Dru Dennison, Urban Forestry Manager December 8, 2014.

Slides:



Advertisements
Similar presentations
Tennessee Practice Test #4: Signs This sign means: a. no left turn can be made here b. a left turn can be made only after stopping c. all traffic.
Advertisements

Energy Management Trees Work for. 1. Why do we plant trees? Add Beauty – Spring flowers, fall foliage color, interesting bark, fragrance – Screen unwanted.
American River Basin Council of Watersheds Low Impact Development Seminar October 6, 2010 Sacramento County DOT Freedom Park Drive (FPD) Green Street Project.
Houston Parks and Recreation Department FY2012 Proposed Budget Mayor Annise D. Parker.
Department of Public Works Public Hearing – FY 2015 – 2019 Recommended Capital Improvement Program Budget April 28, 2014.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Module #4 Canopy Management and Thinning Pine Silvopasture in the Southeast.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
STREETS FOR LIVING Quality Criteria for Street Open Spaces Author: Maria Baumgartner.
Florida Department of Transportation, November 2009
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
St. Albans Guide to the Rewrite Process ZONING & SUBDIVISION REGULATIONS.
2 Approved by the Board of Regents in 2006 to support rising energy prices due to double digit increases in utility rates and in lieu of an increase in.
Module #2 Tree Spacing and Row Arrangement Pine Silvopasture in the Southeast.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Landscaping and Irrigation Standards. Purpose The landscaping of all areas of the community is intended to: provide visual relief and delight complement.
Sidewalks February 13,  A large number of sidewalks in need of repair ◦ Damage from right-of-way trees = City responsibility ◦ Damage from property.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
State of the Urban Forest 2005 City of Missoula Parks and Recreation Department Urban Forestry Division.
Urban, Suburban & Rural. Urban People often define urban areas, or cities, as land occupied by buildings and other structures used for residences and.
COMMUNITY IMPROVEMENT DISTRICT Downtown Dutchtown Business Association 1.
PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17.
 Electric service = 600 kilowatts  Facility demand = 560 kilowatts  Generator capacity = 180 kilowatts  Emergency generator is only capable of powering.
Town of Broadway Fiscal Year 2016 Budget May 19, 2015.
Building Project Milestone December 16, Lantana Road, Lake Worth, FL
Key Findings and Recommendations from an i-Tree Eco inventory in the City of Winooski: Phase 2 Prepared for the Winooski Natural Resources Conservation.
Outline  Board Direction  Tasks Completed  Recommendation.
Safety Concerns on Low Volume Roads Towns & Township Meeting December 2015 By Cliff Reuer Technical Assistance Provider SDLTAP.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Budget Presentation February 2015 (Appendix 11). Total Budget Gap Amount Delivered so far Annual Budget Gaps: 2011/12£91.4m 2012/13£50.0m 2013/14£32.0m.
The simple act of planting a tree Arbor Day – First Friday in May Right tree for the right place –Distance to buildings –Height to overhead lines or street.
Department of Public Works Proposed Underground Utility District 10-1 Mountain Street Lake Avenue to Hill Avenue.
Proposed Budget Amendments Disposition of $410,745? 9/8/2010Strohmaier Budget Proposal.
Hummock Pond Road Bike Path Implementation Update January 25, 2012.
Services Currently Provided  FHA/ADA Inspections  Bank Draw Requests  Existing Condition Documentation Services.
CITY OF DEKALB CITY OF DEKALB 2015 Property Tax Levy Presented to Finance Advisory Committee October 27, 2015.
Update on Right-of-Way Mowing and Mowing of Parks and Street Medians Pre-Council Meeting November 10, 2009.
Resolution 2014R-099 December 18,  Board Direction ◦ Establish a monthly cost-of-service rate of $ for FY 2015 and utilize a General Fund.
Sustainable Aviation Biofuels Workshop Georgia Tech: H. Milton Stewart School of Industrial Systems & Engineering, December 3, 2015.
HRM STREETLIGHTING OPTIONS UNSM LED Streetlight Workshop June 20, 2012.
Urban Forest Strike Team Team Leader Response Protocols Review Eric Kuehler, USDA Forest Service Brooksville, FL July 20-21, 2009.
1 Budget Presentation Fiscal Year 2011 May 10, 2010.
Horticulture Revision Team May The majestic giants of the plant world.
Reject all bids for Citywide Tree Trimming Services and authorize increases to Contracts No. 21,628 and No. 21,629 with George Salinas Tree Preservation,
DEVELOPER WORKSHOP October 17, :00 p.m.
Overview of TP312 5th (draft)
“Palm Coast 145, LLC” Comprehensive Plan Amendment & Rezoning Planning and Land Development Regulation Board December 21, 2016.
OMI - THAMES WATER, INC ANNUAL SETTLEMENT STATEMENT CONTRACT YEAR 3
Town of Broadway Fiscal Year 2018 Budget May 2, 2017.
Street Improvement Plan
MUNICIPAL BUDGETED PROPERTY TAX COMPARISON The following is a yearly property tax comparison from FY to FY :
Preparing for the Emerald Ash Borer
Participatory Road Program neighborhood meeting Donahoo 174th Street
Department of Correctional Services
Accessible Trails The Basics.
Town of Broadway Fiscal Year 2019 Budget May 1, 2018.
Academy High School Update
PUBLIC WORKS EXPENDITURES BY DIVISION
Monthly Financial Reports
Pierre Regional Airport Master Plan Update
Town of Broadway Fiscal Year 2020 Budget May 7, 2019.
FY BUDGET HIGHLIGHTS. VILLAGE OF ROMEOVILLE FY BUDGET PRESENTATION APRIL 17, 2019 Village Board Room 6:00 PM.
Presentation transcript:

Dru Dennison, Urban Forestry Manager December 8, 2014

Estimated # of Trees in ROW – 25,500 Estimated # of vacant planting spaces – 1,785 Percentage of ROW currently planted – 93% Trees Planted in FY Trees Planted so far this year – 45 November; 30 December

Replant Trees removed within one month Make progress on tree vacancy list – time and budget permitting Continue to encourage planting on private property Shift larger portion of maintenance budget to planting budget within 3 years

Current Contract (6months) – FL #1 - 3” caliper shade tree - $360 Prices and demand are increasing; unable to secure 1 year contract with low bidder Current Budget - $150K Tree Fund - $90K

POTENTIAL TREE PLANTING LOCATIONS DECEMBER 2, 2014 POTENTIAL TREE PLANTING LOCATIONS DECEMBER 2, 2014

CANOPY COVERAGE BY STREET SEGMENT DECEMBER 2, 2014 CANOPY COVERAGE BY STREET SEGMENT DECEMBER 2, 2014

Planting Criteria Shade Medium Understory Height 50’-70’ 30’-45’ 15’-25’ Planting Strip Width 6’ 4’ 3’ Spacing distance 50’-60’ 40’-50’ 35’ UG Utility Distance (H2O, Sewer, drives) 6’ Intersections 15’ 15’ 15’ Decorative Street Lights8-10’

15’ minimum distance from road intersection 6’ minimum distance from edge of drive 6’ underground facilities existing overhead facilities

planting strip width multiple drive aprons underground utility facilities

wide enough for 2 shade trees as indicated by stakes note underground facilities in the background