Qualification Based Selection. Qualifications Based Selection – Basing selection of design professionals on their qualifications first and foremost through.

Slides:



Advertisements
Similar presentations
Section 5 Hiring an Engineer. Why hire an engineer? –For their expertise –Because you dont have the time –Because you just cant do everything that needs.
Advertisements

The Bargain Heart Surgeon: Are You Getting the Best Value From Your Professional Service Providers.
1 Solicitations/Advertisements Solicitations/Advertisements
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
Selecting Contractors and Architects Hiring Architects and Engineers in Missouri Dwight Dickinson, AIA Missouri Association of Rural Education PART 1.
Footer Text PROFESSIONAL SERVICES CONTRACTING. Footer Text PROFESSIONAL SERVICES CONTRACTING.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
1 Last update: February 12, 2009 Is Your Selection Process Attracting the Right Consultants? Best Practices, Benefits and Insights to Using a Qualifications.
RFP PROCESSES Contracts for Professional Services.
Getting Certified In Consultant Selection Steps and Processes Diana Foster.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
 Architect/Engineer Selection Process  Contractor Selection Process  Project Management 2008 Legislative Audit Report Procurement Best Practices Text:
CSN Project # RFQ 180 and RFQ 181 Fire Station/College Instructional Center Scope of Work 14,000 SF structure on West Charleston Campus to house.
Marcy Mealy Procurement Specialist CDBG Program
QBS Colorado QBS Colorado QBS Colorado is an organization comprised of the Colorado chapters of AIA, ACEC, NSPE, and others; to be.
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
DESIGN PART 1 SELECTING THE DESIGNER AGREEMENT FOR PROFESSIONAL SERVICES.
PROCEDURES FOR SELECTING THE CONTRACTOR
I ntroduction Finally… A Best Practice for Selecting Engineers From Vision to Reality Engineering Canada’s Future.
Agenda Overview Why Qualifications Based Selection? Elements of the Request for Qualifications Initial Questions Example 1 - General Stretch Break!!!
Model Procurement Documents for Architectural Services [NAME] [PLACE] [DATE]
Large Public Works Projects and the General Contractor/ Construction Manager (GC/CM) Procedure: A New Way to Save Money, Time and Aggravation.
Using QBS A Qualifications-Based Selection Process Presenters: Ron Brenke, PE - QBS Manager.
The Art of QBS Qualifications-Based Selection (QBS): Procuring Intellectual Services the Smart Way Claude Paul Boivin, ACEC Canada Title #1.
The Importance of the Qualifications Based Selection (QBS) Process
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
VIRGINIA PUBLIC-PRIVATE EDUCATION FACILITIES AND INFRASTRUCURE ACT OF 2002 (PPEA) Augusta County Board of Supervisors Wednesday, January 6, 2009.
The Best Practice: Selecting a Professional Consultant Canadian Public Procurement Forum October 6, 2010 FIDIC Resources.
Purchasing Overview. Fundamentals of Purchasing Procedures.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Best Value for Clients Presented to the Canadian Public Procurement Forum by Glenn Martin, Executive Director Consulting Engineers of BC November 4, 2009.
OPA Office Professionals Assist, LLP Contracts, Proposals and Estimating.
COFPAES Presentation on GSA Federal Supply Schedule/ Multiple Award Schedule Re: Architect-Engineer Services Brian Pallasch, CAE American Society of Civil.
1 Technical Assistance - PTAB Selecting and Hiring the Design Professional Dave Maxwell, P.E. Chairman, New Mexico Professional Technical Advisory Board.
Consultants' Competitive Negotiation Act Acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping.
Quality Based Selection The Best Practice for Selecting Professional Consultants [DATE]
JENNIFER DRILLING The Pennsylvania State University School of Architectural Engineering KIM PEXTON, ASSOC. AIA, LEED James G. Davis Construction Corporation.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Selecting Contractors and Architects Hiring Architects and Engineers in Missouri Dwight Dickinson, AIA Missouri Association of Rural Educators PART 1.
Purchasing Overview Related to Request for Proposals (RFP’s) and Request for Qualification (RFQ’s)
CONSULTANT SELECTION ACEC-Illinois/ IDOT-Region 1 Local Roads Seminar March 7, 2013.
The Best Practice: Selecting a Professional Consultant Presented by John Gamble, P.Eng. President & CEO, ACEC-Canada.
QBS Colorado FALL FORUM 2011 Daniel W. Akin, P.E. – P.L.S. Chairman QBS Colorado October 4, 2011.
College of Engineering CIVE 4750 Using QBS A Qualifications-Based Selection Process Adapted from a presentation by QBS, Inc. 215 N. Walnut St. Lansing,
Professional Practice 2 M.S. Chua. Introduction In formulating this document several references were used such as the AIA - Architect’s Handbook of Professional.
For a better built environment 1 By Mr Mfezeko Gwazube Built Environment Professions in South Africa 24 FEBRUARY 2011.
Public Works Department Presentation to: Consolidation of Services Study Commission, Purchasing Subcommittee September 19, 2005.
Construction Management At Risk Process
Small Purchase of Professional Service Providers Administrative Rule R
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
1 Hiring a Program Manager Construction Management Task Force January 2008.
Designer selection procedures. Legal framework Article 3D. Procurement of Architectural, Engineering, Surveying Services, and Construction Manager at.
Construction & Properties Department (CAPD)Segment for September 5, 2013 DCAM/Construction and Properties Department www://ok.gov/DCS/Construction_&_Properties/index.html.
“ THANK YOU! ” 5/1/  Created in 1972  Illinois General Assembly  Construction management agency  Oversees the vertical construction of  State.
New Hampshire Public Works Association and the NH Qualifications - Based Selection (QBS) Coalition NH Municipal Association Conference November 13, 2014.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
QUALIFICATIONS-BASED SELECTION
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
ACEC INDIANA Environmental Business & Funding Source Conference
Architect/Engineer Selection Process Contractor Selection Process
CM at Risk v. Design-Bid-Build
QBS: The Process Selecting a Design Firm
How to Build a Great Team
The Best Decision by Design: Professional Services Selection
Design-Build Process Utilizing Negotiated Selection
Architectural Services RFQ
PROJECT DELIVERY METHODS
Back Ground Information
OCPS CCNA SELECTION COMMITTEE TRAINING
Presentation transcript:

