Farnborough Airspace Change Proposal Briefing to FACC 7 th March 2013.

Slides:



Advertisements
Similar presentations
Farnborough Airspace Change Proposal FACC Briefing 4 October 2012.
Advertisements

A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Presented by United Arab Emirates MID ATM ENHANCEMENT PROGRAM (MAEP) TECHNICAL PROPOSAL.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
TAG Farnborough Airport. TAG Farnborough Airport Today.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
Future Airspace Strategy (FAS) Heathrow Airport Consultative Committee 31 st March 2010 Phil Roberts Assistant Director of Airspace Policy 1 1.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
1 Alberta Airspace & Services Project (AASP) AOCM Presentation Nov 30, 2011 Jim Strukalo – NAV CANADA Project Manager
Continuous Climb Operations (CCO) Saulo Da Silva
Washington DC Metroplex March 5, 2015 Implementation.
International Civil Aviation Organization Continuous Descent Operations (CDO) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
Users’ Perspective of PBN Achieving Improvements Joël Morin Head, ATM Harmonization.
1 Airspace Change Process & Airspace Trials in the context of Modernising UK Airspace Darren Rhodes Civil Aviation Authority.
17 January 2014 United Kingdom Future Airspace Strategy FAS VFR Implementation Group Launch Meeting Phil Roberts – SARG Hd AAA.
Airspace Infringements Iain McDermott-Paine, Southampton Airport AOA Representative – Airspace Infringement Working Group.
Rob Eagles Director ASIA PACIFIC Safety, Operations & Infrastructure.
Study Continuous Climb Operations
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
FASVIG Introductory Meeting
ATM Conference, Oslo May 19 th, 2015 ATM Master Plan 2015 Consequences for cost, safety, performance and environment.
Federal Aviation Administration ASPIRE Update APEC TPT-WG Aviation Emissions Taskforce Singapore 15/16 Sept 09.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Green actions in the Air Traffic Management perspective Flygteknik 2010, October Tomas Mårtensson, Martin Hagström; FOI.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
EUROCONTROL European Organisation for the Safety of Air Navigation.
Dublin Airport Stakeholders Forum 26 th November 2008 Irish Aviation Authority Dermot Mc Mahon.
Farnborough Airspace Change Proposal Briefing to FACC 26 th November 2014 TAG Farnborough Airport.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
1 EUROCONTROL EUROPE AIR SPORTS Sporting & Recreational Aviation Conference GLIDING Günter Bertram.
NY/NJ/PHL Metropolitan Area Airspace Redesign Record of Decision (ROD) Announcement Congressional Briefing Name: Steve Kelley Date: September 5, 2007 Federal.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
Gary Stowell Noise Abatement Manager San Jose International Airport The Next Step - An Airport Perspective.
Farnborough Airspace Change Proposal Briefing to FACC 6 th March 2014 TAG Farnborough Airport.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
1 Future Airspace Strategy: Briefing to the DfT European ATM Stakeholder Forum 19 October 2010.
Basics of RNP. Outline  What is RNP?  Why implement RNP?  What does it mean for communities?
Gatwick Airspace Seminar Emma Simpson Principal Airspace Regulator Civil Aviation Authority 10 May 2016.
Strategic Environmental Assessment (SEA) A Scottish replacement to Air Passenger Duty (APD) Elaine McCall Environmental Assessment Team The Scottish Government.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
Workshop on preparations for ANConf/12 − ASBU methodology
PlaneWrong AGM Thursday 13th October
Performance Based Transition
Workshop on preparations for ANConf/12 − ASBU methodology
Presented by United Arab Emirates
Introduction of TBO within OptiFrame
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Airspace Change Summary
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Descent Operations (CDO) Saulo Da Silva
Delivering NATS ATM CO2 Targets
Continuous Climb Operations (CCO) Saulo Da Silva
Brandon O’Reilly (CEO TAG) to Eagle Radio on 27th March 14:
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session
Performance Based Navigation –Civil Aviation Authority Actions
Balanced Approach to Noise Mitigation
Balanced Approach to Noise Mitigation
Airspace Change Proposal
Presentation transcript:

