Measurement report of Boostec girders Control after receipt Sylvain GRIFFET, 13/12/2010 Measurements performed on the 1 st and 2 nd of December 2010 with.

Slides:



Advertisements
Similar presentations
RFQ Matcher. What am I doing this time?! Concerned that modulations and matcher affect field flatness and frequency These are very small features How.
Advertisements

The Three-Dimensional Coordinate System 11.1
Cylinders in Vs An optomechanical methodology Opti 521 Tutorial Yuming Shen December 2006.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
Introduction to Robotics Kinematics. Link Description.
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Use of a commercial laser tracker for optical alignment James H. Burge, Peng Su, Chunyu Zhao, Tom Zobrist College of Optical Sciences Steward Observatory.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
1 Institute of High Energy Physics 13/09/2010 Comparison and Study in Measurement Accuracy of Height Difference between Laser Tracker and Level Men LingLing.
JINR: J. Budagov, V. Glagolev, M. Lyablin, G. Shirkov CERN: H. Mainaud Durand, G. Stern A laser based fiducial line for high precision multipoint alignment.
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
Production of precise large PCB’s Introduction to the problem Achievement in collaborating with industry (Print Electronics in IL and MDT in Italy). Conclusions.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnetic Specifications and Tolerances Weiming Guo, NSLS-II Project In this presentation I briefly introduced the.
Structure stacking alignment tolerances CLIC Workshop January 2015 CERN Anastasiya Solodko, on behalf of the CLIC study team.
1/9 Hélène Mainaud Durand Sylvain GRIFFET, 28/11/2011 BE/ABP-SU/ Adjustment of 4 Drive Beam Quads positions on TM0 CLIC girders EDMS Document No
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
Circles Notes. 1 st Day A circle is the set of all points P in a plane that are the same distance from a given point. The given distance is the radius.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Geometric Dimensions and Tolerances
3.1b: Area and Perimeter - Quadrilaterals and composite shapes
ALIGNMENT DESIGN AND STATUS OF TAIWAN PHOTON SOURCE WEI-YANG LAI October,
Measurement report of Boostec girders 1/13 Sylvain GRIFFET, 15/11/2010 Measurements performed on the 28th of October 2010 with the Laser Tracker LTD500.
Basic Principles of Coordinate Measuring machines
INTERPENETRATION OF SOLIDS WHEN ONE SOLID PENETRATES ANOTHER SOLID THEN THEIR SURFACES INTERSECT AND AT THE JUNCTION OF INTERSECTION A TYPICAL CURVE IS.
Dmitry Gudkov BE/RF/PM CLIC Module Working Group PROTOTYPE TWO-BEAM MODULES (CLEX) Supporting and positioning system for CLEX modules main conclusions.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
f30 G1 G A a F B E C D T F A1 A G G1 B C G A 50 G1 A1
Symmetry Two points, P and P ₁, are symmetric with respect to line l when they are the same distance from l, measured along a perpendicular line to l.
A.Ostaptchouk AMS Meeting at CERN, 16 July Measurements of Octagon Walls with 3D CMM Characteristics of 3D CMM Measurement program Results of insert.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
  Volume is defined as the amount of space taken up by a three-dimensional object. What is Volume.
CLIC Module meeting, 22/08/2011 N. Chritin (EN/MME) Cradles design for CLIC module supporting system (EDMS )  General principle  Main inputs an.
Splash Screen. Concept Label your diagram with the following new points: D E F G.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
Engineering design of the V-supports J.Huopana Input from: G.Riddone, A.Samoshkin, R.Nousiainen, D.Gudkov, N.Gazis.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
1 Tracking tests – Analysis results October 2007 Campaign Panagiota Xydi Acknowledgements: to all FIDEL team Cern, December 09, 2007 AT-MTM.
MQXFB Plan for mechanical alignment measurements J.C Perez On behalf of MQXF collaboration team Special thanks to Jose Ferradas for his contribution MQXF.
VELO Integr - Jan06Jean-Christophe GAYDE TS/SU EDMS n° SURVEY FOR VELO INSTALLATION 1.SURVEY AT GROUND FLOOR - FIDUCIALISATION 2.SURVEY FOR INSTALLATION.
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
Measurements of DB supporting systems Fiducialisation Sylvain GRIFFET, 21/03/2011 Measurements performed in February and early March /13 EDMS n°
Median, Angle bisector, Perpendicular bisector or Altitude Answer the following questions about the 4 parts of a triangle. The possible answers are listed.
Company LOGO Technology and Application of Laser Tracker in Large Space Measurement Yang Fan, Li Guangyun, Fan Baixing IWAA2014 in Beijing, China Zhengzhou.
X axis y axis Points on a coordinate plane are written like this: (-8, 9) Move the dot.
19-Sept-2012] «BE-RF-PM» TEST MODULES in the LAB DB girders (epucret) for T1 & T4: Optimization of the V-shaped supports Nick Gazis, Dmitry Gudkov, Vadim.
NCSLI 2007 In House Capability of an Optical CMM Calibration for any Company Shawn Mason Boston Scientific.
TE-MSC. 07/04/2016 Jose Ferradas TE-MSC-MDT Alejandro Carlon TE-MSC-MDT Juan Carlos Perez TE-MSC-MDT On behalf to MSC-MDT section and Coil working group.
The Alignment of DTL in CSNS Institute of High Energy Physics, CAS KE Zhiyong
The coordinate plane is formed by the intersection of two perpendicular number lines called axes. The point of intersection, called the origin, is at 0.
Update on the DB Girders FE Analyses
on behalf of the CLIC active pre-alignment team
TEST MODULE WG Cradles for CLIC module supporting system
Stages for the SSW translation system for PACMAN
Lesson 3-6: Perpendicular & Distance
TBL quadrupole mover prototype development
Graphing Ordered Pairs
How to Identify a Bolt.
Three Dimensional Geometry
Rectangular Coordinates Level control in trenches
Introduction to Rectilinear Motion
Graphing on the Coordinate Plane
Introduction Graphing in all four quadrants of a coordinate plane
Work Features Work features are tools that help create and position features by providing points, lines, and planes when current geometry is not sufficient.
Plotting Points Guided Notes
Graphing on the Coordinate Plane
Work Features Work features are tools that help create and position features by providing points, lines, and planes when current geometry is not sufficient.
Graphing on a Coordinate plane
Adjustment of the 3 reference tables at building 180 AT960 measurement
Presentation transcript:

