HV Cable Suitable to sustain up to 15 kV Cable characteristics: 1.According CERN safety instruction IS 23 2.Single conductor- = 0.16 mm 3.Conductor resistance.
Advertisements

Recap Clamp 1008 and Production RIKEN/RBRC Itaru Nakagawa 1.
The Multi-PMT Optical Module P.Kooijman, University of Amsterdam University of Utrecht Nikhef.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Capacitance and Dielectrics AP Physics C. Applications of Electric Potential Is there any way we can use a set of plates with an electric field? YES!
Lecture 101 Introduction to Energy Storage Elements: The Capacitor.
ECE 201 Circuit Theory I1 Step Response of an RC Circuit + v C (t) - i(t) Close the switch at t = 0 Write KCL at the top node Allow for the possibility.
LHC Beam Dumping system
1 MKBH Erratic Jan Uythoven On behalf of the ABT team (Viliam, Nicolas M., Etienne, Laurent, Francesco etc…..) MPP meeting 8/5/2015.
FHCT SEB cross-section measurements at H4IRRAD and with cosmic rays and its influence to LHC abort system reliability Viliam Senaj RadWG meeting 04/10/2011.
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
LBDS commissioning – MKD tests Viliam Senaj, 11/12/2013.
Solid-state based 60 kV 15 kA switch for the SPS vertical beam dumping kicker magnet L. Ducimetière, P. Faure, V. Senaj.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) - Review.
Characterization of the electrical response of Micromegas detectors to spark processes. J.Galan CEA-Saclay/Irfu For the RD51 meeting.
Chapter 30 Inductance. Self Inductance When a time dependent current passes through a coil, a changing magnetic flux is produced inside the coil and this.
Fast high-voltage, high-current switching using stacked IGBTs
TRISHUL Winding Solutions Pvt Ltd
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
Proposed LHC beam dumping kicker generator modifications for LS2 TE-TM Meeting Viliam Senaj 07/07/2015.
Eric Prebys USPAS, Knoxville, TN, Jan , 2014.
LIBD on LBDSmeeting Viliam Senaj 04/02/2014. MKB test MKB vacuum level satisfactory for beginning of HV test: – B1: between 3.1x10 -7 and 5.7x10 -7 (new.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
CERN ISOLDE / HIE ISOLDE 1 Isolde Target Modulator Prototype development prepared by T. Gharsa TE-ABT-EC CERN.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Design and fabrication of electrical measurement system for microchannel plates (LAPD weekly group meeting) Feb Anil Mane, Qing Peng, Jeffrey Elam.
MKD Reliability run Viliam Senaj TCM meeting 18/11/2014.
MKD dust related actions Viliam Senaj Technical Coordination Meeting 27/01/2015.
Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.
Sketching Basic Kicker System Parameters W. Bartmann, T. Fowler, B. Goddard, T. Kramer.
ELENA Fast Deflectors Generators N.Voumard, T. Gharsa.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
SBDS – MKDV/H: The new MKDV Generator and additional Magnet for BA5 installation V. Senaj, L. Ducimetière November 20 th 2015.
Technology Department 7 May 2015A.Adraktas1 MKD 3D field calculations A. Adraktas Acknowledgments: V. Senaj MKD meeting, 7 May 2015.
Technology Department 2 April 2015A.Adraktas1 MKD 3D field calculations A. Adraktas Acknowledgments: V. Senaj MKD meeting, 2 April 2015.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
FHCT SEB cross-section measurements at H4IRRAD and consequences for MKD reliability Viliam Senaj LIBD meeting 24/01/2012.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
P3GP3G Transportable pulsed-power generator for high-energy experimentation B M Novac 1, I R Smith 1, P Senior 1, C Greenwood 1 and G Louverdis 2 1 Department.
Fast Grid Pulse Modulation
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
R&D on Hadron Blind detector, recent results Issues addressed: - gain limits in CF 4 with heavily ionizing particles - operation.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
6 Week industrial Training Presentation
LBDS YETS activity report Viliam Senaj MKD meeting, 19/01/2016.
MKDV upgrade LIU-SPS ABT meeting V. Senaj, L. Ducimetiere, P. Faure November 4 th 2014.
Leakage current test & switched HV stress test of ALICE TRD / TPC capacitors TRD status meeting,
Outcome of BI.DIS Fast Interlocks Peer Review
Plans for this week MWPC: wire stretching today
Capacitance and Dielectrics
Capacitance In the picture below, the capacitor is symbolized by a set of parallel lines. Once it's charged, the capacitor has the same voltage as the.
HO correctors update Massimo Sorbi and Marco Statera
Preliminary results for electron lens with beam current of 20 A
Fast retrigger path What threshold level we need for the fast trigger path?
Proposition of MKD & MKBH modification with the goal to reduce maximum voltage (and risk of erratic) Viliam Senaj, 05/05/2017.
Status of the CERN chopper.
Fast High Current Thyristor SEB test
Viliam Senaj MKD meeting 23/05/2017
Overview of LBDS related tasks
FCC hh dump kicker - switch topologies and impact on beam
Noise on chambers M1R4 N.Bondar
TPC Field Cage Progress Report
Study of Chinese oil-less chamber
Capacitance AP Physics B.
First Test of Piezo-Supplies
Capacitance AP Physics 2.
KFA10 status 20/05/2019 Currently:
Wien filter 2 06/05/2019 Gabriel Palacios.
Presentation transcript:

MKD stack upgrade MKD generator meeting Viliam Senaj 23/06/2015

Effect of return rod displacement RR displacement [mm]0 Present situation Inductance stack [nH] Inductance MKD total [nH] TeV [kV] Emax [MV/m] Trise increase [ns]

Solution with return rods displaced by 20 mm Return rod displaced by 20 mm Araldite insulation of RR Modified top insulator – upper tube included Reduced diameter of 4 upper HV deflectors and full insulation by araldite HV contact insulated by araldite Modified 4 top snubber capacitors – araldite tube around instead of HV deflectors

Solution with return rods displaced by 20 mm

Time plan Drawing of machining plans ~ 2 weeks Procurement of raw material for 3 switches ~ 2 months Machinning ~ 4 weeks Assembly ~ 3 days Test of single stack in HV case up to 40 kV ~ 1 week Test inside generator ~ 6 months

Magnet kV o vs 20 mm displacement (132 vs 165 nH)

Main dividers 2 x 100 MΩ

Main dividers 2 x 100 MΩ - solution

HV divider 10 x 5 MΩ, top deflector

HV divider 10 x 5 MΩ – solution

HV contact region - today

HV contact region - solution

Final solution

MKD E/B2 freewheel signal

MKD schematics