Farnborough Airspace Change Proposal Briefing to FACC 7 th March 2013

Slide 2 6 Reminder of the aims of the project Outline of the process being followed Outline of activities and dates Summary of activities since last FACC update Summary of engagement meetings held to date Key issues and points of note Next steps Today’s update will include -

Slide 3 Aims of the project In line with the TAG Farnborough Airport’s 2009 Master Plan, it is undertaking an airspace change to provide the airport with a more predictable and efficient airspace environment Improved airspace efficiency Advanced navigation systems will enable high-precision, optimal approach and departure procedures. Aircraft will remain at higher altitudes for longer and spend less time in the air Environmental benefits Reduced track miles will be flown with more predictable and efficient flight paths Improvements in efficiency would result in: reductions in fuel usage, emissions (including CO 2 ) and noise around the airport. For example, planned early left turn off runway 24 to fly over military area. Safety benefits By changing to a new airspace environment, which includes elements of controlled airspace, the airport will be able to create a known and more predictable environment

Slide 4 What is the process? The process to be followed is outlined in CAA publication CAP725 and contains a number of phases: Phase 1Framework briefing Phase 2Proposal development Phase 3Preparing for consultation Phase 4Consultation and formal proposal submission Phase 5Regulatory decision (Feb 2014) Phase 6Implementation Phase 7Operational review 5

Slide 5 Activities Project start June 2012 Initial design options and parametersAug 2012 Pre-consultation with key aviation stakeholdersOct 2012 Detailed design options and concept of operationsAug 2013 Formal consultation processAug 2013 Final submission to DAPOct 2013 DAP decisionFeb

Slide 6 Summary of activities since last FACC update Project planning and setting up of stakeholder requirements system Pre-consultation engagement with key aviation stakeholders Determining stakeholder requirements and options Design development – at least 18 versions worked on Pilot workshop for TAG Farnborough operators Internal NATS workshops with multiple stakeholders Concept of operations work Framework briefing with DAP Co-ordination with LAMP, Heathrow, Gatwick and Southampton 2

Slide 7 Engagement meetings since last update to FACC 1 TC Ops Odiham Heathrow SVFR Blackbushe Fairoaks Lasham Lasham LAA Lasham ATC Lasham ATC (ATCOs) Pilot forum Netjets DAP Framework Brief DAP PBN procedures British Microlight Aircraft Association Gatwick Heathrow Southampton

Slide 8 Key issues and points of note Airspace is very restricted both vertically and horizontally The current environment is less able to efficiently support a predictable and structured arrival and departure environment required to maintain an efficient operation as the number of ATMs increase Lack of predictability is a concern for local operators Farnborough ATC currently make significant concessions with TAG Farnborough traffic in order to facilitate GA and other operators There are huge complexities in how any airspace and procedure changes will integrate into the future London airspace strategy But also huge benefits in moving towards a more predictable and sustainable use of the available airspace 2

Slide 9 Key issues and points of note Stakeholder engagement is proving vital in helping us develop airspace and procedure options Capturing requirements from other airspace users has helped us to consider many options Each option or change impacts upon aviation stakeholders including Heathrow, Gatwick, TC ops, Swanwick, LAMP and many others There are understandable concerns amongst some aviation stakeholders who currently enjoy considerable operational freedoms 2

Slide 10 Next steps March pre-consultation engagement meetings continue and expand NATS Defence NATS Safety BGA British Balloon and Airship Club British Hang Gliding and Paragliding Association British Parachute Association Helicopter Club of Great Britain PPL/IR Europe Royal Aero Club Popham Blink

Slide 11 Next steps March pre-consultation engagement meetings continue and expand design options are narrowed down concept of operations and safety-related work continues discussions with DAP on technical issues relating to PBN procedures continue

Next steps April Preliminary simulation of high level design options and concepts such as PBN procedures Workshop/meeting with FACC to examine arrival and departure routes close to the airport

Farnborough Airspace Change Proposal Briefing to FACC 7 th March 2013