Measurement report of Boostec girders Control after receipt Sylvain GRIFFET, 13/12/2010 Measurements performed on the 1 st and 2 nd of December 2010 with the Laser Tracker LTD500 EDMS n° /12

Plan INTRODUCTION Tolerances to be checked Coordinates system Flatness and coaxiality 3079 girder 3069 girder Positioning 3079 girder 3069 girder Perpendicularity CONCLUSION Measurement report of Boostec girders Sylvain GRIFFET, 13/12/2010 2/12

INTRODUCTION The objective of the measurements is to perform the dimensional control of the 2 Boostec girders after receipt at CERN (building 162). We measured these girders according to Nicolas Chritin plans and tolerances (EDMS n° ) using the Laser Tracker Leica LTD500. Measurement conditions were correct: temperature stability of 17.3°C to 17.8°C the 1 st of December and of 17.1°C to 17.5°C the 2 nd of December but lack of space. We will present measurement results with an accuracy of about 10 µm rms for the flatness and coaxiality and of about 20 µm rms for the positioning. We have not fully measured again Boostec girders but only checked the important points. The objectives were to check that girders were not damaged during transport and the machining of the side plans was consistent with the measurement report provided by Boostec (EDMS No ). Measurement report of Boostec girders Sylvain GRIFFET, 13/12/2010 3/12

Tolerances to be checked Measurement report of Boostec girders Sylvain GRIFFET, 13/12/2010 Reference A Reference D Reference E Reference C Reference B Reference F (Idem B) Reference G Reference H Reference I Reference A REFERENCE A POSITIONING 319 mm PERPENDICU LARITY POSITIONING 529 mm Reference D POSITIONING 210 mm PERPENDICU LARITY Reference E REFERENCE E POSITIONING 1946 mm* PARALLELIS M PERPENDICU LARITY Reference C REFERENCE C PERPENDICU LARITY Reference B MEDIAN PLAN mm POSITIONING 65 mm Reference F (idem B) MEDIAN PLAN mm POSITIONING 65 mm Reference G AXIS POSITIONING 65 mm POSITIONING 65 mm PLANEITY OR COAXIALITY YES General tolerances of ± 0.01 mm, *Tolerances of ± 0.1 mm 4/12

