Cooling connections in the service gap Richard French The University of Sheffield.

Slides:



Advertisements
Similar presentations
Introduction to(GMAW) Gas Metal Arc Welding
Advertisements

Manufacturing. Frame I manufactured large portions of the frame at home as I felt this was easier done at home an I felt the lab times could be better.
Introduction It is expected your completed plan will require you to refer to applicable specifications, refer to reference documents and follow established.
April 05 Jason Tarrant CCLRC1 PRR of SCT off-detector cooling system l Cooling System »Design - Off-cylinder & On-cylinder »Installation – Off-cylinder.
1 HVACR316 – Piping Torches, Tanks, and Tips. 2 Soldering Basics Soldering is a process used to join piping and tubing to fittings. It is used primarily.
Spark Plugs Topics covered in this presentation: Spark Plug Construction Spark Plug Reach, Seating and Heat Range Spark Plug Servicing.
Plasfit - plastic push-in fittings For the drinks dispense and brewing industries.
Copyright 2008 Kenneth M. Chipps Ph.D. How to Terminate a Corning Unicam Connector Last Update
MICE Collaboration meeting at RAL 26 th Oct ~ 29 th Oct, 2004 Wrap up on Radiation Shielding Module Design Stephanie Yang 26 th October, 2004.
ASHOKA INSTITUTE OF TECHNOLOGY & MANAGEMENT AKTHA, SARNATH VARANASI
M. Gilchriese SQP Clearance June 8, M. Gilchriese 2 Overview A1-2 inners have been mounted on backbone An A1-2 outer has been mounted on the backbone.
Chapter 32 Oxyacetylene Welding.
Flexible Manufacturing Welding Safety Copyright © Texas Education Agency, All rights reserved. 1.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
CRYO PIPING & INTER-MODULE CONNECTIONS Yun He, Daniel Sabol, Joe Conway External Review of MLC Daniel Sabol, MLC External Review 10/3/2012.
Miller XMT400 CC/CV Welder
CONSTRUCTING A FIVE CABIN LATRINE
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
Bilan du contrat Renco Piping contract F467 TS workshop Archamps Mai 25 th 2005 R. Principe TSCV.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
Flexible Manufacturing
WELDING EQUIPMENT WELDING EQUIPMENT BRAZING GAS FUSION WELDING GAS FUSION WELDING ELECTRIC ARC WELDING ELECTRIC ARC WELDING INDUSTRIAL TECHNOLOGY- METAL.
Installation. Indoor Unit Installation Typical Installation.
Instructions for Printing Fluid Power Task Cards Print slides 2-5 and then take to a copy machine to make double sided copies Copy slide 2 to the front.
Welding Processes.  The process of joining two or more pieces of like metal  Parts are heated enough to cause it to melt where they meet  When the.
Some Recent BNL, LBNL and Yale Work 1.Honeycomb flatness from manufacturer 2.Commercially fabricated C-channel 3.VCR Fittings 4.BN powder thermal evaluations.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
1 ATLAS Upgrade WP4 Face to Face meeting Liverpool June 2012 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson, John Mattheson,
1 ATLAS Upgrade WP4 Face to Face meeting at Edinburgh - 11 th Jan 2011 WP4 task 2: Cooling activities Richard French – The University of Sheffield.
Alpha Magnetic Spectrometer - 02 Flight Safety Review Phase II May , 2007 Analysis - Welding and Brazing Dan Rybicki – Materials Analysis Jacobs.
Grade 11 Welding Simulation Lesson
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
Cooling loops for prototype staves Update on cooling pipes progress Confirmation of design of loop Discussion on design developments of loops for future.
1 HVACR316 - Piping Torches, Tips, Tanks Torches, Tips, Tanks.
1 QMUL Face to Face Meeting 2/2/2012 Richard French, Paul Kemp-Russell, Hector Marin-Reyes (Sheffield) John Matheson, Martin Gibson, Ian Wilmut (RAL) Ian.
1 Overview Stainless Steel to Titanium joining (temp connection) Copper to Titanium (pressure drop measurements) ATLAS Upgrade dissimilar metal joining.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Issues with variable thickness absorbers Iouri Ivaniouchenkov, RAL MICE Video Conference, 22 Jan
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
1 ATLAS Upgrade WP4 Face to Face meeting Liverpool 10 th November 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson,
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
Cooling Loop Update ATLAS W4 Sheffield Richard French The University of Sheffield + all UK contributors.
WP4 Face to Face #6, Oxford 14 th July 2011 Welding summary Richard French – The University of Sheffield.
AT-VAC SPC Nicolaas KOS Beam Screens for Inner Triplet Magnets LHC Upgrade Phase 1 Nicolaas KOS  LHC Upgrade phase 1  Inner triplet BS Requirements.
Beam Vacuum Interconnect Design Options Ray Veness.
©2007 John Wiley & Sons, Inc. M P Groover, Fundamentals of Modern Manufacturing 3/e BRAZING 1.Brazing.
RuggedPOD Proto 1 bugs SDS team Wolfe Engineering.
1 IST development status  Seattle  Composite Design.
B10 D19 Diode Repair March 29, 2016 Gary McIntyre.
Unit 215 – Welding by TIG Process
1 ATLAS Upgrade WP4 Face to Face meeting Sheffield 25 th August 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson,
Chapter 16 GMAW and FCAW: Equipment Assembly and Adjustment Miller Electric Mfg. Co.
HYBRID ARC LASER WELDING
Ti/SS transitions A.Basti INFN-PISA*
Service channels between Tracker and PP1
LARP Phase II Secondary Collimator RC1
Future tube procurement Richard French
Cooling loops for prototype Staves
Presentation by: Paul Kemp-Russell.
AQA GCSE 2 Working with timber based materials and fixings
Service Tips April 2005.
ATLAS UK-Upgrade WP7 LMT Automated Manipulation Testing
ISO view of pipe w/ individual EC detector installed
Presentation transcript:

