROCESSED THROUGH THE DIAGNOSIS MODULE TO IDENTIFY AN INITIATOR EVENT AND WHEN IT OCCURS THE DISPLAY PERMITS TO VISUALIZE ALL THE PROCESSES ACTIVATED DURING THE MANAGEMENT MODE:DISPLAY –DIAGNOSIS AND PROGNOSIS STATUS: INPUTS, OUTPUTS, FUZZY LOGIC PROCESS –DATA COMMUNICATIONS BETWEEN PLANT AND SISIFO-GAS –MAAP STATUS: FITTING MODULE, ERRORS –TIME INTERVALS: PLANT DATA REFRESH, HISTORICAL DATA STORE, FROM THE INITIAL EVENT. MODULES CONTROL THE ON-LINE RECEPTION OF THE MOST SIGNIFICANT PLANT DATA IS DISPLAYED AS PUNCTUAL VALUES (9 SCREENS) AND/OR PLOTS THE DATA ARE PROCESSED THROUGH THE DIAGNOSIS MODULE TO IDENTIFY AN INITIATOR EVENT AND WHEN IT OCCURS THE DISPLAY PERMITS TO VISUALIZE ALL THE PROCESSES ACTIVATED DURING THE MANAGEMENT MODE:DISPLAY –DIAGNOSIS AND PROGNOSIS STATUS: INPUTS, OUTPUTS, FUZZY LOGIC PROCESS –DATA COMMUNICATIONS BETWEEN PLANT AND SISIFO-GAS –MAAP STATUS: FITTING MODULE, ERRORS –TIME INTERVALS: PLANT DATA REFRESH, HISTORICAL DATA STORE, FROM THE INITIAL EVENT. C - 3/11 CHARACTERISTICS

WGRisk Workshop, Mar-2004 SISIFO-GAS 21 FITTING MODULE STATUS C - 4/11

WGRisk Workshop, Mar-2004 SISIFO-GAS 22 ACCIDENT MANAGEMENT MODE DIAGNOSIS –PERMITS TO SEE THE LOGIC RULES DEVELOPED FOR THE DIAGNOSIS MODULE USED FOR THE IDENTIFICATION OF THE ACCIDENTAL SEQUENCE AND ITS EVOLUTION. –PERMITS TO SEE THE LOGIC RULES TO ASSIGN AN ENVIRONMENTAL SOURCE TERM RELEASE (LEVEL2-PSA TREE: STC)SOURCE TERM RELEASE PROGNOSIS –PERMITS TO SEE THE BEHAVIOUR AND THE FINAL STATUS OF OTHER SEQUENCES WITH SIMILAR INITIAL CONDITIONS (DATAMAAP) –SEQUENCE EVOLUTION (PROGNOSIS) WITH MAAP4. ACCIDENT MANAGEMENT MODE DIAGNOSIS –PERMITS TO SEE THE LOGIC RULES DEVELOPED FOR THE DIAGNOSIS MODULE USED FOR THE IDENTIFICATION OF THE ACCIDENTAL SEQUENCE AND ITS EVOLUTION. –PERMITS TO SEE THE LOGIC RULES TO ASSIGN AN ENVIRONMENTAL SOURCE TERM RELEASE (LEVEL2-PSA TREE: STC)SOURCE TERM RELEASE PROGNOSIS –PERMITS TO SEE THE BEHAVIOUR AND THE FINAL STATUS OF OTHER SEQUENCES WITH SIMILAR INITIAL CONDITIONS (DATAMAAP) –SEQUENCE EVOLUTION (PROGNOSIS) WITH MAAP4. C - 5/11 CHARACTERISTICS

WGRisk Workshop, Mar-2004 SISIFO-GAS 23 SOURCE TERM CATEGORIES C - 6/11

WGRisk Workshop, Mar-2004 SISIFO-GAS 24 ACCIDENT TRAINING MODE TO REPRODUCE AN OLD SEQUENCE –PERMITS TO SAW AS A FILM, USING THE GRAPHICAL DISPLAYS, A SEQUENCE STORED INTO THE DATABASEGRAPHICAL DISPLAYS TO REPRODUCE A NEW SEQUENCE –PERMITS EASILY TO GENERATE A NEW INPUT OF MAAP AND TO RUN IT AUTOMATICALLY, WITH THE “GASE” SUBPROGRAM –THE SEQUENCES CAN BE VIEWED AND INTERACTIVELY MODIFIED ON DISPLAY AND FINALLY STOPPED AND STORED IN THE DATABASEINTERACTIVELY MODIFIED DATAMAAP –DATABASE ON ACCESS, STRUCTURED AND USER-FRIENDLY, WITH A DETAILED INFORMATION ON THE SEQUENCES STORED AND PLOTS DETAILED INFORMATIONPLOTS ACCIDENT TRAINING MODE TO REPRODUCE AN OLD SEQUENCE –PERMITS TO SAW AS A FILM, USING THE GRAPHICAL DISPLAYS, A SEQUENCE STORED INTO THE DATABASEGRAPHICAL DISPLAYS TO REPRODUCE A NEW SEQUENCE –PERMITS EASILY TO GENERATE A NEW INPUT OF MAAP AND TO RUN IT AUTOMATICALLY, WITH THE “GASE” SUBPROGRAM –THE SEQUENCES CAN BE VIEWED AND INTERACTIVELY MODIFIED ON DISPLAY AND FINALLY STOPPED AND STORED IN THE DATABASEINTERACTIVELY MODIFIED DATAMAAP –DATABASE ON ACCESS, STRUCTURED AND USER-FRIENDLY, WITH A DETAILED INFORMATION ON THE SEQUENCES STORED AND PLOTS DETAILED INFORMATIONPLOTS C - 7/11 CHARACTERISTICS

WGRisk Workshop, Mar-2004 SISIFO-GAS 25 CONTAINMENT DISPLAY C - 8/11

WGRisk Workshop, Mar-2004 SISIFO-GAS 26 SYSTEMS DISPLAY C - 9/11

WGRisk Workshop, Mar-2004 SISIFO-GAS 27 DATABASE - MAIN SCREEN C - 10/11

WGRisk Workshop, Mar-2004 SISIFO-GAS 28 DATABASE - PLOT C - 11/11

WGRisk Workshop, Mar-2004 SISIFO-GAS 29 CHARACTERISTICS OF SISIFO-GAS STAGES 1.TO SEE THE ON-LINE CONNECTION WITH PLANT DATA (SIEC) 2.THE MANAGEMENT MODE: INITIATOR EVENT AND DIAGNOSIS 3.THE TRAINING MODE: OLD SEQUENCE 4.THE TRAINING MODE: NEW SEQUENCE 5.DATABASE Time 5:59 CHARACTERISTICS OF SISIFO-GAS STAGES 1.TO SEE THE ON-LINE CONNECTION WITH PLANT DATA (SIEC) 2.THE MANAGEMENT MODE: INITIATOR EVENT AND DIAGNOSIS 3.THE TRAINING MODE: OLD SEQUENCE 4.THE TRAINING MODE: NEW SEQUENCE 5.DATABASE Time 5:59 DEMO D - 1/1

WGRisk Workshop, Mar-2004 SISIFO-GAS 30 THE END SISIFO-GAS