Tolerances to be checked Measurement report of Boostec girders Sylvain GRIFFET, 13/12/2010 5/12

Tolerances to be checked Measurement report of Boostec girders Sylvain GRIFFET, 13/12/2010 6/12

Coordinates system The coordinates system is the same that the one defined on site (EDMS n° ): _ Y axis = mean cylinders axis corrected by the offset generate by the cylinder diameter _ Z axis = perpendicular to the mean plane A _ System origin O = intersection of Y with the mean plane C Measurement report of Boostec girders Sylvain GRIFFET, 13/12/2010 7/12

Flatness and coaxiality 3079 girder _ Planes flatness : A : 18 µm rms E : 9 µm rms C : 4 µm rms Bg : 2 µm rms Bd : 6 µm rms Fg : 6 µm rms Fd : 4 µm rms _ Axis coaxiality for the cylinder locations : 15 µm rms. Measurement report of Boostec girders Sylvain GRIFFET, 13/12/2010 8/ girder _ Planes flatness : A : 9 µm rms E : 7 µm rms C : 5 µm rms Bg : 3 µm rms Bd : 7 µm rms Fg : 8 µm rms Fd : 3 µm rms _ Axis coaxiality for the cylinder locations : 8 µm rms. For the two Boostec girders, and with the consent of Nick Gazis, the planes D, H and I were not measured again.

Positioning 3079 girder _ Positioning of C with respect to E (along Y), distance between mean planes : mm or 73 µm of offset with respect to the nominal length. _ Positioning of A with respect to Y axis (along Z): distance from the mean plane A to the Y axis of mm or an offset of 65 µm (instead of 28µm on site). It will be necessary to measure this offset by CMM, the use of shims is possible. Measurement report of Boostec girders Sylvain GRIFFET, 13/12/2010 9/12 _ Positioning of Bg with respect to the median plane: mm instead of -65 mm Positioning of Bd with respect to the median plane: mm pour 65 mm Positioning of Fg with respect to the median plane: instead of -65 mm Positioning of Fd with respect to the median plane: mm instead of 65 mm The Bd and Fd planes have been enough machined to allow the use of shims.

Positioning 3069 girder _ Positioning of C with respect to E (along Y), distance between mean planes : mm or 63 µm of offset with respect to the nominal length. _ Positioning of A with respect to Y axis (along Z): distance from the mean plane A to the Y axis of mm, or an offset of 49 µm (instead of 8µm on site). It will be necessary to measure this offset, if any, by CMM, the use of shims is possible. Measurement report of Boostec girders Sylvain GRIFFET, 13/12/ /12 _ Positioning of Bg with respect to the median plane: mm instead of -65 mm Positioning of Bd with respect to the median plane: mm instead of 65 mm Positioning of Fg with respect to the median plane: mm instead of -65 mm Positioning of Fd with respect to the median plane: mm instead of 65 mm The Bg plane seems not to have been machined enough of the order of 60µm, the CMM measurements by Boostec confirm that (EDMSn° ).

Perpendicularity Measurement report of Boostec girders Sylvain GRIFFET, 13/12/ and 3069 girders For the two girders, and like on site, we have not detected any problem about perpendicularity between planes. 11/12

CONCLUSION According to the results presented here and the accuracy of LTD500, we can confirm the measurements taken on site the 28th of October 2010 (EDMS No ) for the tolerances concerning : Perpendicularities between planes, Flatness of measured planes, And the coaxiality of cylinders put on the V-supports. For the positioning, we find offsets, for the two girders, of the order of 50µm between the bottom plane A and the beam axis. It will be necessary to check that with CMM measurements because these faults are above values detected on site, however it is possible to use shims. The machining of the side planes seems to be enough to allow the use of shims, except for the Bg plan of the 3069 girder which is above about 50 µm (that is confirmed by CMM measurements of Boostec). More accurate measurements with CERN CMM will be necessary to define shims for the side planes. The Boostec girders have apparently not been damaged during transport. Measurement report of Boostec girders 12/12 Sylvain GRIFFET, 13/12/2010