Cooling connections in the service gap Richard French The University of Sheffield

Overview Main topics covered today Services Gap Dimensions Access requirements for Welding Re-work Tangential thoughts……….. – Does the TDR lock us into a specific service gap size – Access will dictate tube wall size eg poor access = thicker wall tube – Purge gas – how to get it to the joint that we are welding with overpressure – All applies to rework except Tube end preparation for welding Cutting out old BACK TO ACCESS REQUIREMENTS

Joining and weldability 316 CP2 Its pretty easy once you know how We have made thousands of tube welded joints in a range of materials both commercially, commercial research and have pushed R&D for TIG beyond commercial requirements to date. We evaluate welding machinery for companies using our techniques and equipment designed in-house. TIG orbital welding limit is 200μm Have not tried to reduce further Butt welding successful on both 2mm and 1/8” tube Diameters are 2.0mm and 1/8” so standard fittings work without modification Brazing is ok but untested as not needed to make this joint as never dissimilar material Can join this material without much effort or thinking. TIG orbital welding limit is 125μm Have not tried to reduce further Butt welding successful on both 2.275mm and 1/8” tube Diameters are 2.275mm and 1/8” so standard fittings work on the 1/8” tube but are hopeless for the smaller OD. 125μm wall in small OD is not for in-situ joining or ……….. We need to make the tube preparation very good but I don’t see this happening yet.

Christophe Bault – CERN 6/2/14

Service Gap Dimension (z=91mm) Robert Gabrielczyk - RAL

Detail We should not get hung up on the gap dimensions in Z (photo) We should worry about the position of the tube in relation to the end of stave eg – push the tube further out to the EC’s to increase clearance NOT WORRIED YET for installation WORRIED IF WE NEED TO REWORK in the sense of a service intervention post installation

Access requirements for welding 5.5m cable length from power supply to weld head WPS qualified for this length Not worried about RF from machine – maybe add a shielded cable – weld head ok. G – Add another 80mm as we need to move the cassette in and out the head C – Add another 10m as we need to add support collets for in-situ work to suit tube type better (tube joint alignment and heat sinking) Need to be realistic and work out what tubes can go where when held by hand. Can we use jigs – doubt it. IM tasked with a measuring system = simple point to point feeler – check if ok for 3D. If in doubt we use filler rings to support the tubes. Not tested at all yet as will be very bespoke

Re-work of connections Things to consider I am not considering re-work of 125um CP2 Ti in-situ Here I consider 200um CP2 Ti rework in either 2.5mm OD or 1/8” OD We can not weld on a weld – we can but it is very bad practice (annealing) Cut sections out and replace Electrical break – capacitance induction or transient voltage Gas purge must be present during re-work. Can we add valves to the system to prevent filling the entire volume? Tube ends must be flat and parrallel with excellent surface finish and all oxide removed, no burrs, no swarf or dust in the bore – Debris filtering can be used