Qualification Based Selection

Qualifications Based Selection – Basing selection of design professionals on their qualifications first and foremost through RFP or RFQ process “Best qualified” is determined by the agency Design professional under the law is defined as an architect, engineer, landscape architect, land surveyor or construction manager “Best qualified” is determined by the agency Design professional under the law is defined as an architect, engineer, landscape architect, land surveyor or construction manager What is QBS?

Why QBS? Allows professionals to compete on their ability to serve you Do you understand your design professional and does your design professional understand your project?

Why QBS? Why QBS? Seek the best value for the health and welfare of the public Design costs are a low percentage of the construction and maintenance costs of the project (a few dollars saved in design could end up in increased construction and maintenance costs) Develop a partnership between agency and the design professional

The Idaho Law Idaho Code – Professional Service Contracts with Design Professionals, Construction Managers and Professional Land Surveyors For projects with design fees over $25,000 – oEstablish and make available selection criteria and procedures oDevelop RFP/RFQ and publish notice oSelect “best qualified” firms and rank in order of qualifications oBegin negotiation on scope of work and fees with top ranked firm oIf the agency cannot reach a mutual agreement, move to the next firm on the list oWhen an agreement is reached, develop a contract Agencies may ask for firm rates, overhead multipliers but cannot ask for the fee or other costs. None of this information may be used in the selection process.

The Idaho Law Idaho Code – Professional Service Contracts with Design Professionals, Construction Managers and Professional Land Surveyors For projects with design fees under $25,000 – oThe agency may use the guidelines set forth for projects over $25,000 or may “establish its own guidelines for selection based upon demonstrated competence and qualifications to perform the type of services required.” Other Points: o Associated or Phased Projects o Hiring Roster oSimilar Federal Law – the Brooks Act

Development of the RFP/RFQ Owner sets the criteria for the project and the qualifications Specifies the type and size of the project Extent and scope of the consultant’s responsibilities Project budget Process for selection Special client requirements Proposal format References

Ranking the Firms Some criteria you can consider: Expertise Project Understanding Schedule – Can they perform? Prior Experience (firm and/or individual staff) References Licensing and Registration as appropriate Process – Written proposals Interview Process We can provide expertise on how to rank

QBS and Design Build What is design build as a delivery method? What is design build as a delivery method? How does QBS fit in? How does QBS fit in? What are some of the challenges? What are some of the challenges? –Designer and Contractor the same –Oversight –Knowledge of Process –Time Sensitivity

QBS and Sub-Contractors What does the law say? What does the law say? Identify sub as part of the process and part of your RFQ/RFP Identify sub as part of the process and part of your RFQ/RFP Hiring a contract engineer Hiring a contract engineer

QBS Facilitator Council Who are they? Group of design and public organizations including: American Council of Engineering Companies of Idaho (ACEC of I) American Institute of Architects (AIA) Idaho Society of Professional Engineers (ISPE) Idaho Society of Professional Land Surveyors (ISPLS) Structural Engineers Association of Idaho (SEAI) American Public Works Association (APWA) Public Works Directors Assoc. of Association of Idaho Cities (AIC) American Society of Landscape Architects (ASLA) Local Highway Technical Assistance Council (LHTAC)

QBS Facilitator Council P.O. Box 8224 Boise, ID QBS Facilitator Council P.O. Box 8224 Boise, ID